Skip to content
New launch

Godrej Sora

by Godrej Highview · Sector 53, Gurugram

From ₹11.80 Cr

₹28,000 a sq ftof carpet area

As listed on godrejproperties.com (“INR 11.80 Cr. onwards”), read 23 Oct 2026. Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 30 Sep 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 53, Gurugram4.9 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
1,552–3,412 sq ft
In m²about 144–317 m², as declared
Land
14569.2000 (Sqr/mtrs)
Price, as listed
From ₹11.80 Cr
Asking rate
₹28,000 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
GODREJ PROPERTIES LIMITEDthe company that filed it, for Godrej Highview
Timeline
  1. 1 May 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

244homes, 1,552 to 3,412 sq ft of carpet area
  • 1,500–2,000 sq ft1,552–1,942 sq ft176
  • 2,000–2,500 sq ft2,250–2,483 sq ft62
  • 2,500–3,000 sq ft2,945 sq ft4
  • 3,000 sq ft and above3,412 sq ft2

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 4 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside14,569 m² in all, by use
  • Other usesas the form names them: Water supply system, Storm water drainage, Sewerage system, Street lighting, Electricity supply system, Security and fire fighting, Renewable energy system, STP (sewage treatment plant), Underground water tank, Rain water harvesting, Electrical substation, Softscape and hardscape4,422 m² · 30%
  • Pavements3,251 m² · 22%
  • Apartment buildings3,172 m² · 22%
  • Roads2,858 m² · 20%
  • Club house865 m² · 6%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAs per specification of standard make
  • KitchenFloor: vitrified tiles, wall: tile cladding 2' above counter and oil bound distemper above THAT, ceiling: oil bound distemper
  • Kitchen appliancesModular kitchen with hob & chimney
  • Lifts3 passenger lifts and 1 service lift
  • FloorsVitrified tiling/laminated wooden flooring/skid resistant vitrified tiles/wooden LOOK skid resistant tiles
  • WallsAcrylic emulsion paint/oil bound distemper
  • BathroomsSanitary fixtures & fittings of repute make
  • WindowsPowder coated/painted aluminum/UPVC windows with 4MM or above thick glazing as per specifications

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 53, GurugramSector 53, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS4.9 km
  • Sohna Elevated Corridor (NH-248A)6.0 km
  • Dwarka ExpresswayOpen, 17 Aug 202510.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 8 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 7

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Godrej Sora registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/976/708/2025/79. Valid to 30 Sep 2032.

The source ↗
What is the possession timeline for Godrej Sora?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2032. Its registration runs to 30 Sep 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Godrej Sora?From the records · Map pin and road lines, read 6 Sep 2026

Godrej Sora is in Sector 53, Gurugram; the site address declared to HARERA is Gh-21, Urban Estate Ii, Sector 53, Gurugram. In a straight line it is about 4.9 km from Delhi–Gurugram–SNB RRTS, 6.0 km from Sohna Elevated Corridor (NH-248A) and 10.5 km from Dwarka Expressway.

The source ↗
What does a home in Godrej Sora cost, and how does that compare nearby?From the records · godrejproperties.com, read 23 Oct 2026; Bhumiq team price list, 16 Sep 2026

The developer's website, godrejproperties.com, lists homes from ₹11.80 Cr ("INR 11.80 Cr. onwards"). The Bhumiq team's price list has ₹28,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for Godrej Sora: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/976/708/2025/79: Registered. Valid to 30 Sep 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 1 May 2025, building plans 1 May 2025.Declared to HARERA, read 29 Oct 2026
The court record of Godrej Highview’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 55 HARERA files, with the dates we read them
Registration no.
GGM/976/708/2025/79
Registration valid till
30 Sept 2032
Declared possession
30 Sept 2032
Asking price (indicative)
₹28,000 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
14569.2000 (Sqr/mtrs)
FAR
4.1 proposed of 4.12 permissible
licence
Group Housing Site No. 21 in Sector-53 Gurugram Allotment from HSVP and Conveyance deed vide no. 6686 dated 24.06.2025
Estimated project cost
₹1570.18 crore
Cost of land
₹469.32 crore
Layout plan, declared approved (field 5a)
1 May 2025
Building plans, declared approved
1 May 2025
Construction to start
1 Aug 2025
Completion declared for
30 Sept 2032
Declared inventory · 7 types

