GARDENCITY CENTRAL

by DLF Home Developers · Sector 84, Gurugram

Not on our price list yet

Possession 24 Aug 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 84, Gurugram1.1 km from Dwarka Expressway, in a straight line
Registered by
DLF HOME DEVELOPERS LIMITEDthe company that filed it, for DLF Home Developers
Timeline
  1. 11 Oct 2021Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 24 Aug 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 23 Aug 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside8.04 acres in all, by use
  • Plots for sale2.78 acres · 35%
  • Pavements2.7 acres · 34%
  • Parks and playgrounds2.46 acres · 31%
  • Other usesas the form names them: Balance area not included above0.1 acres · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 84, GurugramSector 84, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.1 km
  • Delhi–Gurugram–SNB RRTS2.3 km
  • Sohna Elevated Corridor (NH-248A)7.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 7
  • Registered, no OC or CC yet: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is GARDENCITY CENTRAL registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/512/244/2021/80. Ended 23 Aug 2025. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for GARDENCITY CENTRAL?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 24 Aug 2024. Its registration runs to 23 Aug 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around GARDENCITY CENTRAL?From the records · Map pin and road lines, read 6 Sep 2026

GARDENCITY CENTRAL is in Sector 84, Gurugram; the site address declared to HARERA is Sector 84, Gurugram, Haryana. In a straight line it is about 1.1 km from Dwarka Expressway, 2.3 km from Delhi–Gurugram–SNB RRTS and 7.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building GARDENCITY CENTRAL?From the records · HARERA, read 4 Nov 2026

GARDENCITY CENTRAL is a DLF Home Developers project, registered by its company DLF HOME DEVELOPERS LIMITED.

The source ↗DLF Home Developers's projects and court record

The records

What the registers hold for GARDENCITY CENTRAL: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/512/244/2021/80: Registration expired. Ended 23 Aug 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 80 OF 2021 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 7 Oct 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 11 Oct 2021, building plans 11 Oct 2021.Declared to HARERA, read 29 Oct 2026
The court record of DLF Home Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 23 Aug 2025. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 80 OF 2021 validity ended

    Named in this project’s application. Valid to 7 Oct 2026. The register links a completion certificate (LC-IX), dated 3 Feb 2025, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 16 HARERA files, with the dates we read them
Registration no.
GGM/512/244/2021/80
Registration valid till
23 Aug 2025
Declared possession
24 Aug 2024

Declared by the promoter to HARERA

Land area
8.0396 (Acre) (32,535.11 sq m)
FAR
0 proposed of 1.5 permissible
licence
80 of 2021
Estimated project cost
₹188.52 crore
Cost of land
₹89.04 crore
Layout plan, declared approved (field 5a)
11 Oct 2021
Building plans, declared approved
11 Oct 2021
Construction to start
1 Mar 2022
Completion declared for
24 Aug 2024
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. FOREST NOC — declared: already been obtained (17 Sept 2021)
  • II. LAYOUT PLAN — declared: already been obtained (11 Oct 2021)
  • III. LICENCE (80 OF 2021) — declared: already been obtained (8 Oct 2021)
  • IV. NATURAL CONSERVATION ZONE NOC — declared: applied for but yet to receive (26 Aug 2021)
  • V. TREE CUTTING NOC — declared: applied for but yet to receive (4 Oct 2021)
  • VI. SPE — declared: applied for but yet to receive (12 Oct 2021)
On file with HARERA · 16 files

On file with HARERA (16)

Plans

Site plan

1 file
Approved Site Plan13 Oct 2021

Layout plan

1 file
Latest Layout Plan13 Oct 2021

Demarcation plan

1 file
Demarcation Plan16 Nov 2021

Services

Sewerage and drainage

2 files
Sewerage Plan16 Nov 2021Storm Water Drainage Plan16 Nov 2021

Water supply

1 file
Water Supply Plan16 Nov 2021

Roads

1 file
Road and Pavement Plan16 Nov 2021

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded25 Feb 2026

DTCP licence

1 file
Licence Copy with Land Schedule13 Oct 2021

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration16 Nov 2021Layout Plan with Khasra16 Nov 2021

Money

Accounts and finance

3 files
Cash Flow Statement16 Nov 2021CA Certificate on the Application’s Figures16 Nov 2021Non-Default Certificate from a CA14 Oct 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit13 Oct 2021

HARERA’s orders

HARERA’s orders

1 file
Extension No. 24 of 2024 dated 10.12.202411 Dec 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

80 OF 2021 · DLF Home Developers Ltd. · GURGAON-MANESAR

Licence valid to 7 Oct 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 14 Oct 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

80 OF 2021: 14 parcels, 8.0396 acres in all, in Sihi (hadbast 108), tehsil Manesar.

The licence register prints the same licensed area, 8.0396 acres.

  • 28//118 kanal
  • 28//128 kanal
  • 28//13/16 kanal 12 marla
  • 28//14/1/14 marla
Show the other 10 parcels
  • 28//17/1/23 kanal
  • 28//17/22 kanal
  • 28//188 kanal
  • 28//19/16 kanal
  • 28//22/1/22 kanal 6 marla 5 sarsai
  • 28//24/16 kanal
  • 28//24/22 kanal
  • 28//25/1/11 kanal 16 marla
  • 27//15/28 kanal 5 marla
  • 37//4/12 kanal 2 marla 7 sarsai

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sihi (hadbast 108), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 28//11.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan13 Oct 2021

Layout plan

1 file
Latest Layout Plan13 Oct 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (16 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1753 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on DLF Home Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.