Skip to content

ASHIANA AMARAH PHASE II

by Ashiana Housing · Sector 93, Gurugram

Not on our price list yet

Possession 15 Oct 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 93, Gurugram3.1 km from Dwarka Expressway, in a straight line
Carpet area
about 1,102 sq ft
In m²about 102.4 m², the average flat, as declared
Registered by
ASHIANA HOUSING LIMITEDthe company that filed it, for Ashiana Housing
Timeline
  1. 17 May 2022Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 15 Oct 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside15,936 m² in all, by use
  • Roads4,292 m² · 27%
  • Green belts3,211 m² · 20%
  • Apartment buildings2,532 m² · 16%
  • Other usesas the form names them: Road surrendered, Street lighting, Strom water drainage2,296 m² · 14%
  • Parks and playgrounds2,254 m² · 14%
  • Parking863 m² · 5%
  • Sewage and waste treatment488 m² · 3%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Kitchen1 stainless steel sink with one bowl of 160-200 MM depth and a drain board, 1 swival type sink mixer, 2 CP angle valve for in and OUT of hot water geyser, 1CP angle valve for water purifier unit/RO, no TAP is provided below sink, piped LPG gas with LPG meter WILL be provided, wooden kitchen cabinet, kitchen chimney with hob and chimney
  • FloorsUnits (a)living/dining, entrance foyer, corridor leading to bedrooms: vitrified tiles (600X600) or (600X1200). (B) master and all other bathrooms: ceramic tiles (300X300 or other sizes up to 600X600) and/or combination. (C) balcony: ceramic tiles (300X300 or 300X600 other sizes up to 450X450 and/or combination) suitable quality glazed/MATT finish. (E) OPEN terrace: KOTA stone/other local stone/ceramic tiles of appropriate quality/stone mosaic floor.
  • WallsCeramic tiles up to 2.0 to 2.1 M height from floor level and above the tiles or tile 0.60 meter- SAND-cement plaster and a coat of POP with coating of emulsion paint.
  • BathroomsSanitary wares: hindware/ROCA/kohler/jaquar/american standard RAK/vitra or equivalent bath fittings, basin mixer, wall mixer and shower of jaguar/ROCA/american standard/ grohe or equivalent and other angle valve either of CP or PTMT of standard make LIKE JAL/continental/prayag or equivalent
  • WindowsBed rooms;drawing/dining & kitchen: 2-3 track aluminum/UPVC framed window, with 2-3 sliding panels(depending on SIZE) with clear FLAT glass/6MM toughened glass and provision for PLY MESH shutter. all bathrooms/powder room: top hung/louvered with frosted glass/PIN HEAD no FLY MESH shutter is provided.2 numbers well support MS horizontal BAR across the window opening at suitable height.
  • Main door(a) MAIN entrance: 1 HOUR FIRE rated MS/ wooden/MS in wooden finish shutter with handle and LOCK system
  • Electrical fittingsConcealed conduits with copper wires. convenient position & distribution of light and power plugs and provision for electrical chimney above platform and water purifier point in kitchen. (B) modular electrical switches with sockets and fan regulators of SSK/anchor/north WEST/legrand or equivalent

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 93, GurugramSector 93, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km
  • Delhi–Gurugram–SNB RRTS4.8 km
  • Sohna Elevated Corridor (NH-248A)10.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 7

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is ASHIANA AMARAH PHASE II registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/685/417/2023/29. Valid to 15 Oct 2027.

The source ↗
What is the possession timeline for ASHIANA AMARAH PHASE II?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 15 Oct 2027. Its registration runs to 15 Oct 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ASHIANA AMARAH PHASE II?From the records · Map pin and road lines, read 6 Sep 2026

ASHIANA AMARAH PHASE II is in Sector 93, Gurugram; the site address declared to HARERA is Revenue Estate Of Village- Wazirpur, Sector 93, Distt. Gurugram, Haryana. In a straight line it is about 3.1 km from Dwarka Expressway, 4.8 km from Delhi–Gurugram–SNB RRTS and 10.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ASHIANA AMARAH PHASE II?From the records · HARERA, read 4 Nov 2026

ASHIANA AMARAH PHASE II is a Ashiana Housing project, registered by its company ASHIANA HOUSING LIMITED.

The source ↗Ashiana Housing's projects and court record

The records

What the registers hold for ASHIANA AMARAH PHASE II: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/685/417/2023/29: Registered. Valid to 15 Oct 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 41 OF 2010 is on the DTCP register, valid to 6 Jun 2031.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 17 May 2022, building plans 17 May 2022.Declared to HARERA, read 29 Oct 2026
The court record of Ashiana Housing’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 45 HARERA files, with the dates we read them
Registration no.
GGM/685/417/2023/29
Registration valid till
15 Oct 2027
Declared possession
15 Oct 2027

Declared by the promoter to HARERA

Land area
3.9378 (Acre) (15,935.71 sq m)
FAR
the application prints 182.98, which is not a ratio
licence
41 of 2010 (7-06-2010)
Estimated project cost
₹170.31 crore
Cost of land
₹13.21 crore
Layout plan, declared approved (field 5a)
17 May 2022
Building plans, declared approved
17 May 2022
Construction to start
15 Apr 2023
Completion declared for
15 Oct 2027
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 224 units · 22,943.2 sq m carpet · 4 towers · total for 224 flats, about 102.4 m² each
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. ENVIRONMENTAL CLEARANCE — declared: already been obtained (26 Nov 2021)
  • II. FOREST NOC — declared: already been obtained (29 Dec 2021)
  • III. PORTABLE WATER ASSURANCE — declared: already been obtained (4 Aug 2021)
  • IV. AIRPORT AUTHORITY OF INDIA NOC — declared: already been obtained (16 Aug 2021)
  • V. CONSTRUCTION WATER NOC — declared: already been obtained (23 Jul 2021)
  • VI. LICENSE OF 41 OF 2010 — declared: already been obtained (7 Jun 2010)
On file with HARERA · 45 files