Declared inventory

  • Apartment/Shops/Other Buildings · 58 units · 144.14 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 118 units · 180.39 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 60 units · 208.99 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 230.65 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 273.57 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 316.97 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 12.32 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. BUILDING PLAN — declared: already been obtained (1 May 2025)
  • II. ALLOTMENT LETTER — declared: already been obtained (22 Jan 2025)
  • III. POSSESSION CERTIFICATE — declared: already been obtained (7 Apr 2025)
  • IV. ZONING — declared: already been obtained (14 Jan 2025)
  • V. CONVEYANCE DEED — declared: already been obtained (24 Jun 2025)
On file with HARERA · 55 files

On file with HARERA (55)

Plans

Site plan

3 files
Site Plan Services26 Aug 2025Site Plan Green Area26 Aug 2025Approved Site Plan4 Jul 2025

Layout plan

1 file
Latest Layout Plan4 Jul 2025

Zoning plan

1 file
Zoning Plan26 Aug 2025

Building plans

14 files
2nd Floor Plan Terrace Refugee Area Tower 126 Aug 2025Section 2 Tower 1 and 426 Aug 2025Section 2 Tower 2 and 326 Aug 2025

Floor plans

9 files
Ground Floor and First Floor Area Plan Tower 226 Aug 2025Ground Floor and First Floor Area Plan Tower 326 Aug 2025Ground Floor and First Floor Area Plan Tower 126 Aug 2025

Services

Sewerage and drainage

4 files
Sewage Rain Water and Water Supply Tower 2 and 326 Aug 2025Sewage Rain Water and Water Supply Tower 1 and 426 Aug 2025Strom Water Approval4 Jul 2025Sewerage Approval4 Jul 2025

Water supply

1 file
Drinking Water Approval26 Aug 2025

Electricity

1 file
DHBVN4 Jul 2025

Roads

1 file
Dtp Clarification Road Access26 Aug 2025

Service plans

1 file
Service Plan Estimates4 Jul 2025

Approvals and clearances

DTCP licence

2 files
LOI from HSVP26 Aug 2025Licence Copy with Land Schedule3 Jul 2025

Fire safety

1 file
Fire Protection Tower4 Jul 2025

Other NOCs and clearances

2 files
AAI4 Jul 2025Forest NOC4 Jul 2025

Land records

Land records

2 files
Sale Deed from HSVP26 Aug 2025Land Title Search Report8 Jul 2025

Sales papers

Allotment and sale agreements

3 files
Allottment Letter Draft26 Aug 2025Allotment Letter from HSVP26 Aug 2025BBA26 Aug 2025

Money

Accounts and finance

3 files
CA Certificate Cost Incurred26 Aug 2025CA Certificate Inventory26 Aug 2025Non-Default Certificate from a CA4 Jul 2025

Timeline and progress

Construction schedule

1 file
PERT Chart26 Aug 2025

The promoter’s papers

Declarations and affidavits

3 files
The Promoter’s Declaration on Affidavit26 Aug 2025Bank Undertaking26 Aug 2025Affidavit 42LD26 Aug 2025

Other filings

Other filings

2 files
BR for Account Operation26 Aug 2025HSVP Letter-53 3.6 Acres for Independent Sale26 Aug 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared Group Housing Site No. 21 in Sector-53 Gurugram Allotment from HSVP and Conveyance deed vide no. 6686 dated 24.06.2025. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 8 Jul 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate, residential flat
₹10,780 per sq ft

this sector, collector rates effective 1 Apr 2026, Wazirabad tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan Services26 Aug 2025Site Plan Green Area26 Aug 2025Approved Site Plan4 Jul 2025

Layout plan

1 file
Latest Layout Plan4 Jul 2025

Building plans

14 files
2nd Floor Plan Terrace Refugee Area Tower 126 Aug 2025Section 2 Tower 1 and 426 Aug 2025Section 2 Tower 2 and 326 Aug 2025Section 1 and 2 Tower 2 and 326 Aug 20252nd Floor Plan Terrace Refugee Area Tower 226 Aug 20252nd Floor Plan Terrace Refugee Area Tower 326 Aug 2025

Floor plans

9 files
Ground Floor and First Floor Area Plan Tower 226 Aug 2025Ground Floor and First Floor Area Plan Tower 326 Aug 2025Ground Floor and First Floor Area Plan Tower 126 Aug 2025Basement 02 Plan Area Calculation26 Aug 2025Basement 01 Plan Area Statement26 Aug 2025Community Building Ground First and Second Floor26 Aug 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (55 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3510 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Godrej Highview

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

From ₹11.80 CrBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.