Skip to content

ATS Tourmaline

by Almond Infrabuild · Sector 109, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 109, Gurugram0.8 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
1,064–4,425 sq ft
In m²about 99–411 m², as declared
Registered
10 Aug 2017
Registered by
ALMOND INFRABUILD PVT LTDthe company that filed it, for Almond Infrabuild
Timeline
  1. 26 Jul 2013Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 10 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 9 Aug 2023Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

417homes, 1,064 to 4,425 sq ft of carpet area
  • 1,000–1,500 sq ft1,064–1,347 sq ft300
  • 1,500–2,000 sq ft1,558 sq ft48
  • 2,000–2,500 sq ft2,094–2,451 sq ft52
  • 2,500–3,000 sq ft2,998 sq ft2
  • 3,000 sq ft and above3,281–4,425 sq ft15

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 1 row of a single unit and 74 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside10.41 acres in all, by use
  • Green belts5.52 acres · 53%
  • Roads1.62 acres · 16%
  • Apartment buildings1 acre · 10%
  • Parking0.97 acres · 9%
  • Pavements0.49 acres · 5%
  • Other usesas the form names them: Any0.37 acres · 4%
  • Club house0.2 acres · 2%
  • Parks and playgrounds0.12 acres · 1%
  • Land for community services, handed to the government0.11 acres · 1%
  • Electricity sub-station0.01 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningSplit units in living room, dining, family room & all bed rooms
  • KitchenAll kitchen counters in PRE-polished granite/ marble stone, electrical points for kitchen chimney & hob, washing machine & fridge to be provided. kitchen WILL be provided with modular cabinets of appropriate finish
  • LiftsLifts to be provided for access to all floors from common lobby
  • WardrobesModular wardrobes
  • FloorsVitrified tiles flooring in living, dining & lobby; wooden/ vitrified tiles flooring in bedrooms; vitrified tiles in kitchen, utility & servant room and ceramic tiles in toilets. balconies WILL be in anti-skid ceramic flooring
  • WallsOil bound distemper of appropriate colour on interior walls
  • BathroomsPremium sanitary fixtures, premium chrome plated fittings
  • WindowsUPVC and aluminium fixed and openable windows

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 109, GurugramSector 109, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.8 km
  • Delhi–Gurugram–SNB RRTS5.3 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is ATS Tourmaline registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 41 OF 2017, registered on 10 Aug 2017. The register’s record shows an end date of 9 Aug 2023. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around ATS Tourmaline?From the records · Map pin and road lines, read 6 Sep 2026

ATS Tourmaline is in Sector 109, Gurugram; the site address declared to HARERA is Sector 109, Village- Babupur, Tehsil & District Gurugram, State-Haryana. In a straight line it is about 0.8 km from Dwarka Expressway, 5.3 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ATS Tourmaline?From the records · HARERA, read 4 Nov 2026

ATS Tourmaline is a Almond Infrabuild project, registered by its company ALMOND INFRABUILD PVT LTD.

The source ↗Almond Infrabuild's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for ATS Tourmaline: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 41 OF 2017: Registration lapsed. The register’s record shows an end date of 9 Aug 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 250 OF 2007 is on the DTCP register, valid to 1 Nov 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 26 Jul 2013, building plans 26 Jul 2013.Declared to HARERA, read 29 Oct 2026
The court record of Almond Infrabuild’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 9 Aug 2023. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 26 HARERA files, with the dates we read them
Registration no.
41 OF 2017
Registration date
10 Aug 2017
Registration valid till
9 Aug 2023

Declared by the promoter to HARERA

Land area
10.4187 (Acre) (42,162.98 sq m)
FAR
the application prints 174.91, which is not a ratio
licence
250 of 2007(01-11-2019)
Estimated project cost
₹843.78 crore
Cost of land
₹128.70 crore
Layout plan, declared approved (field 5a)
26 Jul 2013
Building plans, declared approved
26 Jul 2013
Declared inventory · 14 types

