TATVA ESTATES

by Alton Buildtech India · Sector 99A, Gurugram

Not on our price list yet

Possession 4 Dec 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 99A, Gurugram1.1 km from Dwarka Expressway, in a straight line
Registered by
ALTON BUILDTECH INDIA PVT LTDthe company that filed it, for Alton Buildtech India
Timeline
  1. 25 Jan 2023Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 4 Dec 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 99A, GurugramSector 99A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.1 km
  • Delhi–Gurugram–SNB RRTS6.0 km
  • Sohna Elevated Corridor (NH-248A)8.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is TATVA ESTATES registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/699/431/2023/43. Valid to 4 Dec 2027.

The source ↗
What is the possession timeline for TATVA ESTATES?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 4 Dec 2027. Its registration runs to 4 Dec 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around TATVA ESTATES?From the records · Map pin and road lines, read 6 Sep 2026

TATVA ESTATES is in Sector 99A, Gurugram; the site address declared to HARERA is Sector 99a, Gurgaon. In a straight line it is about 1.1 km from Dwarka Expressway, 6.0 km from Delhi–Gurugram–SNB RRTS and 8.2 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building TATVA ESTATES?From the records · HARERA, read 4 Nov 2026

TATVA ESTATES is a Alton Buildtech India project, registered by its company ALTON BUILDTECH INDIA PVT LTD.

The source ↗Alton Buildtech India's projects and court record

The records

What the registers hold for TATVA ESTATES: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/699/431/2023/43: Registered. Valid to 4 Dec 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 200 OF 2022 is on the DTCP register, valid to 4 Dec 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 25 Jan 2023.Declared to HARERA, read 29 Oct 2026
The court record of Alton Buildtech India’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 26 HARERA files, with the dates we read them
Registration no.
GGM/699/431/2023/43
Registration valid till
4 Dec 2027
Declared possession
4 Dec 2027

Declared by the promoter to HARERA

Land area
5.0000 (Acre) (20,234.28 sq m)
FAR
1 proposed of 1 permissible
licence
200 of 2022
Estimated project cost
₹79.14 crore
Cost of land
₹41.94 crore
Layout plan, declared approved (field 5a)
25 Jan 2023
Construction to start
1 Apr 2023
Completion declared for
4 Dec 2027
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (20 Dec 2022)
  • II. LAYOUT — declared: already been obtained (25 Jan 2023)
  • III. ZONING — declared: already been obtained (25 Jan 2023)
On file with HARERA · 26 files

On file with HARERA (26)

Plans

Site plan

1 file
Approved Site Plan7 Feb 2023

Layout plan

1 file
Latest Layout Plan6 Feb 2023

Zoning plan

1 file
Zoning Plan6 Feb 2023

Demarcation plan

1 file
Demarcation Plan6 Feb 2023

Building plans

1 file
Approved Building Plans, Full Set7 Feb 2023

Services

Sewerage and drainage

4 files
Storm Water Layout1 Mar 2023Sewerage Layout1 Mar 2023Assurance for Sewerage Connection6 Feb 2023Assurance for Storm Water Connection6 Feb 2023

Water supply

3 files
Flushing Water Supply Layout1 Mar 2023Domestic Water Supply Layout1 Mar 2023Assurance for Water Supply6 Feb 2023

Roads

1 file
Road Layout1 Mar 2023

Service plans

1 file
Service Plans on the Layout6 Feb 2023

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule6 Feb 2023

Land records

Land records

4 files
Revenue Record Entry of Licence and Collaboration6 Feb 2023Aks Sizra6 Feb 2023Jamabandi Copy6 Feb 2023Mutation Copy6 Feb 2023

Money

Accounts and finance

3 files
Cash Flow Statement1 Mar 2023Non-Default Certificate from a CA6 Feb 2023CA Certificate on the Application’s Figures6 Feb 2023

The promoter’s papers

Declarations and affidavits

3 files
Promoter Affidavit6 Feb 2023The Promoter’s Declaration on Affidavit6 Feb 2023Bank Undertaking6 Feb 2023

Company papers

1 file
Board Resolution6 Feb 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

200 OF 2022 · Alton Buildtech India Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 4 Dec 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 7 Feb 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

200 OF 2022: 6 parcels, 5 acres in all, in Gopalpur (hadbast 47), tehsil Harsaru.

The licence register prints the same licensed area, 5 acres.

  • 25//3/11 kanal 1 marla
  • 25//49 kanal 7 marla
  • 28//14/26 kanal
  • 28//178 kanal
Show the other 2 parcels
  • 28//23/27 kanal 12 marla
  • 28//248 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gopalpur (hadbast 47), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 25//3/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan7 Feb 2023

Layout plan

1 file
Latest Layout Plan6 Feb 2023

Building plans

1 file
Approved Building Plans, Full Set7 Feb 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (26 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2343 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Alton Buildtech India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.