Skip to content

SAPPHIRE 84

by Ameya Commercial Projects · Sector 84, Gurugram

Not on our price list yet

Possession 30 Nov 2028 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 84, Gurugram1.1 km from Dwarka Expressway, in a straight line
Carpet area
about 2,854 sq ft
In m²about 265.2 m², the average flat, as declared
Registered by
AMEYA COMMERCIAL PROJECTS PVT. LTD.the company that filed it, for Ameya Commercial Projects
Timeline
  1. 28 Mar 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Nov 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.55 acres in all, by use
  • Plots for sale1.414 acres · 55%
  • Apartment buildings0.936 acres · 37%
  • Other usesas the form names them: Water supply, Storm water drainage, Sewage, Street light0.2 acres · 8%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioning1 to 1.5 TON voltas or equivalent
  • KitchenTiles
  • Kitchen appliancesV
  • LiftsJohnson control or equivalent
  • FloorsImported marble / vetrified tile
  • WallsPlastic emulsion
  • BathroomsSteel
  • WindowsPaint

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 84, GurugramSector 84, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.1 km
  • Delhi–Gurugram–SNB RRTS2.3 km
  • Sohna Elevated Corridor (NH-248A)7.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SAPPHIRE 84 registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/830/562/2024/57. Valid to 30 Nov 2028.

The source ↗
What is the possession timeline for SAPPHIRE 84?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Nov 2028. Its registration runs to 30 Nov 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SAPPHIRE 84?From the records · Map pin and road lines, read 6 Sep 2026

SAPPHIRE 84 is in Sector 84, Gurugram; the site address declared to HARERA is Sector - 84, Rev Estate Of Of Village Hayatpur, Gurugram, Haryana. In a straight line it is about 1.1 km from Dwarka Expressway, 2.3 km from Delhi–Gurugram–SNB RRTS and 7.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SAPPHIRE 84?From the records · HARERA, read 3 Nov 2026

SAPPHIRE 84 is a Ameya Commercial Projects project, registered by its company AMEYA COMMERCIAL PROJECTS PVT. LTD..

The source ↗Ameya Commercial Projects's projects and court record

The records

What the registers hold for SAPPHIRE 84: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/830/562/2024/57: Registered. Valid to 30 Nov 2028.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 44 OF 2019 is on the DTCP register: Licence lapsed; the register prints its validity to 4 Mar 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 28 Mar 2024, building plans 28 Mar 2024.Declared to HARERA, read 29 Oct 2026
The court record of Ameya Commercial Projects’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 44 OF 2019 lapsed

    Named in this project’s application. Valid to 4 Mar 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 37 HARERA files, with the dates we read them
Registration no.
GGM/830/562/2024/57
Registration valid till
30 Nov 2028
Declared possession
30 Nov 2028

Declared by the promoter to HARERA

Land area
2.55 (Acre) (10,319.48 sq m)
FAR
1.83 proposed of 1.84 permissible
licence
Licence No 44 of 2019 granted by Department of Town and Country Planning
Estimated project cost
₹123.85 crore
Cost of land
₹0.15 crore
Layout plan, declared approved (field 5a)
28 Mar 2024
Building plans, declared approved
28 Mar 2024
Construction to start
1 Dec 2023
Completion declared for
30 Nov 2028
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 451 units · 1,19,583.58 sq m carpet · 2 towers · total for 451 flats, about 265.2 m² each
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (5 Mar 2019)
  • II. ZONING — declared: already been obtained (6 Mar 2019)
  • III. REVISED BUILDING PLANS — declared: already been obtained (28 Mar 2024)
  • IV. EC — declared: already been obtained (6 Sept 2019)
  • V. SERVICE PLAN ESTIMATES — declared: already been obtained (9 May 2024)
On file with HARERA · 37 files

On file with HARERA (37)

Plans

Site plan

1 file
Approved Site Plan13 Jun 2024

Layout plan

1 file
Latest Layout Plan13 Jun 2024

Zoning plan

1 file
Zoning Plan17 Oct 2023

Building plans

6 files
Elevation - Block B13 Jun 2024Elevation and Section - Block B13 Jun 2024Elevations - Block A13 Jun 2024

Floor plans

12 files
1st Basement - Block B13 Jun 20241st Basement Floor Plan - Block A13 Jun 20242nd Basement Floor Plan - Block A13 Jun 2024

Services

Sewerage and drainage

1 file
Drainage Layout Plan13 Jun 2024

Roads

1 file
Road Layout Plan13 Jun 2024

Service plans

2 files
Service Plan Estimate Approval13 Jun 2024SPE Booklet13 Jun 2024

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule13 Jun 2024

Environment clearance

1 file
EC13 Jun 2024

Fire safety

2 files
Firefighting & Water Supply Layout Plan13 Jun 2024Fire Scheme Approval13 Jun 2024

Land records

Land records

5 files
Collaboration Agreement13 Jun 2024Jamabandi13 Jun 2024Mutation13 Jun 2024

Sales papers

Allotment and sale agreements

1 file
Inventory Details13 Jun 2024

Money

Accounts and finance

1 file
Non-Default Certificate from a CA17 Oct 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit13 Jun 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

44 OF 2019 · Ameya Commercial Projects Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 4 Mar 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 25 Oct 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

44 OF 2019: 7 parcels, 2.55 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.

The licence register prints the same licensed area, 2.55 acres.

  • 72//3/2/21 kanal 1 marla
  • 72//4/2/13 kanal 1 marla
  • 72//4/2/23 kanal 11 marla
  • 72//7/1/23 kanal 1 marla
Show the other 3 parcels
  • 72//7/1/32 kanal
  • 67//24/21 kanal 5 marla
  • 67//25/26 kanal 9 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Hayatpur (hadbast 114), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 72//3/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan13 Jun 2024

Layout plan

1 file
Latest Layout Plan13 Jun 2024

Building plans

6 files
Elevation - Block B13 Jun 2024Elevation and Section - Block B13 Jun 2024Elevations - Block A13 Jun 2024Terrace Plan - Block B13 Jun 2024Terrace Plan and Section - Block A13 Jun 2024BR III13 Jun 2024

Floor plans

12 files
1st Basement - Block B13 Jun 20241st Basement Floor Plan - Block A13 Jun 20242nd Basement Floor Plan - Block A13 Jun 2024First Floor Plan - Block A13 Jun 2024First Floor Plan - Block B13 Jun 2024Fourth Floor Plan - Block A13 Jun 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (37 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2640 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ameya Commercial Projects

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.