FLORA AVENUE 88A

by Gcc Infra · Sector 88A, Gurugram

Not on our price list yet

Possession 30 Dec 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 88A, Gurugram0.7 km from Dwarka Expressway, in a straight line
Carpet area
278–671 sq ft
In m²25.8–62.3 m², as declared
Timeline
  1. 16 Apr 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Dec 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 5 Jan 2028Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1,720 m² in all, by use
  • Plots for sale1,720 m² · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningSpace provision for split AC
  • FloorsVitrified tiles
  • Main doorIRON shutter
  • Electrical fittingsOne point for connecting internal electrical system
  • Water storageRCC tank in basement

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 88A, GurugramSector 88A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS4.5 km
  • Sohna Elevated Corridor (NH-248A)7.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is FLORA AVENUE 88A registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/1031/763/2026/03. Valid to 5 Jan 2028.

The source ↗
What is the possession timeline for FLORA AVENUE 88A?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Dec 2025. Its registration runs to 5 Jan 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around FLORA AVENUE 88A?From the records · Map pin and road lines, read 6 Sep 2026

FLORA AVENUE 88A is in Sector 88A, Gurugram; the site address declared to HARERA is Sector-88a. In a straight line it is about 0.7 km from Dwarka Expressway, 4.5 km from Delhi–Gurugram–SNB RRTS and 7.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building FLORA AVENUE 88A?From the records · HARERA, read 3 Nov 2026

FLORA AVENUE 88A is a Gcc Infra project.

The source ↗Gcc Infra's projects and court record

The records

What the registers hold for FLORA AVENUE 88A: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1031/763/2026/03: Registered. Valid to 5 Jan 2028.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 126 OF 2022 is on the DTCP register, valid to 16 Aug 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 16 Apr 2025.Declared to HARERA, read 29 Oct 2026
The court record of Gcc Infra’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 52 HARERA files, with the dates we read them
Registration no.
GGM/1031/763/2026/03
Registration valid till
5 Jan 2028
Declared possession
30 Dec 2025

Declared by the promoter to HARERA

Land area
0.425 (Acre) (1,719.91 sq m)
FAR
1.47 proposed of 1.5 permissible
licence
126 of 2022 Dated.17.08.2022 and 05 of 2023 Dated.06.01.2023
Estimated project cost
₹32.00 crore
Cost of land
₹7.36 crore
Building plans, declared approved
16 Apr 2025
Completion declared for
30 Dec 2025
Declared inventory · 48 types

Declared inventory — 48 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type G-1 · 1 unit · 20.51 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • APARTMENT/SHOPS/OTHER BUILDINGS Type G-2 · 1 unit · 62.31 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type G-3 · 1 unit · 57.02 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type G-4 · 1 unit · 55.26 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type G-5 · 1 unit · 53.5 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type G-6 · 1 unit · 51.75 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type G-7 · 1 unit · 49.99 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type G-8 · 1 unit · 48.23 sq m carpet · one flat
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. SITE PLAN (MEMO NO. 1830) — declared: already been obtained (16 Apr 2025)
  • II. APPROVAL- WATER SUPPLY (GMDA) — declared: already been obtained (16 Jan 2023)
  • III. APPROVAL- SEWAGE DISPOSAL (GMDA) — declared: already been obtained (11 Jan 2023)
  • IV. APPROVAL- STROM WATER DRAINAGE (GMDA) — declared: already been obtained (11 Jan 2023)
  • V. APPROVAL- ELECTRICAL LOAD (DHBVN) — declared: already been obtained (19 Jan 2025)
  • VI. LICENSE 1- 126 OF 2022 DATED 17.08.2022 — declared: already been obtained (17 Aug 2022)
  • VII. LICENSE 2- 05 OF 2023 DATED 06.01.2023 — declared: already been obtained (6 Jan 2023)
  • VIII. FIRE SCHEME APPROVAL (MEMO NO. PS/2025/775 DATED 05.06.2025) — declared: already been obtained (5 Jun 2025)
  • IX. DEMARCATION CUM ZONING PLAN — declared: already been obtained (18 Oct 2024)
On file with HARERA · 52 files

