CENTRAL 84

by DLF Home Developers · Sector 84, Gurugram

Not on our price list yet

Possession 30 Jun 2030 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 84, Gurugram1.1 km from Dwarka Expressway, in a straight line
Registered by
DLF HOME DEVELOPERS LIMITEDthe company that filed it, for DLF Home Developers
Timeline
  1. 15 Jan 2025Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Jun 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside26,481 m² in all, by use
  • Roads9,618 m² · 36%
  • Plots for sale9,263 m² · 35%
  • Parking3,590 m² · 14%
  • Parks and playgrounds2,923 m² · 11%
  • Other usesas the form names them: Toilet, Rain, Ug, Meter, Misc490 m² · 2%
  • Electricity sub-station350 m² · 1%
  • Sewage and waste treatment247 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 84, GurugramSector 84, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.1 km
  • Delhi–Gurugram–SNB RRTS2.3 km
  • Sohna Elevated Corridor (NH-248A)7.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 7
  • Registered, no OC or CC yet: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is CENTRAL 84 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/969/701/2025/72. Valid to 30 Jun 2030.

The source ↗
What is the possession timeline for CENTRAL 84?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2030. Its registration runs to 30 Jun 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around CENTRAL 84?From the records · Map pin and road lines, read 6 Sep 2026

CENTRAL 84 is in Sector 84, Gurugram; the site address declared to HARERA is Sector 84, Gurugram, Haryana 122004. In a straight line it is about 1.1 km from Dwarka Expressway, 2.3 km from Delhi–Gurugram–SNB RRTS and 7.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building CENTRAL 84?From the records · HARERA, read 4 Nov 2026

CENTRAL 84 is a DLF Home Developers project, registered by its company DLF HOME DEVELOPERS LIMITED.

The source ↗DLF Home Developers's projects and court record

The records

What the registers hold for CENTRAL 84: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/969/701/2025/72: Registered. Valid to 30 Jun 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 8 OF 2025 is on the DTCP register, valid to 13 Jan 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 15 Jan 2025.Declared to HARERA, read 29 Oct 2026
The court record of DLF Home Developers’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 48 HARERA files, with the dates we read them
Registration no.
GGM/969/701/2025/72
Registration valid till
30 Jun 2030
Declared possession
30 Jun 2030

Declared by the promoter to HARERA

Land area
6.5438 (Acre) (26,481.82 sq m)
FAR
1.5 proposed of 1.5 permissible
licence
08 of 2025 dated 14.01.2025
Estimated project cost
₹155.26 crore
Cost of land
₹36.36 crore
Layout plan, declared approved (field 5a)
15 Jan 2025
Construction to start
1 Jul 2025
Completion declared for
30 Jun 2030
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. SERVICE PLAN ESTIMATE — declared: already been obtained (25 Apr 2025)
  • II. LAYOUT PLAN DWG NO. DTCP -10779 — declared: already been obtained (15 Jan 2025)
  • III. LICENSE NO. 8 OF 2025 — declared: already been obtained (14 Jan 2025)
  • IV. LAYOUT PLAN — declared: already been obtained (15 Jan 2025)
  • V. ARCHITECTURAL CONTROL SHEET — declared: already been obtained (16 Apr 2025)
  • VI. SERVICE PLAN AND ESTIMATES — declared: already been obtained (25 Apr 2025)
On file with HARERA · 48 files

On file with HARERA (48)

Plans

Site plan

1 file
Approved Site Plan19 Apr 2025

Layout plan

1 file
Latest Layout Plan17 Apr 2025

Services

Sewerage and drainage

2 files
Assurance of Sewerage Connection (Central 84)28 Jul 2025Assurance for Storm Water Sec 8428 Jul 2025

Water supply

1 file
Fresh Water Assurance Approval - SCO 8428 Jul 2025

Electricity

1 file
Electrif Plan Central 8428 Jul 2025

Service plans

2 files
SPE COMM(84) 654375 Acres Estimate28 Jul 2025SPE Comm (84) 654375 Acres Dwgs28 Jul 2025

Approvals and clearances

DTCP licence

3 files
LC IV Bilateral Agreement28 Jul 2025LOI Comm-28 Jul 2025Licence Copy with Land Schedule17 Apr 2025

Other NOCs and clearances

3 files
Tree Felling NOC28 Jul 2025Forest NOC 6 54 Sec 8428 Jul 2025Aravali NOC28 Jul 2025

Land records

Land records

5 files
Title Search Report (Sihi - 6-54 Acs)28 Jul 2025Central 84 Mutations28 Jul 2025Non Encumbrance Certificate (Sihi - 654 Acs)28 Jul 2025

Sales papers

Allotment and sale agreements

1 file
Allotment Letter Signed28 Jul 2025

Money

Accounts and finance

4 files
Non-Default Certificate from a CA29 Jul 2025Project Cost Incurred Central 84 14-05-202528 Jul 2025Project Cost Estimated Central 8428 Jul 2025Net Worth Certificate28 Jul 2025

Timeline and progress

Construction schedule

1 file
PERT Chart Signed28 Jul 2025

The promoter’s papers

Declarations and affidavits

3 files
Undertaking for Forest Land Diversion28 Jul 2025Central 84 Bank Undertaking28 Jul 2025The Promoter’s Declaration on Affidavit17 Apr 2025

Other filings

Other filings

20 files
Badar28 Jul 2025Acs Copy-Part-828 Jul 2025Acs Copy-Part-728 Jul 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

8 OF 2025 · DLF Home Developers Ltd. · GURGAON-MANESAR

Licence valid to 13 Jan 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

8 OF 2025 · DLF Home Developers Ltd. · GURGAON-MANESAR

Licence valid to 13 Jan 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 21 Apr 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

8 OF 2025: 15 parcels, 6.5438 acres in all, in Sihi (hadbast 108), tehsil Manesar.

The licence register prints the same licensed area, 6.5438 acres.

  • 23//20/2/21 kanal 3 marla
  • 24//12/1/33 kanal 3 marla
  • 24//12/2/1/112 marla
  • 24//12/2/1/28 marla
Show the other 11 parcels
  • 24//12/2/21 kanal
  • 24//138 kanal
  • 24//148 kanal
  • 24//15/1/14 kanal 18 marla
  • 24//178 kanal
  • 24//18/17 kanal 19 marla
  • 24//19/1/1/114 marla
  • 24//19/1/2/1/14 marla
  • 24//19/1/2/2/15 marla
  • 24//19/2/1/14 marla
  • rectangle 24, kila 16/2 min7 kanal 17 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

8 OF 2025: 15 parcels, 6.5438 acres in all, in Sihi (hadbast 108), tehsil Manesar.

The licence register prints the same licensed area, 6.5438 acres.

  • 23//20/2/21 kanal 3 marla
  • 24//12/1/33 kanal 3 marla
  • 24//12/2/1/112 marla
  • 24//12/2/1/28 marla
Show the other 11 parcels
  • 24//12/2/21 kanal
  • 24//138 kanal
  • 24//148 kanal
  • 24//15/1/14 kanal 18 marla
  • 24//178 kanal
  • 24//18/17 kanal 19 marla
  • 24//19/1/1/114 marla
  • 24//19/1/2/1/14 marla
  • 24//19/1/2/2/15 marla
  • 24//19/2/1/14 marla
  • rectangle 24, kila 16/2 min7 kanal 17 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sihi (hadbast 108), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 23//20/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan19 Apr 2025

Layout plan

1 file
Latest Layout Plan17 Apr 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (48 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3441 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on DLF Home Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.