Skip to content

FOOTFALLS

by Vatika Group · Sector 88B, Gurugram

Not on our price list yet

Possession 30 Sep 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 88B, Gurugram0.6 km from Dwarka Expressway, in a straight line
Registered by
VATIKA LIMITEDthe company that filed it, for Vatika Group
Timeline
  1. 11 Mar 2024Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.625 acres in all, by use
  • Other usesas the form names them: Road and pavement1.71 acres · 65%
  • Plots for sale0.915 acres · 35%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 88B, GurugramSector 88B, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.6 km
  • Delhi–Gurugram–SNB RRTS5.0 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 14 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 3
  • Other register states: 10

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is FOOTFALLS registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/929/661/2025/32. Valid to 30 Sep 2029.

The source ↗
What is the possession timeline for FOOTFALLS?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2029. Its registration runs to 30 Sep 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around FOOTFALLS?From the records · Map pin and road lines, read 6 Sep 2026

FOOTFALLS is in Sector 88B, Gurugram; the site address declared to HARERA is Sector - 88b, Village Harsaru. In a straight line it is about 0.6 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building FOOTFALLS?From the records · HARERA, read 4 Nov 2026

FOOTFALLS is a Vatika Group project, registered by its company VATIKA LIMITED.

The source ↗Vatika Group's projects and court record

The records

What the registers hold for FOOTFALLS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/929/661/2025/32: Registered. Valid to 30 Sep 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 35 OF 2024 is on the DTCP register, valid to 6 Mar 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 11 Mar 2024.Declared to HARERA, read 29 Oct 2026
The court record of Vatika Group’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 34 HARERA files, with the dates we read them
Registration no.
GGM/929/661/2025/32
Registration valid till
30 Sept 2029
Declared possession
30 Sept 2029

Declared by the promoter to HARERA

Land area
2.6250 (Acre) (10,623 sq m)
FAR
the application prints 150, which is not a ratio
licence
License No. 35 of 2024 dated 07.03.2024 and valid upto 06.03.2029.
Estimated project cost
₹30.56 crore
Cost of land
₹0.17 crore
Layout plan, declared approved (field 5a)
11 Mar 2024
Construction to start
1 Oct 2024
Completion declared for
30 Sept 2029
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. LICENSE NO. 35 OF 2024 — declared: already been obtained (7 Mar 2024)
On file with HARERA · 34 files

On file with HARERA (34)

Plans

Site plan

1 file
Approved Site Plan11 Nov 2024

Layout plan

2 files
Latest Layout Plan20 Mar 2025Superimpose Demarcation on Layout20 Mar 2025

Zoning plan

1 file
Zoning Plan11 Nov 2024

Demarcation plan

1 file
Demarcation Plan20 Mar 2025

Building plans

1 file
Approved Building Plans, Full Set22 Nov 2024

Services

Sewerage and drainage

2 files
Assurance for Sewerage20 Mar 2025Assurance for Storm Water20 Mar 2025

Water supply

2 files
App. Service Estimate Water Supply Layout-2.625 Acres20 Mar 2025Assurance for Water Supply20 Mar 2025

Electricity

1 file
Assurance of Supply of Power Load20 Mar 2025

Roads

1 file
Road Access20 Mar 2025

Service plans

1 file
Service Plans on the Layout12 Nov 2024

Approvals and clearances

DTCP licence

3 files
LC-IV & LC-IV (D)20 Mar 2025Licence Copy with Land Schedule20 Mar 2025LOI20 Mar 2025

Land records

Land records

4 files
Collaboration Agreement 120 Mar 2025Collaboration Agreement20 Mar 2025Non-Encumbrance20 Mar 2025Revenue Record Entry of Licence and Collaboration22 Nov 2024

Money

Accounts and finance

7 files
BR for Authorizing Bank Account Operation20 Mar 2025Non-Default Certificate from a CA20 Mar 2025CA Certificate for Cost Incurred20 Mar 2025

Timeline and progress

Construction schedule

1 file
PERT Chart Project Progress Chart20 Mar 2025

The promoter’s papers

Declarations and affidavits

4 files
Affidavit by the Promoter W.r.t. Accounts20 Mar 2025Bank Undertaking20 Mar 2025Affidavit W.r.t. EDC 10%20 Mar 2025The Promoter’s Declaration on Affidavit22 Nov 2024

Other filings

Other filings

2 files
Approach to the Project (Google Map)20 Mar 2025Copy of BR20 Mar 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

35 OF 2024 · Vatika Ltd. · GURGAON-MANESAR

Licence valid to 6 Mar 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Nov 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

35 OF 2024

DTCP’s page showed no land schedule for licence 35 OF 2024 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan11 Nov 2024

Layout plan

2 files
Latest Layout Plan20 Mar 2025Superimpose Demarcation on Layout20 Mar 2025

Building plans

1 file
Approved Building Plans, Full Set22 Nov 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (34 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3188 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Vatika Group

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.