On file with HARERA (52)

Plans

Site plan

1 file
Approved Site Plan27 May 2025

Layout plan

1 file
Latest Layout Plan16 May 2025

Zoning plan

1 file
Zoning Plan27 May 2025

Demarcation plan

2 files
Superimposed Demarcation Plan9 Jan 2026Demarcation Plan27 May 2025

Building plans

5 files
Commercial Approv Drawing (5)9 Jan 2026Building Plan9 Jan 2026Commercial Approv Drawing (4)9 Jan 2026

Services

Sewerage and drainage

3 files
Assurance of Sewerage9 Jan 2026Assurance for Supply of 135 Kld STP9 Jan 2026Assurance for Storm Water9 Jan 2026

Water supply

1 file
Assurance of Water Demand of 550 Kld9 Jan 2026

Electricity

1 file
Assurance of Power Supply9 Jan 2026

Service plans

1 file
Service Plans on the Layout16 May 2025

Approvals and clearances

DTCP licence

2 files
LC-IV Agreement 7.375 Acres9 Jan 2026Licence Copy with Land Schedule16 May 2025

Fire safety

1 file
Fire Scheme9 Jan 2026

Other NOCs and clearances

1 file
Forest NOC9 Jan 2026

Land records

Land records

6 files
Revenue Record Entry of Licence and Collaboration9 Jan 2026Aks-Sizra9 Jan 2026Sale Deed9 Jan 2026

Sales papers

Allotment and sale agreements

3 files
Conveyance Deed9 Jan 2026BBA9 Jan 2026Allotment 88A9 Jan 2026

Brochure and specifications

1 file
Brochure9 Jan 2026

Money

Accounts and finance

12 files
Banking Operation BR9 Jan 2026EDC IDC9 Jan 2026Balance Sheet Gcc-Flora 23-249 Jan 2026

Timeline and progress

Construction schedule

1 file
PERT Chart9 Jan 2026

The promoter’s papers

Declarations and affidavits

3 files
Application Form9 Jan 2026Promoters Affidavit9 Jan 2026The Promoter’s Declaration on Affidavit17 May 2025

Other filings

Other filings

6 files
Reciept9 Jan 2026LC-IV 3.25 Acres9 Jan 2026LOI 7.375 Acres9 Jan 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

126 OF 2022 · GCC INFRA · GURGAON-MANESAR

Licence valid to 16 Aug 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

05 OF 2023 · GCC INFRA · GURGAON-MANESAR

Licence valid to 5 Jan 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Jun 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

126 OF 2022: 13 parcels, 7.375 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 7.375 acres.

  • 55//10/16 kanal 12 marla
  • 55//11/25 kanal 14 marla
  • 55//128 kanal
  • 55//20/14 kanal 8 marla
Show the other 9 parcels
  • 55//55 kanal 3 marla
  • 55//65 kanal 3 marla
  • 55//8/13 kanal 12 marla
  • 55//8/2/12 kanal 4 marla
  • 55//9/14 kanal
  • 55//9/24 kanal
  • 55//7/13 kanal 19 marla
  • 55//7/24 kanal 1 marla
  • 55//8/2/22 kanal 4 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

05 OF 2023: 7 parcels, 3.25 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 3.25 acres.

  • 55//138 kanal
  • 55//14/19 marla
  • 55//14/31 kanal 9 marla
  • 55//15/15 marla
Show the other 3 parcels
  • 55//188 kanal
  • 55//19/112 marla
  • 55//23/37 kanal 5 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 55//10/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan27 May 2025

Layout plan

1 file
Latest Layout Plan16 May 2025

Building plans

5 files
Commercial Approv Drawing (5)9 Jan 2026Building Plan9 Jan 2026Commercial Approv Drawing (4)9 Jan 2026BR III Commercial 88A9 Jan 2026Approved Building Plans, Full Set27 May 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (52 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3496 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Gcc Infra

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.