ATS GRANDSTAND PHASE-2

by Homekraft Infra · Sector 99A, Gurugram

Not on our price list yet

Possession 30 Jun 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 99A, Gurugram1.1 km from Dwarka Expressway, in a straight line
Carpet area
1,206–1,634 sq ft
In m²about 112–152 m², as declared
Registered by
HOMEKRAFT INFRA PRIVATE LIMITEDthe company that filed it, for Homekraft Infra
Timeline
  1. 10 Jul 2026Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Mar 2031Registration valid toHARERA, read 2 Nov 2026
  3. 30 Jun 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

362homes, 1,206 to 1,634 sq ft of carpet area
  • 1,000–1,500 sq ft1,206 sq ft216
  • 1,500–2,000 sq ft1,634 sq ft146

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside3.568 acres in all, by use
  • Parks and playgrounds1.242 acres · 35%
  • Other usesas the form names them: Rwh, Ess, Open area0.801 acres · 22%
  • Roads0.76 acres · 21%
  • Apartment buildings0.595 acres · 17%
  • Parking0.17 acres · 5%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenWall tiles 600MM height above kitchen counter SLAB in appropriate colour & paint."UPVC sections profile-openable ΤΥΡΕ 6ΜΜ ΤΗK. clear float glass"
  • Lifts"(1) flats:-04 units/floor (BC-type); 02 units/floor (a-type) (2) total no of lift: towers-10"
  • FloorsVitrified tiles flooring, wooden flooring, ceramic tiles, anti-skid ceramic flooring
  • WallsGlazed tiles (450MM X 600MM)/ (300MM X 450MM)
  • BathroomsCeramic tiles, glazed tiles upto 2400MM and oil bound distemper of appropriate colour above IT upto ceiling, flush/SKIN doors-polished
  • Windows"UPVC sections profile-three track system 6MM THK. clear float glass handle : casement type"
  • Main doorEngineered door with polished wood veneer
  • Electrical fittingsHeavy DUTY conduit (2.0MM thick) for SLAB, medium DUTY conduit for wall - ISI marked, confirming to is codes, modular type switch/sockets for flats

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 99A, GurugramSector 99A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.1 km
  • Delhi–Gurugram–SNB RRTS6.0 km
  • Sohna Elevated Corridor (NH-248A)8.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is ATS GRANDSTAND PHASE-2 registered with HARERA?From the records · HARERA, read 2 Nov 2026

HARERA lists it as GGM/1082/818/2026/54. Valid to 31 Mar 2031.

The source ↗
What is the possession timeline for ATS GRANDSTAND PHASE-2?From the records · HARERA, read 2 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2031. Its registration runs to 31 Mar 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ATS GRANDSTAND PHASE-2?From the records · Map pin and road lines, read 6 Sep 2026

ATS GRANDSTAND PHASE-2 is in Sector 99A, Gurugram; the site address declared to HARERA is Sector 99a, Gurugram. In a straight line it is about 1.1 km from Dwarka Expressway, 6.0 km from Delhi–Gurugram–SNB RRTS and 8.2 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ATS GRANDSTAND PHASE-2?From the records · HARERA, read 2 Nov 2026

ATS GRANDSTAND PHASE-2 is a Homekraft Infra project, registered by its company HOMEKRAFT INFRA PRIVATE LIMITED.

The source ↗Homekraft Infra's projects and court record

The records

What the registers hold for ATS GRANDSTAND PHASE-2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1082/818/2026/54: Registered. Valid to 31 Mar 2031.HARERA, read 2 Nov 2026 · See it on HARERA ↗
  • Land licence 37 OF 2013 is on the DTCP register, valid to 2 Jun 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 10 Jul 2026.Declared to HARERA, read 29 Oct 2026
The court record of Homekraft Infra’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 67 HARERA files, with the dates we read them
Registration no.
GGM/1082/818/2026/54
Registration valid till
31 Mar 2031
Declared possession
30 Jun 2031

