Not on our price list yet

Possession 13 Sep 2022 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 84, Gurugram1.1 km from Dwarka Expressway, in a straight linePrices and what changed
Registered
14 Sep 2017
Registered by
ELAN BUILDCON PRIVATE LIMITEDthe company that filed it, for Elan Group
Timeline
  1. 24 Aug 2017Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 14 Sep 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 13 Sep 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 13 Sep 2023Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside5.913 acres in all, by use
  • Roads2.277 acres · 39%
  • Green belts1.498 acres · 25%
  • Sewage and waste treatment0.927 acres · 16%
  • Pavements0.624 acres · 11%
  • Parking0.549 acres · 9%
  • Electricity sub-station0.038 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningCentralised chiller for cinema and VRV for apartments
  • KitchenKitchen ATE counter granite & PLY cabinet with laminate finish
  • LiftsMitsubishi ( lift) OTLS ( escalators)
  • WardrobesPlywood & board with laminated finish
  • FloorsVitrified tiles
  • WallsOBD
  • BathroomsCP- fittings- grohe / jaqar chinaware- ROCA/american standard/equivalent
  • WindowsToughened glass with aluminium frame

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 84, GurugramSector 84, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.1 km
  • Delhi–Gurugram–SNB RRTS2.3 km
  • Sohna Elevated Corridor (NH-248A)7.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 12 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 7
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Elan Miracle registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 190 OF 2017, registered on 14 Sep 2017. Ended 13 Sep 2023. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Elan Miracle?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 13 Sep 2022. Its registration runs to 13 Sep 2023; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Elan Miracle?From the records · Map pin and road lines, read 6 Sep 2026

Elan Miracle is in Sector 84, Gurugram; the site address declared to HARERA is Village Hyatpur Sector 84. In a straight line it is about 1.1 km from Dwarka Expressway, 2.3 km from Delhi–Gurugram–SNB RRTS and 7.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Elan Miracle?From the records · HARERA, read 4 Nov 2026

Elan Miracle is a Elan Group project, registered by its company ELAN BUILDCON PRIVATE LIMITED.

The source ↗Elan Group's projects and court record

The records

What the registers hold for Elan Miracle: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 190 OF 2017: Registration expired. Ended 13 Sep 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 34 OF 2014 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 11 Jun 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 24 Aug 2017, building plans 24 Aug 2017.Declared to HARERA, read 29 Oct 2026
The court record of Elan Group’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 13 Sep 2023. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 34 OF 2014 validity ended

    Named in this project’s application. Valid to 11 Jun 2026. The register links a completion certificate (LC-IX), dated 5 Sep 2025, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 27 HARERA files, with the dates we read them
Registration no.
190 OF 2017
Registration date
14 Sept 2017
Registration valid till
13 Sept 2023
Declared possession
13 Sept 2022

Declared by the promoter to HARERA

Land area
5.91875 (Acre) (23,952.33 sq m)
FAR
1.48 proposed of 1.5 permissible
licence
34 of 2014 dated 12.06.2014
Estimated project cost
₹310.62 crore
Cost of land
₹87.02 crore
Layout plan, declared approved (field 5a)
24 Aug 2017
Building plans, declared approved
24 Aug 2017
Completion declared for
13 Sept 2022
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL/COMMERCIAL · 396 units
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. BUILDING PLAN — declared: already been obtained (24 Aug 2017)
  • II. APPROVAL OF SERVICE ESTIMATE — declared: yet to file for approval
  • III. APPROVAL OF FIRE SCHEME — declared: yet to file for approval
  • IV. FIRE NOC — declared: yet to file for approval
  • V. OCCUPATION CERTIFICATE — declared: yet to file for approval
On file with HARERA · 27 files

On file with HARERA (27)

Plans

Site plan

1 file
Approved Site Plan10 Dec 2019

Layout plan

1 file
Latest Layout Plan10 Dec 2019

Zoning plan

1 file
Zoning Plan10 Dec 2019

Demarcation plan

1 file
Demarcation Plan10 Dec 2019

Building plans

2 files
Building Plan3 Feb 2020Approved Building Plans, Full Set10 Dec 2019

Services

Service plans

1 file
Service Plans on the Layout10 Dec 2019

Approvals and clearances

Occupation certificate (OC)

2 files
Occupation Certificate6 Sept 2024OC uploaded17 May 2024

Completion certificate (CC)

1 file
CC uploaded12 Sept 2025

DTCP licence

3 files
LOI3 Feb 2020LC IV3 Feb 2020Licence Copy with Land Schedule10 Dec 2019

Environment clearance

1 file
Enviornment Clearance3 Feb 2020

Other NOCs and clearances

2 files
Forest NOC3 Feb 2020AAI NOC3 Feb 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration10 Dec 2019

Sales papers

Allotment and sale agreements

2 files
Allotment Letter16 Dec 2019BBA Miracle16 Dec 2019

Money

Accounts and finance

6 files
CA Certificate16 Dec 2019Balance Sheet Certify by CA 201816 Dec 2019Balance Sheet Certify by CA 201916 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit13 Dec 2019

Company papers

1 file
ROC3 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

34 OF 2014 · Bajaj Motors Ltd. · GURGAON-MANESAR

Licence valid to 11 Jun 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 18 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

34 OF 2014: 9 parcels, 5.9188 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.

The licence register prints the same licensed area, 5.92 acres.

  • 65//133 kanal 18 marla
  • 65//3/33 kanal 4 marla
  • 65//47 kanal 6 marla
  • 65//76 kanal 18 marla
Show the other 5 parcels
  • 65//88 kanal
  • 65//2/2/26 kanal 4 marla
  • 65//3/14 kanal 11 marla
  • 64//23/22 kanal 7 marla
  • 65//9/14 kanal 19 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Hayatpur (hadbast 114), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 65//13.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,21,800 per sq yd

Sector 84, collector rates effective 1 Apr 2026, Manesar tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan10 Dec 2019

Layout plan

1 file
Latest Layout Plan10 Dec 2019

Building plans

2 files
Building Plan3 Feb 2020Approved Building Plans, Full Set10 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (27 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1003 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Elan Group

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.