Skip to content
Under construction

BPTP Gaia Residences (at Amstoria)

by BPTP · Sector 102, Gurugram

₹20,000 a sq ftof carpet area

Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 31 Dec 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 102, Gurugram0.7 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
about 1,070 sq ft
In m²about 99.4 m², the average flat, as declared
Asking rate
₹20,000 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
BPTP LIMITEDthe company that filed it, for BPTP
Timeline
  1. 23 May 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Jul 2032Registration valid toHARERA, read 4 Nov 2026
  3. 31 Dec 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1.684 acres in all, by use
  • Apartment buildings0.909 acres · 54%
  • Other usesas the form names them: Construction0.373 acres · 22%
  • Parking0.167 acres · 10%
  • Roads0.129 acres · 8%
  • Parks and playgrounds0.106 acres · 6%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV / VRF with high units in living/dining, kitchen, bedrooms daikin/bluestar/toshiba/hitachi/LG/samsung/voltas/panasonic or equivalent make
  • KitchenGreenply/SOHA/spacewood/greenlam/archidply/merino/century/kitply/kutty/ancho/EURO or equivalent make
  • LiftsOTIS/mitsubishi/KONE/thyssenkrupp or equivalent
  • FloorsLaminated woodden/tile/marble, pergo/lotus kaleen/action/ nitco/H&R johnson/kajaria/RAK or equivalent
  • WallsTile,nitco/somany/orientbell/nitco/H&R johnson/kajaria/RAK/ or equivalent acrylic emulsion/OBD/ asian/berger/ nerolac or equivalent
  • BathroomsJaquar/parryware/hindware/or equivalant
  • WindowsGlazed windows with UPVC/ALMS frames,aluplast/decunik/encraft/asahi/sheda/LG/schuco/ALUK/alumil/reynaers/mahavir/hindalco/jindal/bhoruka/ equivalent
  • Main doorFlush door, greenply/sobha/spacewood/greenlam/archidply/merino/century/kitply/kutty/EURO/acnarendra/akhuumber/haryana plywood/pradeep timber/edifice/shreejiwood/parasnath/deshbandhu or equivalent make

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 102, GurugramSector 102, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS5.8 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 21 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 6
  • Registered, no OC or CC yet: 10
  • Other register states: 5

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is BPTP Gaia Residences (at Amstoria) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/963/695/2025/66. Valid to 31 Jul 2032.

The source ↗
What is the possession timeline for BPTP Gaia Residences (at Amstoria)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2032. Its registration runs to 31 Jul 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around BPTP Gaia Residences (at Amstoria)?From the records · Map pin and road lines, read 6 Sep 2026

BPTP Gaia Residences (at Amstoria) is in Sector 102, Gurugram; the site address declared to HARERA is Sector 102 Gurugram. In a straight line it is about 0.7 km from Dwarka Expressway, 5.8 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What does a home in BPTP Gaia Residences (at Amstoria) cost, and how does that compare nearby?From the records · Bhumiq team price list, 16 Sep 2026

The Bhumiq team's price list has ₹20,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for BPTP Gaia Residences (at Amstoria): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/963/695/2025/66: Registered. Valid to 31 Jul 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 123 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 21 Aug 2019.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 23 May 2025.Declared to HARERA, read 29 Oct 2026
The court record of BPTP’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 123 OF 2014 lapsed

    Named in this project’s application. Valid to 21 Aug 2019; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 64 HARERA files, with the dates we read them
Registration no.
GGM/963/695/2025/66
Registration valid till
31 Jul 2032
Declared possession
31 Dec 2032
Asking price (indicative)
₹20,000 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
1.6838 (Acre) (6,814.1 sq m)
FAR
4.4 proposed of 5.15 permissible
licence
License no 123 of 2014
Estimated project cost
₹965.19 crore
Cost of land
₹2.86 crore
Building plans, declared approved
23 May 2025
Construction to start
1 Oct 2025
Completion declared for
31 Dec 2032
Declared inventory · 3 types

Declared inventory

  • Apartment/Shops/Other Buildings · 177 units · 17,795.88 sq m carpet · 1 tower · total for 177 flats, about 100.5 m² each
  • Apartment/Shops/Other Buildings · 177 units · 17,169 sq m carpet · 1 tower · total for 177 flats, about 97 m² each
  • Apartment/Shops/Other Buildings · 177 units · 17,798.82 sq m carpet · 1 tower · total for 177 flats, about 100.6 m² each
Statutory approvals, as declared · 14

Statutory approvals, as declared

  • I. LICENSE NO 123 OF 2014 — declared: already been obtained (22 Aug 2015)
  • II. TOD LICENSE — declared: already been obtained (18 Nov 2024)
  • III. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (16 Feb 2024)
  • IV. FOREST NOC — declared: already been obtained (27 Nov 2024)
  • V. WATER ASSURANCE — declared: already been obtained (27 Nov 2024)
  • VI. SEWERAGE ASSURANCE — declared: already been obtained (26 Nov 2024)
  • VII. STORM WATER ASSURANCE — declared: already been obtained (26 Nov 2024)
  • VIII. NOC FOR CONSTRUCTION WATER — declared: already been obtained (3 Dec 2024)
  • IX. BUILDING PLAN APPROVAL — declared: already been obtained (23 May 2025)
  • X. ROAD ASSURANCE — declared: already been obtained (7 Nov 2024)
  • XI. ELECTRICAL LOAD ASSURANCE — declared: already been obtained (21 Nov 2024)
  • XII. ZONING PLAN APPROVAL — declared: already been obtained (18 Nov 2024)
  • XIII. SITE PLAN APPROVAL — declared: already been obtained (23 May 2025)
  • XIV. BUILDING PLAN APPROVAL — declared: already been obtained (23 May 2025)
On file with HARERA · 64 files

