DALCORE THE FALCON

by Ahir Infraspace · Sector 53, Gurugram

Not on our price list yet

Possession 31 Mar 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 53, Gurugram4.9 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
1,454–3,558 sq ft
In m²about 135–331 m², as declared
Registered by
AHIR INFRASPACE PVT LTDthe company that filed it, for Ahir Infraspace
Timeline
  1. 5 Dec 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Mar 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

99homes, 1,454 to 3,558 sq ft of carpet area
  • 1,000–1,500 sq ft1,454 sq ft3
  • 1,500–2,000 sq ft1,832–1,853 sq ft30
  • 2,000–2,500 sq ft2,046–2,236 sq ft64
  • 3,000 sq ft and above3,558 sq ft2

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside8,132 m² in all, by use
  • Roads3,309 m² · 41%
  • Apartment buildings2,834 m² · 35%
  • Parks and playgrounds1,220 m² · 15%
  • Green belts730 m² · 9%
  • Electricity sub-station29 m² · under 1%
  • Other usesas the form names them: Guardroom10 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAIR-conditioning apartment with energy efficient VRV/VRF system excluding toilets & common area.
  • KitchenFloor: vitrified tiles, wall: ceramic tiles 2FT above counter and OBD paint on remaining area, ceiling: OBD paint
  • Kitchen appliancesModular kitchen with hob, chimney, oven, microwave, dishwasher, refrigerator, washing machine(at utility balcony) of reputed make
  • Lifts4 NOS passenger lift & 1no service lift
  • WardrobesModular wardrobes of standard make in bed rooms(except utility & study)
  • FloorsStone / tiles in common areas
  • WallsAcrylic emulsion paint/ oil bound distemper
  • BathroomsAll provided with standard company make

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 53, GurugramSector 53, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS4.9 km
  • Sohna Elevated Corridor (NH-248A)6.0 km
  • Dwarka ExpresswayOpen, 17 Aug 202510.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is DALCORE THE FALCON registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/913/645/2025/16. Valid to 31 Mar 2031.

The source ↗
What is the possession timeline for DALCORE THE FALCON?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2031. Its registration runs to 31 Mar 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around DALCORE THE FALCON?From the records · Map pin and road lines, read 6 Sep 2026

DALCORE THE FALCON is in Sector 53, Gurugram; the site address declared to HARERA is Plot No Gh-25, Sector 53, Gurugram Ii. In a straight line it is about 4.9 km from Delhi–Gurugram–SNB RRTS, 6.0 km from Sohna Elevated Corridor (NH-248A) and 10.5 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building DALCORE THE FALCON?From the records · HARERA, read 4 Nov 2026

DALCORE THE FALCON is a Ahir Infraspace project, registered by its company AHIR INFRASPACE PVT LTD.

The source ↗Ahir Infraspace's projects and court record

The records

What the registers hold for DALCORE THE FALCON: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/913/645/2025/16: Registered. Valid to 31 Mar 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: building plans 5 Dec 2024.Declared to HARERA, read 29 Oct 2026
The court record of Ahir Infraspace’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 50 HARERA files, with the dates we read them
Registration no.
GGM/913/645/2025/16
Registration valid till
31 Mar 2031
Declared possession
31 Mar 2031

Declared by the promoter to HARERA

Land area
8132.25 (Sqr/mtrs)
FAR
3.14 proposed of 3.15 permissible
licence
ZO002/EO018/UE029/GALOT/0000001441
Estimated project cost
₹595.96 crore
Cost of land
₹125.09 crore
Building plans, declared approved
5 Dec 2024
Construction to start
1 Apr 2025
Completion declared for
31 Mar 2031
Declared inventory · 9 types

