Chintels Serenity-Tower No 3, 4, 5, EWS Block, Community Building with Convenient Shopping

by Chintels India · Sector 109, Gurugram

Not on our price list yet

Possession 31 Dec 2018 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 109, Gurugram0.8 km from Dwarka Expressway, in a straight linePrices and what changed
Registered
28 Aug 2017
Registered by
CHINTELS INDIA PVT. LTD.the company that filed it, for Chintels India
Timeline
  1. 26 Jul 2013Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 28 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Dec 2018Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside13,152 m² in all, by use
  • Parks and playgrounds7,000 m² · 53%
  • Roads1,742 m² · 13%
  • Parking1,500 m² · 11%
  • Apartment buildings1,032 m² · 8%
  • Green belts634 m² · 5%
  • Club house480 m² · 4%
  • Other uses378 m² · 3%
  • Pavements361 m² · 3%
  • Electricity sub-station25 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV system LG make
  • KitchenModular kitchen
  • Lifts2NOS per tower
  • WardrobesPRE-laminated MDF with lamination and PU paint finish
  • FloorsLiving dining lobby engineering marble bedrooms wooden flooring toilets
  • WallsPlaster and painted
  • BathroomsKohler
  • WindowsAluminum and glass WORK

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 109, GurugramSector 109, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.8 km
  • Delhi–Gurugram–SNB RRTS5.3 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Chintels Serenity-Tower No 3, 4, 5, EWS Block, Community Building with Convenient Shopping registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 125 OF 2017, registered on 28 Aug 2017. Ended 31 Dec 2018. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Chintels Serenity-Tower No 3, 4, 5, EWS Block, Community Building with Convenient Shopping?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2018. Its registration runs to 31 Dec 2018; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Chintels Serenity-Tower No 3, 4, 5, EWS Block, Community Building with Convenient Shopping?From the records · Map pin and road lines, read 6 Sep 2026

Chintels Serenity-Tower No 3, 4, 5, EWS Block, Community Building with Convenient Shopping is in Sector 109, Gurugram; the site address declared to HARERA is Sector 109, Gurugram. In a straight line it is about 0.8 km from Dwarka Expressway, 5.3 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Chintels Serenity-Tower No 3, 4, 5, EWS Block, Community Building with Convenient Shopping?From the records · HARERA, read 4 Nov 2026

Chintels Serenity-Tower No 3, 4, 5, EWS Block, Community Building with Convenient Shopping is a Chintels India project, registered by its company CHINTELS INDIA PVT. LTD..

The source ↗Chintels India's projects and court record

The records

What the registers hold for Chintels Serenity-Tower No 3, 4, 5, EWS Block, Community Building with Convenient Shopping: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 125 OF 2017: Registration expired. Ended 31 Dec 2018.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 50 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 16 May 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 26 Jul 2013, building plans 26 Jul 2013.Declared to HARERA, read 29 Oct 2026
The court record of Chintels India’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2018. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 50 OF 2012 lapsed

    Named in this project’s application. Valid to 16 May 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 30 HARERA files, with the dates we read them
Registration no.
125 OF 2017
Registration date
28 Aug 2017
Registration valid till
31 Dec 2018
Declared possession
31 Dec 2018

Declared by the promoter to HARERA

Land area
13152 (Sqr/mtrs)
FAR
the application prints 174.45, which is not a ratio
licence
licence no. 50 of 2012 and 250 of 2007
Estimated project cost
₹155.41 crore
Cost of land
₹8.38 crore
Layout plan, declared approved (field 5a)
26 Jul 2013
Building plans, declared approved
26 Jul 2013
Completion declared for
31 Dec 2018
Declared inventory · 4 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT · 120 units · 14,566 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER -3 · 40 units · 144.17 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER -4 · 40 units · 114.81 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER -5 · 40 units · 105.17 sq m carpet
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. OCCUPATION CERTIFICATE — declared: already been obtained (12 Feb 2019)
On file with HARERA · 30 files

On file with HARERA (30)

Plans

Site plan

2 files
Site Plan5 Feb 2020Approved Site Plan8 Jan 2020

Layout plan

2 files
Phasing Plan5 Feb 2020Latest Layout Plan8 Jan 2020

Zoning plan

1 file
Zoning Plan5 Feb 2020

Demarcation plan

1 file
Demarcation Plan5 Feb 2020

Building plans

3 files
Building Plan5 Feb 2020Building Plan Approval5 Feb 2020Approved Building Plans, Full Set8 Jan 2020

Services

Service plans

3 files
Services Plan Estimate5 Feb 2020Services Plan5 Feb 2020Service Plans on the Layout8 Jan 2020

Approvals and clearances

Occupation certificate (OC)

3 files
OC uploaded for Tower-3, Tower-4, Tower-5, EWS, Community building, shop in community builing, convenient shopping, Bridge8 Aug 2023OC uploaded8 Aug 2023OC uploaded4 Aug 2023

DTCP licence

3 files
LC 45 Feb 2020LOI5 Feb 2020Licence Copy with Land Schedule8 Jan 2020

Environment clearance

1 file
Environment Clearance5 Feb 2020

Fire safety

1 file
Fire Scheme5 Feb 2020

Other NOCs and clearances

2 files
AAI Clearance5 Feb 2020Forest NOC5 Feb 2020

Land records

Land records

2 files
Lic Along with Land Schedule5 Feb 2020Revenue Record Entry of Licence and Collaboration8 Jan 2020

Money

Accounts and finance

3 files
Non-Default Certificate from a CA5 Feb 2020Cash Flow Statement8 Jan 2020CA Certificate on the Application’s Figures8 Jan 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit8 Jan 2020

Company papers

1 file
Board Resolution5 Feb 2020

Other filings

Other filings

1 file
Status of Construction5 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

50 OF 2012 · Chintels India · GURGAON-MANESAR

Licence valid to 16 May 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

250 OF 2007 · Chintels India · GURGAON-MANESAR

Licence valid to 1 Nov 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 8 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

50 OF 2012: 15 parcels, 8.2937 acres in all, in Babupur (hadbast 60), tehsil Gurgaon.

The licence register prints the same licensed area, 8.29 acres.

  • 2//2111 marla
  • 3//248 kanal 4 marla
  • 3//253 kanal 18 marla
  • 11//148 kanal
Show the other 11 parcels
  • 11//17/21 kanal 4 marla
  • 11//4/16 kanal 18 marla
  • 11//4/21 kanal 2 marla
  • 11//5/16 kanal 18 marla
  • 11//5/21 kanal 2 marla
  • 11//6/16 kanal 16 marla
  • 11//78 kanal
  • 11//8/12 kanal 16 marla
  • 12//1/16 kanal 14 marla
  • 12//1/21 kanal 2 marla
  • 12//10/13 kanal 2 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

250 OF 2007

DTCP’s page showed no land schedule for licence 250 OF 2007 when Bhumiq read it on 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Babupur (hadbast 60), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 2//21.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,700 per sq ft

Sector 109, collector rates effective 1 Apr 2026, Gurugram tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan5 Feb 2020Approved Site Plan8 Jan 2020

Layout plan

2 files
Phasing Plan5 Feb 2020Latest Layout Plan8 Jan 2020

Building plans

3 files
Building Plan5 Feb 2020Building Plan Approval5 Feb 2020Approved Building Plans, Full Set8 Jan 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (30 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1070 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Chintels India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.