On file with HARERA (64)

Plans

Site plan

3 files
Site Plan27 Jun 2025Site Plan St-0227 Jun 2025Approved Site Plan27 Jun 2025

Layout plan

2 files
Approved Phasing Plan for GH Colony 12.05ACS in Sec-102 Ggm Letter27 Jun 2025Latest Layout Plan27 Jun 2025

Zoning plan

1 file
Demarcation Cum Zoning Plan27 Jun 2025

Building plans

8 files
Section 03 Tower 6,7&8 Sc-0327 Jun 2025Elevation 02 &03; E-0227 Jun 2025Terrace,mummty & Roof Plan T6-0727 Jun 2025

Floor plans

9 files
Basement Area Bs-0227 Jun 2025Carpet Area T6-0827 Jun 2025Ground Floor Plan Tower 6,7,8 T6-01A27 Jun 2025

Services

Sewerage and drainage

2 files
Storm Water Assurance - 12.05 Acres27 Jun 2025Sewer Assurance - 12.05 Acres27 Jun 2025

Water supply

2 files
Nocuse of Treated Water27 Jun 2025Water Supply Assurance27 Jun 2025

Electricity

2 files
Powerline Shifting27 Jun 2025DHBVN Assurance27 Jun 2025

Roads

1 file
Road Access27 Jun 2025

Service plans

2 files
Service Floor Plan T6-0327 Jun 2025Service Estimates Applied27 Jun 2025

Approvals and clearances

DTCP licence

6 files
Entry of License27 Jun 2025TOD Approval27 Jun 2025DTCP Order of License27 Jun 2025

Environment clearance

2 files
EC Recomended27 Jun 2025Environment Clearance Applied27 Jun 2025

Fire safety

1 file
Fire Scheme Applied27 Jun 2025

Other NOCs and clearances

4 files
Airport Height Permission27 Jun 2025NCZ27 Jun 2025Forest NOC 12.70 Acres Sector 102 Ggm27 Jun 2025Mining27 Jun 2025

Land records

Land records

4 files
Entry of License and Mutation Jamabandi27 Jun 2025Aksh Shizra27 Jun 2025Collaboration27 Jun 2025NEC27 Jun 2025

Sales papers

Allotment and sale agreements

2 files
Agreement to Sale27 Jun 2025Allotment Letter27 Jun 2025

Money

Accounts and finance

5 files
CA Certificate Financial and Inventory27 Jun 2025CA Certificate Cost Incurred27 Jun 2025CA Certificate No Default27 Jun 2025

The promoter’s papers

Declarations and affidavits

6 files
Bank Undertaking27 Jun 2025Affidavit 42LD27 Jun 2025The Promoter’s Declaration on Affidavit27 Jun 2025

Other filings

Other filings

2 files
New BR27 Jun 2025Shooping Community Building Nursery School27 Jun 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

123 OF 2014 · Countrywide Promoters Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 21 Aug 2019

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 26 May 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

123 OF 2014: 19 parcels, 12.05 acres in all, in Kherki mazar dhankot (hadbast 52), tehsil Kadipur.

The licence register prints the same licensed area, 12.05 acres.

  • 66//18 kanal
  • 66//10/13 kanal 16 marla
  • 66//11/22 kanal
  • 66//128 kanal
Show the other 15 parcels
  • 66//138 kanal
  • 66//14/110 marla
  • 66//16/21 kanal 2 marla
  • 66//17/1/24 kanal 1 marla
  • 66//17/23 kanal 8 marla
  • 66//188 kanal
  • 66//2/15 kanal 13 marla
  • 66//38 kanal
  • 66//4/13 kanal 11 marla
  • 66//5/27 kanal 16 marla
  • 66//88 kanal
  • 66//98 kanal
  • 67//5/24 kanal
  • 63//17/12 kanal 3 marla
  • 63//24/22 kanal 8 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Kherki mazar dhankot (hadbast 52), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 66//1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,000 per sq ft

Sector 102, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan27 Jun 2025Site Plan St-0227 Jun 2025Approved Site Plan27 Jun 2025

Layout plan

2 files
Approved Phasing Plan for GH Colony 12.05ACS in Sec-102 Ggm Letter27 Jun 2025Latest Layout Plan27 Jun 2025

Building plans

8 files
Section 03 Tower 6,7&8 Sc-0327 Jun 2025Elevation 02 &03; E-0227 Jun 2025Terrace,mummty & Roof Plan T6-0727 Jun 2025Elevation 01 Ev-0127 Jun 2025Section 1 Sc-0127 Jun 2025Section 02 Tower 6,7&8 Sc-0227 Jun 2025

Floor plans

9 files
Basement Area Bs-0227 Jun 2025Carpet Area T6-0827 Jun 2025Ground Floor Plan Tower 6,7,8 T6-01A27 Jun 2025Basement Area Bs-0127 Jun 2025Refugee Floor T6-0627 Jun 2025Basement Area Bs-0327 Jun 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (64 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3491 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on BPTP

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

₹20,000/sq ftBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.