Skip to content

EMPERIUM TITAN

by Emperium Infrastructure · Sector 88A, Gurugram

Not on our price list yet

Possession 31 Mar 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 88A, Gurugram0.7 km from Dwarka Expressway, in a straight line
Carpet area
916–1,078 sq ft
In m²about 85–100 m², as declared
Registered by
EMPERIUM INFRASTRUCTURE PRIVATE LIMITEDthe company that filed it, for Emperium Infrastructure
Timeline
  1. 4 Sep 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Mar 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

74homes, 916 to 1,078 sq ft of carpet area
  • Under 1,000 sq ft916 sq ft2
  • 1,000–1,500 sq ft1,077–1,078 sq ft72

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 18 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4,173 m² in all, by use
  • Roads1,403 m² · 34%
  • Apartment buildings1,032 m² · 25%
  • Parks and playgrounds868 m² · 21%
  • Other uses497 m² · 12%
  • Pavements165 m² · 4%
  • Green belts114 m² · 3%
  • Electricity sub-station59 m² · 1%
  • Parking31 m² · under 1%
  • Club house4 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningSplit a/C ( daikin 5-STAR rating or equivalent make)
  • KitchenVitrifiED tiles
  • Kitchen appliancesModular kitchen with chimney
  • Lifts(total 4 NOS) 2 pessenger / service lifts in each tower 10 -15 passenger (make johnson,KONE, thyssen or equvivalent )
  • WardrobesYes
  • FloorsVitrified titles / laminated wooden flooring / anti skid vitrified tiles
  • WallsCombination of texture PAIN / cement / PAIN / external emulsion plain
  • BathroomsJaquar, CERA or equivalent make

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 88A, GurugramSector 88A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS4.5 km
  • Sohna Elevated Corridor (NH-248A)7.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is EMPERIUM TITAN registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1053/785/2026/25. Valid to 31 Mar 2031.

The source ↗
What is the possession timeline for EMPERIUM TITAN?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2031. Its registration runs to 31 Mar 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around EMPERIUM TITAN?From the records · Map pin and road lines, read 6 Sep 2026

EMPERIUM TITAN is in Sector 88A, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Harsaru, Sector 88a, Gurugram Manesar Complex. In a straight line it is about 0.7 km from Dwarka Expressway, 4.5 km from Delhi–Gurugram–SNB RRTS and 7.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building EMPERIUM TITAN?From the records · HARERA, read 4 Nov 2026

EMPERIUM TITAN is a Emperium Infrastructure project, registered by its company EMPERIUM INFRASTRUCTURE PRIVATE LIMITED.

The source ↗Emperium Infrastructure's projects and court record

The records

What the registers hold for EMPERIUM TITAN: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1053/785/2026/25: Registered. Valid to 31 Mar 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 165 OF 2025 is on the DTCP register, valid to 3 Sep 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 4 Sep 2025.Declared to HARERA, read 29 Oct 2026
The court record of Emperium Infrastructure’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 86 HARERA files, with the dates we read them
Registration no.
GGM/1053/785/2026/25
Registration valid till
31 Mar 2031
Declared possession
31 Mar 2031

Declared by the promoter to HARERA

Land area
1.03125 (Acre) (4,173.32 sq m)
FAR
2.4 proposed of 2.4 permissible
licence
LC No. 165 of 2025
Estimated project cost
₹99.36 crore
Cost of land
₹21.41 crore
Building plans, declared approved
4 Sept 2025
Construction to start
1 May 2026
Completion declared for
31 Mar 2031
Declared inventory · 11 types

Declared inventory — 11 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 18 units · 100.06 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 18 units · 100.06 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 18 units · 100.14 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 16 units · 100.14 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 85.14 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 100.06 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 5.27 sq m carpet · 2 towers · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 14.55 sq m carpet · 2 towers · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. BUILDING PLAN APPROVAL — declared: already been obtained (4 Feb 2026)
  • II. AAI — declared: already been obtained (6 Feb 2026)
  • III. LICENSE APPROVAL — declared: already been obtained (4 Sept 2025)
  • IV. DEMARCATION CUM ZONING PLAN APPROVAL — declared: already been obtained (5 Sept 2025)
  • V. FIRE SCHEME APPROVAL — declared: applied for but yet to receive (24 Feb 2026)
  • VI. SPE (APPLIED AND PENDING IN HSVP) — declared: applied for but yet to receive (23 Feb 2026)
  • VII. ELECTRIFICATION PLAN — declared: applied for but yet to receive (2 Feb 2026)
On file with HARERA · 86 files

