Sector 99A, Gurugram1.1 km from Dwarka Expressway, in a straight line
Registered by
BST DEVELOPERS INDIA PVT LTDthe company that filed it, for Lightstone Developers India
Timeline
  1. 27 Oct 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 25 Jan 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside22,815 m² in all, by use
  • Plots for sale11,637 m² · 51%
  • Roads6,129 m² · 27%
  • Land for community services, handed to the government2,282 m² · 10%
  • Parks and playgrounds1,711 m² · 8%
  • Shops and offices456 m² · 2%
  • Sewage and waste treatment450 m² · 2%
  • Electricity sub-station150 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 99A, GurugramSector 99A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.1 km
  • Delhi–Gurugram–SNB RRTS6.0 km
  • Sohna Elevated Corridor (NH-248A)8.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is GREEN BHOOMI registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/669/401/2023/13. Valid to 25 Jan 2027.

The source ↗
What is the possession timeline for GREEN BHOOMI?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 25 Jan 2027. Its registration runs to 25 Jan 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around GREEN BHOOMI?From the records · Map pin and road lines, read 6 Sep 2026

GREEN BHOOMI is in Sector 99A, Gurugram; the site address declared to HARERA is Sector 99a, Village Gopalpur, Tehsil Harsaru. In a straight line it is about 1.1 km from Dwarka Expressway, 6.0 km from Delhi–Gurugram–SNB RRTS and 8.2 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building GREEN BHOOMI?From the records · HARERA, read 4 Nov 2026

GREEN BHOOMI is a Lightstone Developers India project, registered by its company BST DEVELOPERS INDIA PVT LTD.

The source ↗Lightstone Developers India's projects and court record

The records

What the registers hold for GREEN BHOOMI: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/669/401/2023/13: Registered. Valid to 25 Jan 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 170 OF 2022 is on the DTCP register, valid to 21 Oct 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 27 Oct 2022.Declared to HARERA, read 29 Oct 2026
The court record of Lightstone Developers India’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 25 Jan 2027. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 24 HARERA files, with the dates we read them
Registration no.
GGM/669/401/2023/13
Registration valid till
25 Jan 2027
Declared possession
25 Jan 2027

Declared by the promoter to HARERA

Land area
5.6375 (Acre) (22,814.15 sq m)
FAR
1 proposed of 1 permissible
licence
170 of 2022(22.10.2022)
Estimated project cost
₹49.16 crore
Cost of land
₹28.69 crore
Layout plan, declared approved (field 5a)
27 Oct 2022
Construction to start
26 Jan 2022
Completion declared for
25 Jan 2027
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (27 Oct 2022)
  • II. LAYOUT PLAN — declared: already been obtained (27 Oct 2022)
  • III. SERVICE PLAN ESTIMATES FROM GMDA — declared: already been obtained (23 Nov 2022)
On file with HARERA · 24 files

On file with HARERA (24)

Plans

Site plan

3 files
Pl-Ddjay Bst External Site Plan-R1 Sewer Line18 Aug 2023Pl-Ddjay Bst External Site Plan-R1 Storm Line18 Aug 2023Approved Site Plan1 Dec 2022

Layout plan

2 files
Layout Plan18 Aug 2023Latest Layout Plan1 Dec 2022

Zoning plan

1 file
Zoning Plan14 Dec 2022

Demarcation plan

1 file
Demarcation Plan14 Dec 2022

Building plans

3 files
Pl-Under Ground Water Tank Detail for Approval -18-03-2023-Model18 Aug 2023Pl-Under Ground Water Tank Stru.detail18 Aug 2023Approved Building Plans, Full Set1 Dec 2022

Services

Electricity

1 file
Electrical Load Intimation Letter18 Aug 2023

Service plans

1 file
Service Plans on the Layout1 Dec 2022

Approvals and clearances

Completion certificate (CC)

1 file
Completion Certificate20 Mar 2026

DTCP licence

1 file
Licence Copy with Land Schedule1 Dec 2022

Land records

Land records

3 files
Sizra18 Aug 2023Jamabandi18 Aug 2023Revenue Record Entry of Licence and Collaboration1 Dec 2022

Money

Accounts and finance

5 files
No Loan Certificate18 Aug 2023Non-Default Certificate from a CA18 Aug 2023Cash Flow Statement18 Aug 2023

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit18 Aug 2023Promoter Affidavit Regarding Bank Account18 Aug 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

170 OF 2022 · BST Developers India Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 21 Oct 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 14 Dec 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

170 OF 2022: 6 parcels, 5.6375 acres in all, in Gopalpur (hadbast 47), tehsil Harsaru.

The licence register prints the same licensed area, 5.6375 acres.

  • 31//17 kanal 2 marla
  • 31//108 kanal
  • 31//118 kanal
  • 31//27 kanal 2 marla
Show the other 2 parcels
  • 31//208 kanal
  • 31//9/16 kanal 18 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gopalpur (hadbast 47), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 31//1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Pl-Ddjay Bst External Site Plan-R1 Sewer Line18 Aug 2023Pl-Ddjay Bst External Site Plan-R1 Storm Line18 Aug 2023Approved Site Plan1 Dec 2022

Layout plan

2 files
Layout Plan18 Aug 2023Latest Layout Plan1 Dec 2022

Building plans

3 files
Pl-Under Ground Water Tank Detail for Approval -18-03-2023-Model18 Aug 2023Pl-Under Ground Water Tank Stru.detail18 Aug 2023Approved Building Plans, Full Set1 Dec 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (24 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2207 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Lightstone Developers India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.