EMPERIUM TITAN
by Emperium Infrastructure · Sector 88A, Gurugram
Not on our price list yet
Possession 31 Mar 2031 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 88A, Gurugram0.7 km from Dwarka Expressway, in a straight line
- Registered by
- EMPERIUM INFRASTRUCTURE PRIVATE LIMITEDthe company that filed it, for Emperium Infrastructure
- 4 Sep 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Mar 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft916 sq ft2
- 1,000–1,500 sq ft1,077–1,078 sq ft72
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 18 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads1,403 m² · 34%
- Apartment buildings1,032 m² · 25%
- Parks and playgrounds868 m² · 21%
- Other uses497 m² · 12%
- Pavements165 m² · 4%
- Green belts114 m² · 3%
- Electricity sub-station59 m² · 1%
- Parking31 m² · under 1%
- Club house4 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningSplit a/C ( daikin 5-STAR rating or equivalent make)
- KitchenVitrifiED tiles
- Kitchen appliancesModular kitchen with chimney
- Lifts(total 4 NOS) 2 pessenger / service lifts in each tower 10 -15 passenger (make johnson,KONE, thyssen or equvivalent )
- WardrobesYes
- FloorsVitrified titles / laminated wooden flooring / anti skid vitrified tiles
- WallsCombination of texture PAIN / cement / PAIN / external emulsion plain
- BathroomsJaquar, CERA or equivalent make
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20250.7 km
- Delhi–Gurugram–SNB RRTS4.5 km
- Sohna Elevated Corridor (NH-248A)7.9 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 2
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
COCOA COUNTY PHASE 02No photo on file yet | Ashiana Landcraft Realty | Same sector | — | — | 31 Dec 2032 |
No photo of the project on file yet | Gcc Infra | Same sector | — | — | 31 Mar 2025 |
INDIA RASHTRANo photo on file yet | Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd) | Same sector | — | — | 30 Nov 2026 |
| Signatureglobal (India) | Same sector | — | — | 28 Mar 2026 | |
No photo of the project on file yet | Nani Resorts and Floriculture | Same sector | — | — | 30 Dec 2028 |
COCOA COUNTY PHASE 04No photo on file yet | Ashiana Landcraft Realty | Same sector | — | — | 31 Dec 2032 |
DEVASYA BHARATNo photo on file yet | Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd) | Same sector | — | — | 31 Dec 2033 |
No photo of the project on file yet | Gcc Infra | Same sector | — | — | 30 Dec 2025 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is EMPERIUM TITAN registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/1053/785/2026/25. Valid to 31 Mar 2031.
The source ↗What is the possession timeline for EMPERIUM TITAN?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Mar 2031. Its registration runs to 31 Mar 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around EMPERIUM TITAN?From the records · Map pin and road lines, read 6 Sep 2026
EMPERIUM TITAN is in Sector 88A, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Harsaru, Sector 88a, Gurugram Manesar Complex. In a straight line it is about 0.7 km from Dwarka Expressway, 4.5 km from Delhi–Gurugram–SNB RRTS and 7.9 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building EMPERIUM TITAN?From the records · HARERA, read 4 Nov 2026
EMPERIUM TITAN is a Emperium Infrastructure project, registered by its company EMPERIUM INFRASTRUCTURE PRIVATE LIMITED.
The source ↗Emperium Infrastructure's projects and court recordThe records
What the registers hold for EMPERIUM TITAN: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/1053/785/2026/25: Registered. Valid to 31 Mar 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 165 OF 2025 is on the DTCP register, valid to 3 Sep 2030.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: building plans 4 Sep 2025.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 86 HARERA files, with the dates we read them
- Registration no.
- GGM/1053/785/2026/25
- Registration valid till
- 31 Mar 2031
- Declared possession
- 31 Mar 2031
Declared by the promoter to HARERA
- Land area
- 1.03125 (Acre) (4,173.32 sq m)
- FAR
- 2.4 proposed of 2.4 permissible
- licence
- LC No. 165 of 2025
- Estimated project cost
- ₹99.36 crore
- Cost of land
- ₹21.41 crore
- Building plans, declared approved
- 4 Sept 2025
- Construction to start
- 1 May 2026
- Completion declared for
- 31 Mar 2031
Declared inventory · 11 types
Declared inventory — 11 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 18 units · 100.06 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 18 units · 100.06 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 18 units · 100.14 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 16 units · 100.14 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 2 units · 85.14 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 2 units · 100.06 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 1 unit · 5.27 sq m carpet · 2 towers · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 2 units · 14.55 sq m carpet · 2 towers · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 7
Statutory approvals, as declared
- I. BUILDING PLAN APPROVAL — declared: already been obtained (4 Feb 2026)
- II. AAI — declared: already been obtained (6 Feb 2026)
- III. LICENSE APPROVAL — declared: already been obtained (4 Sept 2025)
- IV. DEMARCATION CUM ZONING PLAN APPROVAL — declared: already been obtained (5 Sept 2025)
- V. FIRE SCHEME APPROVAL — declared: applied for but yet to receive (24 Feb 2026)
- VI. SPE (APPLIED AND PENDING IN HSVP) — declared: applied for but yet to receive (23 Feb 2026)
- VII. ELECTRIFICATION PLAN — declared: applied for but yet to receive (2 Feb 2026)
On file with HARERA · 86 files
On file with HARERA (86)
Plans
Site plan
2 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
8 filesFloor plans
5 filesServices
Sewerage and drainage
3 filesWater supply
1 fileElectricity
4 filesLandscape and green areas
1 fileService plans
2 filesApprovals and clearances
DTCP licence
3 filesFire safety
1 fileOther NOCs and clearances
9 filesLand records
Land records
10 filesSales papers
Allotment and sale agreements
2 filesMoney
Accounts and finance
10 filesThe promoter’s papers
Declarations and affidavits
8 filesCompany papers
2 filesOther filings
Other filings
12 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
165 OF 2025 · Emperium Infrastructure Private Limited · GURGAON-MANESAR
Licence valid to 3 Sept 2030
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 13 Feb 2026 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
165 OF 2025
DTCP’s page showed no land schedule for licence 165 OF 2025 when Bhumiq read it on 18 Oct 2026. verify at source
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
1 fileBuilding plans
8 filesFloor plans
5 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (86 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3966 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Emperium Infrastructure
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