Declared by the promoter to HARERA

Land area
3.568 (Acre) (14,439.18 sq m)
FAR
3.4 proposed of 3.4 permissible
licence
37 of 2013 Dated 03.06.2013
Estimated project cost
₹927.73 crore
Cost of land
₹327.41 crore
Building plans, declared approved
10 Jul 2026
Construction to start
1 Jul 2026
Completion declared for
30 Jun 2031
Declared inventory · 4 types

Declared inventory

  • Apartment/Shops/Other Buildings · 4 units · 151.8 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 142 units · 151.8 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 6 units · 112.04 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 210 units · 112.04 sq m carpet · 3 towers · one flat
Statutory approvals, as declared · 14

Statutory approvals, as declared

  • I. PHASING PLAN LETTER — declared: already been obtained (22 Jul 2026)
  • II. COD — declared: already been obtained (19 Jun 2026)
  • III. ASSURANCE FOR WATER SUPPLY — declared: already been obtained (7 Jan 2026)
  • IV. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (9 Jan 2026)
  • V. ASSURANCE OF STORM WATER — declared: already been obtained (8 Jan 2026)
  • VI. BR-III — declared: already been obtained (10 Jul 2026)
  • VII. FOREST NOC — declared: already been obtained (20 Dec 2013)
  • VIII. HUDA CONSTRUCTION — declared: already been obtained (12 Aug 2026)
  • IX. AAI — declared: already been obtained (24 Jul 2019)
  • X. LICENSE — declared: already been obtained (3 Jun 2013)
  • XI. EC — declared: applied for but yet to receive (19 May 2026)
  • XII. FIRE SCHEME APPROVAL — declared: applied for but yet to receive (13 Jul 2026)
  • XIII. ELECTRICAL LOAD — declared: applied for but yet to receive (17 Jul 2026)
  • XIV. SERVICE PLAN ESTIMATE APPROVAL — declared: applied for but yet to receive (14 Jul 2026)
On file with HARERA · 67 files

On file with HARERA (67)

Plans

Site plan

3 files
Approved Site Plan14 Jul 2026Site Plan Sewer Layout14 Jul 2026Site Plan Water Supply & Irrigation Layout14 Jul 2026

Layout plan

2 files
Phasing Plan Drawing15 Sept 2026Latest Layout Plan14 Jul 2026

Zoning plan

1 file
Zoning Plan14 Jul 2026

Demarcation plan

1 file
Demarcation Plan14 Jul 2026

Building plans

17 files
Type A, Tower 4-20TH, 30th Floor Plans, Terrace, Mumty, Machine, Oth Plans, Ground Coverage & Area Diagram14 Jul 2026Type-A Tower 7- Elevation & Section14 Jul 2026Type-B, Tower 5- Elevations & Section14 Jul 2026

Floor plans

11 files
Surface Parking Calculation14 Jul 2026Stilt 1 Level Plan Part B14 Jul 2026Type A, Tower 7- Stilt-1, Stilt -2, 2nd-19th & 21st to 29th and 31st to 38th Typical Floor Plans & Area Diagram14 Jul 2026

Services

Sewerage and drainage

6 files
Ug Tank & STP Layout14 Jul 2026Assurance of Sewerage Connection14 Jul 2026Stilt 1 Floor Drainage Layout14 Jul 2026

Water supply

1 file
Assurance of Water Supply14 Jul 2026

Electricity

1 file
Electrical Load15 Jul 2026

Landscape and green areas

1 file
Green Area Calculation14 Jul 2026

Service plans

2 files
Service Plan Estimate Approval15 Jul 2026Service Plans on the Layout14 Jul 2026

Approvals and clearances

DTCP licence

4 files
LC-IV14 Jul 2026COD14 Jul 2026LOI14 Jul 2026Licence Copy with Land Schedule14 Jul 2026