Declared inventory — 9 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 58 units · 207.69 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 28 units · 172.15 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 190.12 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 3 units · 135.12 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 330.59 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 284.62 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 39.77 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 203.3 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. ZONING PLAN — declared: already been obtained (11 Oct 2024)
  • II. ASSURANCE OF WATER SUPPLY — declared: already been obtained (25 Jun 2024)
  • III. NOC FOR USE OF TREATED WASTE WATER — declared: already been obtained (24 Apr 2024)
  • IV. PERMISSION FOR TREE CUTTING — declared: already been obtained (5 Feb 2024)
  • V. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (25 Jun 2024)
  • VI. ASSURANCE CERTIFICATE OF DHBVN FOR POWER SUPPLY — declared: already been obtained (12 Jun 2024)
  • VII. NOC FOR ARAVALI BY DEPUTY COMMISSIONER — declared: already been obtained (18 Jun 2024)
  • VIII. BUILDING PLAN APPROVAL — declared: already been obtained (5 Dec 2024)
  • IX. NOC FOR HEIGHT CLEARANCE FROM AAI — declared: already been obtained (16 Jul 2024)
  • X. ENVIRONMENT CLEARANCE — declared: already been obtained (14 Nov 2024)
  • XI. FIRE SCHEME APPROVAL — declared: already been obtained (21 Oct 2024)
  • XII. SERVICE PLAN APPROVAL — declared: already been obtained (24 Sept 2024)
On file with HARERA · 50 files

On file with HARERA (50)

Plans

Site plan

1 file
Approved Site Plan27 Dec 2024

Layout plan

1 file
Latest Layout Plan27 Dec 2024

Zoning plan

1 file
Zoning Plan27 Dec 2024

Building plans

2 files
Terrace, Mumty and Machine Room Plan27 Dec 2024Building Plan Sanction (BR-III)27 Dec 2024

Floor plans

12 files
Typical Floor Plan (1-9, 11, 13, 15-17, 19, 21, 23-28)27 Dec 2024Floor Plan (14, 22)27 Dec 2024Penthouse Type 1 Plan27 Dec 2024

Services

Sewerage and drainage

1 file
Assurance of Sewer Connection27 Dec 2024

Water supply

1 file
Assurance of Water Supply27 Dec 2024

Electricity

1 file
Assurance Certificate DHBVN Electrical Load27 Dec 2024

Service plans

2 files
Service Plans on the Layout26 Mar 2025Services Plan Approval27 Dec 2024

Approvals and clearances

DTCP licence

2 files
HSVP Letter of Intent27 Dec 2024Licence Copy with Land Schedule26 Dec 2024

Environment clearance

1 file
Environment Clearance27 Dec 2024

Fire safety

1 file
Fire Scheme Approval27 Dec 2024

Other NOCs and clearances

5 files
NOC Forest27 Dec 2024NOC for Use of Treated Wastewater27 Dec 2024NOC Aravali27 Dec 2024

Land records

Land records

1 file
Sale Deed27 Dec 2024

Sales papers

Allotment and sale agreements

1 file
Draft Allotment Letter27 Dec 2024

Money

Accounts and finance

5 files
Balance Sheet 2022-2327 Dec 2024Balance Sheet 2021-2227 Dec 2024Balance Sheet 2023-2427 Dec 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit26 Mar 2025

Company papers

1 file
MOA of Company27 Dec 2024

Other filings

Other filings

10 files
Level 34 Plan27 Dec 2024Community Level 1 Plan27 Dec 2024Level 33 Plan27 Dec 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared ZO002/EO018/UE029/GALOT/0000001441. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 31 Dec 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan27 Dec 2024

Layout plan

1 file
Latest Layout Plan27 Dec 2024

Building plans

2 files
Terrace, Mumty and Machine Room Plan27 Dec 2024Building Plan Sanction (BR-III)27 Dec 2024

Floor plans

12 files
Typical Floor Plan (1-9, 11, 13, 15-17, 19, 21, 23-28)27 Dec 2024Floor Plan (14, 22)27 Dec 2024Penthouse Type 1 Plan27 Dec 2024Ground Floor Plan-527 Dec 2024Basement 2 Plan27 Dec 20241&2BHK; Unit Plan27 Dec 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (50 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3264 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ahir Infraspace

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.