DEVASYA BHARAT
by Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd) · Sector 88A, Gurugram
Not on our price list yet
Possession 31 Dec 2033 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 88A, Gurugram0.7 km from Dwarka Expressway, in a straight line
- 12 Sep 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Sep 2033Registration valid toHARERA, read 4 Nov 2026
- 31 Dec 2033Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft302–367 sq ft11
- 1,000–1,500 sq ft1,414 sq ft4
- 1,500–2,000 sq ft1,518 sq ft158
- 2,000–2,500 sq ft2,020–2,098 sq ft81
- 3,000 sq ft and above4,044–4,086 sq ft14
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 5 rows of a single unit and 66 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings1.116 acres · 37%
- Pavements0.677 acres · 23%
- Parks and playgrounds0.602 acres · 20%
- Roads0.58 acres · 19%
- Other usesas the form names them: Security0.003 acres · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningSplit AC
- KitchenVitrified tiles, vitrified tiles 2' above kitchen counter, REST of walls in acrylic emulsion paint¸ acrylic emulsion paint¸ prefabricated modular door with frame or flush door with laminate / paint and hardwood frame, aluminium / UPVC glazing with performance glass
- Lifts4 flats per floor, 4 lifts per floor
- FloorsVitrified tile, laminate wooden flooring, anti skid vitrified tiles, ceramic tile
- WallsPremium acrylic emulsion/ distemper/ cladding
- BathroomsVitrified tile upto false ceiling, moisture resistant false ceiling with acrylic emulsion paint, sink & washbasin
- WindowsFull height windows- aluminium powder coated sections
- Main doorMAIN door to FLAT - hardwood frame with veneered flush door/ as per drawing
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20250.7 km
- Delhi–Gurugram–SNB RRTS4.5 km
- Sohna Elevated Corridor (NH-248A)7.9 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 2
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
COCOA COUNTY PHASE 02No photo on file yet | Ashiana Landcraft Realty | Same sector | — | — | 31 Dec 2032 |
No photo of the project on file yet | Gcc Infra | Same sector | — | — | 31 Mar 2025 |
INDIA RASHTRANo photo on file yet | Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd) | Same sector | — | — | 30 Nov 2026 |
| Signatureglobal (India) | Same sector | — | — | 28 Mar 2026 | |
No photo of the project on file yet | Nani Resorts and Floriculture | Same sector | — | — | 30 Dec 2028 |
COCOA COUNTY PHASE 04No photo on file yet | Ashiana Landcraft Realty | Same sector | — | — | 31 Dec 2032 |
No photo of the project on file yet | Gcc Infra | Same sector | — | — | 30 Dec 2025 |
| Emperium Infrastructure | Same sector | — | — | 31 Mar 2031 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is DEVASYA BHARAT registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/1017/749/2025/120. Valid to 30 Sep 2033.
The source ↗What is the possession timeline for DEVASYA BHARAT?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2033. Its registration runs to 30 Sep 2033; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around DEVASYA BHARAT?From the records · Map pin and road lines, read 6 Sep 2026
DEVASYA BHARAT is in Sector 88A, Gurugram; the site address declared to HARERA is Sector 88a, Gurugram. In a straight line it is about 0.7 km from Dwarka Expressway, 4.5 km from Delhi–Gurugram–SNB RRTS and 7.9 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building DEVASYA BHARAT?From the records · HARERA, read 4 Nov 2026
DEVASYA BHARAT is a Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd) project.
The source ↗Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd)'s projects and court recordThe records
What the registers hold for DEVASYA BHARAT: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/1017/749/2025/120: Registered. Valid to 30 Sep 2033.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 141 OF 2024 is on the DTCP register, valid to 10 Nov 2029.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: building plans 12 Sep 2025.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 65 HARERA files, with the dates we read them
- Registration no.
- GGM/1017/749/2025/120
- Registration valid till
- 30 Sept 2033
- Declared possession
- 31 Dec 2033
Declared by the promoter to HARERA
- Land area
- 2.977 (Acre) (12,047.49 sq m)
- FAR
- 3.61 proposed of 3.62 permissible
- licence
- 141 of 2024 DATED 11.11.2024
- Estimated project cost
- ₹1226.73 crore
- Cost of land
- ₹312.81 crore
- Building plans, declared approved
- 12 Sept 2025
- Construction to start
- 1 Dec 2025
- Completion declared for
- 31 Dec 2033
Declared inventory · 20 types
Declared inventory — 20 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 4 units · 131.4 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 158 units · 141.05 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 1 unit · 177.34 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 14 units · 187.66 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 13 units · 189.56 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 54 units · 194.88 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 7 units · 375.7 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 7 units · 379.62 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 14
Statutory approvals, as declared
- I. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (30 Jun 2025)
- II. WATER SUPPLY — declared: already been obtained (28 Nov 2024)
- III. SEWAGE DISPOSAL — declared: already been obtained (26 Nov 2024)
- IV. STORM WATER DRAINAGE — declared: already been obtained (26 Nov 2024)
- V. ELECTRICAL LOAD — declared: already been obtained (28 Nov 2024)
- VI. ENVIRONMENT CLEARANCE — declared: already been obtained (20 Feb 2025)
- VII. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (21 Oct 2024)
- VIII. FOREST NOC — declared: already been obtained (9 Oct 2024)
- IX. LOI — declared: already been obtained (5 Aug 2024)
- X. BR-III — declared: already been obtained (12 Sept 2025)
- XI. LICENSE — declared: already been obtained (11 Nov 2024)
- XII. FIRE SCHEME APPROVAL — declared: already been obtained (16 Oct 2025)
- XIII. LETTER OF PHASING PLAN — declared: already been obtained (13 Jan 2025)
- XIV. SERVICE PLAN AND ESTIMATES — declared: applied for but yet to receive (19 Sept 2025)
On file with HARERA · 65 files
On file with HARERA (65)
Plans
Site plan
8 filesLayout plan
3 filesZoning plan
1 fileDemarcation plan
1 fileBuilding plans
6 filesFloor plans
11 filesServices
Sewerage and drainage
2 filesWater supply
1 fileElectricity
1 fileLandscape and green areas
1 fileService plans
4 filesApprovals and clearances
Completion certificate (CC)
1 fileDTCP licence
3 filesEnvironment clearance
1 fileFire safety
1 fileOther NOCs and clearances
3 filesLand records
Land records
6 filesMoney
Accounts and finance
5 filesThe promoter’s papers
Declarations and affidavits
4 filesOther filings
Other filings
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
141 OF 2024 · Devasya Developers Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 10 Nov 2029
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Oct 2025 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
141 OF 2024
DTCP’s page showed no land schedule for licence 141 OF 2024 when Bhumiq read it on 18 Oct 2026. verify at source
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
8 filesLayout plan
3 filesBuilding plans
6 filesFloor plans
11 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (65 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3684 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd)
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