Environment clearance

1 file
EC Applied15 Jul 2026

Fire safety

2 files
Fire Scheme Approval15 Jul 2026Site Plan Fire Layout14 Jul 2026

Other NOCs and clearances

2 files
AAI15 Jul 2026Forest NOC14 Jul 2026

Land records

Land records

6 files
Revenue Record Entry of Licence and Collaboration16 Jul 2026Sale Deed15 Jul 2026NEC15 Jul 2026

Money

Accounts and finance

3 files
Cash Flow Statement14 Aug 2026CA Certificate on the Application’s Figures14 Aug 2026Non-Default Certificate from a CA15 Jul 2026

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit14 Aug 2026Bank Undertaking15 Jul 2026

Other filings

Other filings

1 file
HUDA Construction14 Jul 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

37 OF 2013 · Hasta Infrastructure Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 2 Jun 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Jul 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 2 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

37 OF 2013: 30 parcels, 11.5875 acres in all, in Gopalpur (hadbast 47), tehsil Harsaru.

The licence register prints the same licensed area, 11.59 acres.

  • 47//21/11 kanal 7 marla
  • 46//25/35 kanal 8 marla
  • 49//37 kanal 8 marla
  • 49//4/14 kanal
Show the other 26 parcels
  • 49//4/21 kanal
  • 48//1/23 kanal 8 marla
  • 48//1/32 kanal 12 marla
  • 48//10/14 kanal
  • 48//10/21 kanal 1 marla
  • 47//21/210 marla
  • 48//1/11 kanal 8 marla
  • 49//5/32 kanal
  • 46//11/213 marla
  • 46//12/1/29 marla
  • 46//12/22 kanal 8 marla
  • 46//13/16 marla
  • 46//13/25 kanal 18 marla
  • 46//18/17 kanal 8 marla
  • 46//19/12 kanal 12 marla
  • 46//19/25 kanal 8 marla
  • 46//218 kanal
  • 46//22/1/15 kanal 10 marla
  • 46//23/2/17 kanal
  • 46//23/2/28 marla
  • 46//24/16 marla
  • 46//24/27 kanal 5 marla
  • 46//24/39 marla
  • 46//25/16 marla
  • 46//25/23 kanal 19 marla
  • 46//25/47 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gopalpur (hadbast 47), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 47//21/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Approved Site Plan14 Jul 2026Site Plan Sewer Layout14 Jul 2026Site Plan Water Supply & Irrigation Layout14 Jul 2026

Layout plan

2 files
Phasing Plan Drawing15 Sept 2026Latest Layout Plan14 Jul 2026

Building plans

17 files
Type A, Tower 4-20TH, 30th Floor Plans, Terrace, Mumty, Machine, Oth Plans, Ground Coverage & Area Diagram14 Jul 2026Type-A Tower 7- Elevation & Section14 Jul 2026Type-B, Tower 5- Elevations & Section14 Jul 2026Type-A Tower 7- Elevation & Section14 Jul 2026Type-B, Tower 5- Elevations & Section14 Jul 2026Type-B, Tower 10-Machine Room, Oth & Mumty Terrace Plan and Ground Covered Area Diagram14 Jul 2026

Floor plans

11 files
Surface Parking Calculation14 Jul 2026Stilt 1 Level Plan Part B14 Jul 2026Type A, Tower 7- Stilt-1, Stilt -2, 2nd-19th & 21st to 29th and 31st to 38th Typical Floor Plans & Area Diagram14 Jul 2026Type-B, Tower 5- Stilt-1, Stilit-2, 2nd-38th Floor, Teerace Floor, Plans & Area Diagram14 Jul 2026Type A, Tower 4-Gr,stilt-1, 1ST, Stilt 2, 2nd -19th & 21st to 29th and 31st to 39th Typical Floor Plans & Area Diagram14 Jul 2026Stilt 2 Level Plan Part B14 Jul 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (67 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/4242 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Homekraft Infra

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.