Skip to content

SPITI GREENWOOD ESTATE

by Spiti Township · Sector 99A, Gurugram

Not on our price list yet

Possession 23 Aug 2028 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 99A, Gurugram1.1 km from Dwarka Expressway, in a straight line
Registered by
SPITI TOWNSHIP LLPthe company that filed it, for Spiti Township

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside10.057 acres in all, by use
  • Apartment buildings4.64 acres · 46%
  • Other uses1.601 acres · 16%
  • Club house1.006 acres · 10%
  • Parks and playgrounds0.99 acres · 10%
  • Roads0.988 acres · 10%
  • Green belts0.832 acres · 8%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 99A, GurugramSector 99A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.1 km
  • Delhi–Gurugram–SNB RRTS6.0 km
  • Sohna Elevated Corridor (NH-248A)8.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SPITI GREENWOOD ESTATE registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/794/526/2024/21. Valid to 23 Aug 2028.

The source ↗
What is the possession timeline for SPITI GREENWOOD ESTATE?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 23 Aug 2028. Its registration runs to 23 Aug 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SPITI GREENWOOD ESTATE?From the records · Map pin and road lines, read 6 Sep 2026

SPITI GREENWOOD ESTATE is in Sector 99A, Gurugram; the site address declared to HARERA is Sector 99a, Gurgaon. In a straight line it is about 1.1 km from Dwarka Expressway, 6.0 km from Delhi–Gurugram–SNB RRTS and 8.2 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SPITI GREENWOOD ESTATE?From the records · HARERA, read 4 Nov 2026

SPITI GREENWOOD ESTATE is a Spiti Township project, registered by its company SPITI TOWNSHIP LLP.

The source ↗Spiti Township's projects and court record

The records

What the registers hold for SPITI GREENWOOD ESTATE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/794/526/2024/21: Registered. Valid to 23 Aug 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 171 OF 2023 is on the DTCP register, valid to 23 Aug 2028.DTCP, read 3 Nov 2026
The court record of Spiti Township’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 27 HARERA files, with the dates we read them
Registration no.
GGM/794/526/2024/21
Registration valid till
23 Aug 2028
Declared possession
23 Aug 2028

Declared by the promoter to HARERA

Land area
10.05625 (Acre) (40,696.2 sq m)
FAR
1.25 proposed of 1.25 permissible
licence
171 of 2023
Estimated project cost
₹106.67 crore
Cost of land
₹3.30 crore
Construction to start
1 Apr 2024
Completion declared for
23 Aug 2028
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. LICENSE NO. 171 OF 2023 — declared: already been obtained (24 Aug 2023)
On file with HARERA · 27 files

On file with HARERA (27)

Plans

Site plan

1 file
Approved Site Plan23 Feb 2024

Layout plan

1 file
Latest Layout Plan23 Feb 2024

Zoning plan

2 files
Zoning Cum Demarcation Letter6 Jun 2024Zoning Plan23 Feb 2024

Demarcation plan

1 file
Demarcation Plan6 Jun 2024

Building plans

1 file
Approved Building Plans, Full Set23 Feb 2024

Services

Sewerage and drainage

3 files
Drainage System Layout6 Jun 2024Sewerage Layout Plan6 Jun 2024Assurances - Storm Sewerage Drinking Water6 Jun 2024

Water supply

2 files
HUDA Construction Water Approval6 Jun 2024Water Supply Plan6 Jun 2024

Electricity

2 files
Road and Street Lighting Layout6 Jun 2024Electrical Load Approval Letter6 Jun 2024

Service plans

5 files
Approved Service Plans6 Jun 2024Master Plan Approved Service Estimate6 Jun 2024Service Plan Estimate Approval Letter6 Jun 2024

Approvals and clearances

Completion certificate (CC)

1 file
CC uploaded24 Sept 2025

DTCP licence

1 file
Licence Copy with Land Schedule23 Feb 2024

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration23 Feb 2024

Money

Accounts and finance

4 files
Cash Flow Statement6 Jun 2024CA Certificate for Non Default6 Jun 2024CA Certificate on the Application’s Figures23 Feb 2024Non-Default Certificate from a CA23 Feb 2024

The promoter’s papers

Declarations and affidavits

2 files
CA Certificate for Rep-I6 Jun 2024The Promoter’s Declaration on Affidavit23 Feb 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

171 OF 2023 · Spiti Township LLP · GURGAON-MANESAR

Licence valid to 23 Aug 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Feb 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

171 OF 2023: 23 parcels, 10.0563 acres in all, in Gopalpur (hadbast 47), tehsil Harsaru.

The licence register prints the same licensed area, 10.0563 acres.

  • 30//56 kanal 6 marla
  • 30//6/11 kanal
  • 45//135 kanal 11 marla
  • 45//14/13 kanal 9 marla
Show the other 19 parcels
  • 45//162 kanal 5 marla
  • 45//178 kanal
  • 45//187 kanal 10 marla
  • 45//198 kanal
  • 45//24/11 kanal
  • 45//24/27 kanal
  • 45//254 kanal 11 marla
  • 45//7/21 kanal 9 marla
  • 45//88 kanal
  • 49//14 kanal 1 marla
  • 49//10/13 kanal 2 marla
  • 49//10/24 kanal
  • 49//12/2/116 marla
  • 49//13/118 marla
  • 49//14/118 marla
  • 49//15/1/117 marla
  • 49//2/13 marla
  • 49//2/29 marla
  • 49//9/21 kanal 4 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gopalpur (hadbast 47), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 30//5.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan23 Feb 2024

Layout plan

1 file
Latest Layout Plan23 Feb 2024

Building plans

1 file
Approved Building Plans, Full Set23 Feb 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (27 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2824 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Spiti Township

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.