Declared inventory — 14 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 1*(TYPE-A TOWER-1) · 2 units · 227.7 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 2*(TYPE-A TOWER-1) · 2 units · 207.08 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 3*(TYPE-A TOWER-1) · 42 units · 194.53 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 4* (TYPE-A TOWER-1) · 2 units · 304.81 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 5*(TYPE-B TOWER-2) · 48 units · 144.74 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 6*(TYPE-B TOWER-2) · 2 units · 278.52 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 7*(TYPE CD TOWER 3,4,5) · 6 units · 201.59 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT TYPE 8*(TYPE CD TOWER 3,4,5) · 150 units · 98.84 sq m carpet · one flat
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. AAI — declared: already been obtained (20 Sept 2012)
  • II. HARYANA STATE POLLUTION BOARD — declared: already been obtained (18 Feb 2014)
  • III. FIRE APPROVAL — declared: already been obtained (13 Dec 2013)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (23 Oct 2013)
  • V. FOREST DEPARTMENT — declared: already been obtained (22 Feb 2013)
  • VI. BUILDING PLAN APPROVAL — declared: already been obtained (26 Jul 2013)
  • VII. APPROVAL OF SERVICE PLAN ESTIMATE — declared: already been obtained (28 Feb 2017)
  • VIII. OCCUPATION CERTIFICATE (OC) — declared: already been obtained (9 Aug 2019)
On file with HARERA · 26 files

On file with HARERA (26)

Plans

Site plan

2 files
Layout Plan, Site Plan7 Feb 2020Approved Site Plan16 Dec 2019

Layout plan

1 file
Latest Layout Plan16 Dec 2019

Zoning plan

1 file
Zoning Plan7 Feb 2020

Demarcation plan

1 file
Demarcation Plan16 Dec 2019

Building plans

2 files
Building Plan Approval Letter (BR-III)7 Feb 2020Approved Building Plans, Full Set16 Dec 2019

Services

Service plans

3 files
Service Plan Estimate7 Feb 2020Service Plan Approval Letter7 Feb 2020Service Plans on the Layout16 Dec 2019

Approvals and clearances

DTCP licence

3 files
LOI7 Feb 2020LC-IV7 Feb 2020Licence Copy with Land Schedule16 Dec 2019

Environment clearance

1 file
Environment Clearance Approval7 Feb 2020

Fire safety

1 file
Fire Scheme Approval7 Feb 2020

Other NOCs and clearances

2 files
Forest NOC7 Feb 2020Airport Height Clearance7 Feb 2020

Land records

Land records

2 files
Encumbrances Details-ATS Tourmaline Almond Infrabuild7 Feb 2020Revenue Record Entry of Licence and Collaboration16 Dec 2019

Money

Accounts and finance

4 files
CA Certificate on the Application’s Figures17 Feb 2020Registration Fee Demand Draft17 Feb 2020Non-Default Certificate from a CA7 Feb 2020Cash Flow Statement16 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit16 Dec 2019

Company papers

1 file
Board Resolution7 Feb 2020

Other filings

Other filings

1 file
Gist of the Important Provisions of the Agreement28 Jan 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

250 OF 2007 · Chintels India · GURGAON-MANESAR

Licence valid to 1 Nov 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 21 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

250 OF 2007

DTCP’s page showed no land schedule for licence 250 OF 2007 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate, residential flat
₹7,700 per sq ft

Sector 109, collector rates effective 1 Apr 2026, Gurugram tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Layout Plan, Site Plan7 Feb 2020Approved Site Plan16 Dec 2019

Layout plan

1 file
Latest Layout Plan16 Dec 2019

Building plans

2 files
Building Plan Approval Letter (BR-III)7 Feb 2020Approved Building Plans, Full Set16 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (26 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/982 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Almond Infrabuild

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.