On file with HARERA (86)

Plans

Site plan

2 files
Site Plan Dtp16 Apr 2026Approved Site Plan12 Feb 2026

Layout plan

1 file
Latest Layout Plan16 Apr 2026

Zoning plan

1 file
Zoning Plan16 Apr 2026

Demarcation plan

1 file
Demarcation Plan16 Apr 2026

Building plans

8 files
AOA Emperium Infrastructure Private Limited16 Apr 2026Building Plan Emperium Titan16 Apr 2026Building Plan16 Apr 2026

Floor plans

5 files
18th and 19th Floor Plan16 Apr 2026Unit Plans & Area Diagram16 Apr 2026Typical Floor 3rd to 17th Floor Plan16 Apr 2026

Services

Sewerage and drainage

3 files
Sewerage Layout Plan16 Apr 2026Storm Water Plan16 Apr 2026Assurances - Storm, Sewer, Drinking Water16 Apr 2026

Water supply

1 file
Water Supply Plan16 Apr 2026

Electricity

4 files
Electricity Plan16 Apr 2026Street Lighting Plan16 Apr 2026DHBVN16 Apr 2026Power Line Shifting16 Apr 2026

Landscape and green areas

1 file
Green Area & Landscape Plan16 Apr 2026

Service plans

2 files
Solid Waste Management Plan16 Apr 2026Applied SPE16 Apr 2026

Approvals and clearances

DTCP licence

3 files
Agreement - LC- IV16 Apr 2026LOI Emp16 Apr 2026Licence Copy with Land Schedule12 Feb 2026

Fire safety

1 file
Fire Applied16 Apr 2026

Other NOCs and clearances

9 files
AAI16 Apr 2026Forest NOC16 Apr 2026Forest Land Diversion16 Apr 2026

Land records

Land records

10 files
GPA16 Apr 2026Revenue Record Entry of Licence and Collaboration16 Apr 2026Jamabandi16 Apr 2026

Sales papers

Allotment and sale agreements

2 files
Allottee Documents-Draft - BBA16 Apr 2026Allottee Documents-Final-Allotment Letter16 Apr 2026

Money

Accounts and finance

10 files
Auditor Report 31.03.202516 Apr 2026Audit Report 31.03.202416 Apr 2026Balance Sheet 2022-202316 Apr 2026

The promoter’s papers

Declarations and affidavits

8 files
Affidavit Emperium16 Apr 2026Affidavit for Construction of Road16 Apr 2026Bank Undertaking16 Apr 2026

Company papers

2 files
Certificate of Incorporation Infra - Gurgaon16 Apr 2026ROC Charge - Eipl16 Apr 2026

Other filings

Other filings

12 files
4(2)(L)(D)16 Apr 2026BR for Account Operating16 Apr 2026Equity Certificate16 Apr 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

165 OF 2025 · Emperium Infrastructure Private Limited · GURGAON-MANESAR

Licence valid to 3 Sept 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 13 Feb 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

165 OF 2025

DTCP’s page showed no land schedule for licence 165 OF 2025 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan Dtp16 Apr 2026Approved Site Plan12 Feb 2026

Layout plan

1 file
Latest Layout Plan16 Apr 2026

Building plans

8 files
AOA Emperium Infrastructure Private Limited16 Apr 2026Building Plan Emperium Titan16 Apr 2026Building Plan16 Apr 202620th Floor and Terrace Floor16 Apr 2026BR-III16 Apr 2026BR16 Apr 2026

Floor plans

5 files
18th and 19th Floor Plan16 Apr 2026Unit Plans & Area Diagram16 Apr 2026Typical Floor 3rd to 17th Floor Plan16 Apr 2026Stilt Ground Floor Plan16 Apr 2026First and Second Floor Plan16 Apr 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (86 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3966 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Emperium Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.