On file with HARERA (45)

Plans

Site plan

2 files
Site Plan21 Mar 2023Approved Site Plan28 Dec 2022

Layout plan

1 file
Latest Layout Plan28 Dec 2022

Zoning plan

1 file
Zoning Plan28 Dec 2022

Demarcation plan

1 file
Demarcation Plan28 Dec 2022

Building plans

14 files
Building Plan Approval Letter (BR-III)21 Mar 20233 + 2T Type Elevations C & D A-1521 Mar 20233 + 2T Type Elevations A & B A-0821 Mar 2023

Floor plans

6 files
Parking Plan21 Mar 20233 + 2T Type Mumty & Machine Rm. Plan & Area Calculations A-1321 Mar 20233 + 3T Type Stilt & First Floor Plan & Area Calculations A-1721 Mar 2023

Services

Sewerage and drainage

2 files
Storm Water Drainage Plan21 Mar 2023Sewerage Plan21 Mar 2023

Electricity

2 files
Street Light Plan21 Mar 2023Electricity Supply Plan21 Mar 2023

Roads

1 file
Roads and Pavement Plan21 Mar 2023

Landscape and green areas

1 file
Landscape Plan21 Mar 2023

Service plans

3 files
Service Plan Approval Letter21 Mar 2023Solid Waste Management Plan21 Mar 2023Service Plans on the Layout28 Dec 2022

Approvals and clearances

DTCP licence

3 files
Renewal of License 41 of 201021 Mar 2023LC-IV21 Mar 2023Licence Copy with Land Schedule28 Dec 2022

Environment clearance

1 file
Environment Clearance21 Mar 2023

Fire safety

2 files
Fire Fighting Plan & Water Supply Plan21 Mar 2023Fire Scheme21 Mar 2023

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration28 Dec 2022

Money

Accounts and finance

2 files
Non-Default Certificate from a CA22 Mar 2023CA Certificate on the Application’s Figures29 Dec 2022

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit21 Mar 2023Bank Undertaking21 Mar 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

41 OF 2010 · Ramprastha Estates Pvt Ltd · GURGAON-MANESAR

Licence valid to 6 Jun 2031

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Dec 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

41 OF 2010: 35 parcels, 22.3437 acres in all, in Wazirpur (hadbast 115), tehsil Harsaru.

The licence register prints the same licensed area, 22.3425 acres.

  • 86//1/14 kanal
  • 86//1/24 kanal
  • 86//10/14 kanal
  • 86//10/24 kanal
Show the other 31 parcels
  • 86//118 kanal
  • 86//128 kanal
  • 86//13/1 mi5 kanal 6 marla
  • 86//14min4 kanal 7 marla
  • 86//15min1 kanal 7 marla
  • 86//19min4 kanal 8 marla
  • 86//28 kanal
  • 86//38 kanal
  • 86//4min8 kanal 3 marla
  • 86//6 min4 kanal 15 marla
  • 86//7/16 kanal
  • 86//7/22 kanal
  • 86//88 kanal
  • 86//98 kanal
  • 83//16/22 kanal 10 marla
  • 83//17/22 kanal 10 marla
  • 83//18/47 marla
  • 83//23/11 kanal 12 marla
  • 83//23/26 kanal 8 marla
  • 83//248 kanal
  • 83//258 kanal
  • 83//18/22 kanal 2 marla
  • 84//20/14 kanal
  • 84//20/2/16 marla
  • 84//20/2/23 kanal 14 marla
  • 84//21/14 kanal
  • 84//21/24 kanal
  • 84//228 kanal
  • 84//237 kanal
  • 87//58 kanal
  • 87//68 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Wazirpur (hadbast 115), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 86//1/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan21 Mar 2023Approved Site Plan28 Dec 2022

Layout plan

1 file
Latest Layout Plan28 Dec 2022

Building plans

14 files
Building Plan Approval Letter (BR-III)21 Mar 20233 + 2T Type Elevations C & D A-1521 Mar 20233 + 2T Type Elevations A & B A-0821 Mar 20233 + 3T Type Elevations A & B A-2021 Mar 20233 + 2T Type Typical & Terrace Plan & Area Calculations A-0621 Mar 20233 + 3T Type Sections 1 & 2 A-2221 Mar 2023

Floor plans

6 files
Parking Plan21 Mar 20233 + 2T Type Mumty & Machine Rm. Plan & Area Calculations A-1321 Mar 20233 + 3T Type Stilt & First Floor Plan & Area Calculations A-1721 Mar 20233 + 2T Type Stilt & First Floor Plan & Area Calculations A-0521 Mar 20233 + 2T Type Mumty & Machine Rm Plan & Area Calculationsa-0721 Mar 20233 + 2T Type Stilt & First Floor Plan & Area Calculations A-1121 Mar 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (45 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2270 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ashiana Housing

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.