Commercial Project

by Magic Eye Developers · Sector 106, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 106, Gurugram1.2 km from Dwarka Expressway, in a straight linePrices and what changed
Registered
18 Aug 2017
Registered by
MAGIC EYE DEVELOPERS PVT. LTD.the company that filed it, for Magic Eye Developers
Timeline
  1. 21 Dec 2016Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 18 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Dec 2024Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenVitrified tiles
  • Kitchen appliancesConstruction specification as mentioned above
  • WardrobesConstruction specification as mentioned above
  • FloorsVitrified tiles, cimarc tiles, stones, wooden flooring
  • WallsOBD
  • BathroomsCimarc fixures, CP fittings
  • WindowsSame above
  • Main doorSame as above

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 106, GurugramSector 106, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.2 km
  • Delhi–Gurugram–SNB RRTS5.9 km
  • Sohna Elevated Corridor (NH-248A)7.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 1
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Commercial Project registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 65 OF 2017, registered on 18 Aug 2017. The register’s record shows an end date of 31 Dec 2024. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around Commercial Project?From the records · Map pin and road lines, read 6 Sep 2026

Commercial Project is in Sector 106, Gurugram; the site address declared to HARERA is Sector-106. In a straight line it is about 1.2 km from Dwarka Expressway, 5.9 km from Delhi–Gurugram–SNB RRTS and 7.7 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Commercial Project?From the records · HARERA, read 4 Nov 2026

Commercial Project is a Magic Eye Developers project, registered by its company MAGIC EYE DEVELOPERS PVT. LTD..

The source ↗Magic Eye Developers's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Commercial Project: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 65 OF 2017: Registration lapsed. The register’s record shows an end date of 31 Dec 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 4 OF 2016 is on the DTCP register: Licence lapsed; the register prints its validity to 10 Apr 2021.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 21 Dec 2016, building plans 21 Dec 2016.Declared to HARERA, read 29 Oct 2026
The court record of Magic Eye Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 4 OF 2016 lapsed

    Named in this project’s application. Valid to 10 Apr 2021; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2024. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 27 HARERA files, with the dates we read them
Registration no.
65 OF 2017
Registration date
18 Aug 2017
Registration valid till
31 Dec 2024

Declared by the promoter to HARERA

Land area
3.5035 (Acre) (14,178.16 sq m)
FAR
the application prints 159, which is not a ratio
licence
4/2016 Dated 11.04.2016
Estimated project cost
₹165.65 crore
Cost of land
₹12.64 crore
Layout plan, declared approved (field 5a)
21 Dec 2016
Building plans, declared approved
21 Dec 2016
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. AA HEIGHT CLEARANCE — declared: already been obtained (21 Jan 2020)
  • II. ENVIRONMENT CLEARANCE — declared: already been obtained (21 Jun 2017)
  • III. FIRE SCHEME APPROVAL — declared: already been obtained (12 May 2017)
  • IV. BUILDING PLN APPROVAL — declared: already been obtained (21 Dec 2016)
On file with HARERA · 27 files

On file with HARERA (27)

Plans

Site plan

2 files
Site Plan & Area Calculation - Final13 Feb 2020Approved Site Plan16 Jan 2020

Layout plan

1 file
Latest Layout Plan16 Jan 2020

Zoning plan

2 files
Zoning Plan Phase 213 Feb 2020Zoning Plan16 Jan 2020

Demarcation plan

1 file
Demarcation Plan16 Jan 2020

Building plans

8 files
East & West Elevation13 Feb 2020North Elevation13 Feb 2020Building Plan Sanction BR-III13 Feb 2020

Floor plans

1 file
Mumty & Machine Room Floor Plan13 Feb 2020

Services

Service plans

1 file
Service Plans on the Layout16 Jan 2020

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule16 Jan 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration16 Jan 2020

Sales papers

Allotment and sale agreements

1 file
Inventory - Plaza at 106-II13 Feb 2020

Money

Accounts and finance

4 files
1. Copy of Demand Draft13 Feb 2020CA Certificate on the Application’s Figures16 Jan 2020Non-Default Certificate from a CA16 Jan 2020Cash Flow Statement16 Jan 2020

Timeline and progress

Construction schedule

1 file
PERT Chart13 Feb 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit16 Jan 2020

Other filings

Other filings

2 files
Aadhhar Ravee Ahuja13 Feb 2020Address of Promoter13 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

4 OF 2016 · Magic Eye Developers Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 10 Apr 2021

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

4 OF 2016: 17 parcels, 3.5035 acres in all, in Daultabad (hadbast 53), tehsil Kadipur.

The licence register prints the same licensed area, 3.5 acres.

  • 18//114 marla
  • 18//12/22 kanal
  • 18//13/13 kanal 2 marla
  • 18//13/28 marla 7 sarsai
Show the other 13 parcels
  • 18//14/18 marla 7 sarsai
  • 18//14/24 kanal
  • 18//15/1/18 marla
  • 18//15/1/218 marla
  • 18//15/1/31 kanal 1 marla
  • 18//201 kanal 6 marla
  • 18//6/1/311 marla
  • 18//6/214 marla
  • 18//7/14 kanal 14 marla
  • 18//7/2/110 marla
  • 18//7/2/24 marla
  • 18//8/15 kanal 11 marla
  • 18//8/22 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 19 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Daultabad (hadbast 53), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 18//11.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,52,000 per sq yd

Sector 106, collector rates effective 1 Apr 2026, Kadipur tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan & Area Calculation - Final13 Feb 2020Approved Site Plan16 Jan 2020

Layout plan

1 file
Latest Layout Plan16 Jan 2020

Building plans

8 files
East & West Elevation13 Feb 2020North Elevation13 Feb 2020Building Plan Sanction BR-III13 Feb 2020Building Sanction Letter13 Feb 2020Sanction Drawings13 Feb 2020Sections13 Feb 2020

Floor plans

1 file
Mumty & Machine Room Floor Plan13 Feb 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (27 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1199 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Magic Eye Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.