Under construction

Tulip Monsella

by Tulip Infratech · Sector 53, Gurugram

Not on our price list yet

Possession 17 May 2022 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 53, Gurugram4.9 km from Delhi–Gurugram–SNB RRTS, in a straight line
Registered by
TULIP INFRATECH PVT. LTD.the company that filed it, for Tulip Infratech
Timeline
  1. 28 Oct 2021Layout plan approveddeclared to HARERA, read 15 Oct 2026
  2. 13 Apr 2022Building plans approveddeclared to HARERA, read 15 Oct 2026
  3. 17 May 2022Possession, as declareddeclared to HARERA, read 15 Oct 2026
  4. 31 Dec 2030Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside77,878 m² in all, by use
  • Roads39,573 m² · 51%
  • Parks and playgrounds23,672 m² · 30%
  • Apartment buildings7,515 m² · 10%
  • Other usesas the form names them: Area under commercial5,720 m² · 7%
  • Club house981 m² · 1%
  • Electricity sub-station417 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 15 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenMarble/granite counter with stainless steel sink, CP fittings and modular kitchen.
  • LiftsCapacity of 10 / 13 persons, KONE or equivalent
  • FloorsI) living/dining: tiles /imported marble II) master bed room/dress room and bedroom : laminated wooden flooring III) kitchen: anti skid tiles / equivalent IV) all toilets: premium quality tiles. V) SIT OUTS/balcony: anti skid ceramic tiles VI) utility room: vitrified tiles VII) utility toilet & balcony: anti skid ceramic floor tiles.
  • WallsI) living/dining, master bedroom, bedrooms: acrylic emulsion paint finish II) master toilet/dress room, toilets: premium quality tiles/mirror III) kitchen: 2’-0” DADO above counters and acrylic emulsion paint. IV) utility rooms/ utility balcony/utility toilet: oil bound paint finish V) SIT OUTS/balcony: permanent texture/paint finish.
  • BathroomsI) master toilet/dress room: sanitary WARE includes WASH basin and EWC CP fittings: hot and cold water wall and basin mixture of premium brands, HAND shower, health fauset& angle valve.
  • WindowsEnergy efficient double glass aluminium / upvcglazings with FLY MESH shutter in all habitable areas & aluminium / UPVC frames with single glass in all toilets & utility rooms.
  • Main doorMoulded SKIN door / panel door shutters.
  • Electrical fittingsSwitches only (no lights& fixtures)

The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 53, GurugramSector 53, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS4.9 km
  • Sohna Elevated Corridor (NH-248A)6.0 km
  • Dwarka ExpresswayOpen, 17 Aug 202510.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 9 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 5
  • Other register states: 3

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Tulip Monsella registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/554/286/2022/29. Valid to 31 Dec 2030.

The source ↗
What is the possession timeline for Tulip Monsella?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 17 May 2022. Its registration runs to 31 Dec 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Tulip Monsella?From the records · Map pin and road lines, read 6 Sep 2026

Tulip Monsella is in Sector 53, Gurugram; the site address declared to HARERA is Sector 53 Gurugram. In a straight line it is about 4.9 km from Delhi–Gurugram–SNB RRTS, 6.0 km from Sohna Elevated Corridor (NH-248A) and 10.5 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Tulip Monsella?From the records · HARERA, read 3 Nov 2026

Tulip Monsella is a Tulip Infratech project, registered by its company TULIP INFRATECH PVT. LTD..

The source ↗Tulip Infratech's projects and court record

The records

What the registers hold for Tulip Monsella: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/554/286/2022/29: Registered. Valid to 31 Dec 2030.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Licence 172 OF 2004, as the developer typed it: no match in the registers searched.Declared to HARERA, read 15 Oct 2026
  • Plans approved, as the developer declared: layout plan 28 Oct 2021, building plans 13 Apr 2022.Declared to HARERA, read 15 Oct 2026
The court record of Tulip Infratech’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 14 HARERA files, with the dates we read them
Registration no.
GGM/554/286/2022/29
Registration valid till
31 Dec 2030
Declared possession
17 May 2022

Declared by the promoter to HARERA

Land area
19.244 (Acre) (77,877.7 sq m)
FAR
the application prints 350, which is not a ratio
licence
168 TO 172 OF 2004 AND 545-546 OF 2006
Estimated project cost
₹3020.77 crore
Cost of land
₹373.17 crore
Layout plan, declared approved (field 5a)
28 Oct 2021
Building plans, declared approved
13 Apr 2022
Completion declared for
17 May 2022
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. LICENSE APPROVAL — declared: already been obtained (17 Sept 2021)
  • II. ZONING PLAN APPROVAL — declared: already been obtained (6 Aug 2014)
  • III. BUILDING PLAN / SITE PLAN APPROVAL — declared: already been obtained (13 Apr 2022)
  • IV. ENVIRONMENT CLEARANCE APPROVAL BASED ON LATEST APPROVED BUILDING PLAN — declared: applied for but yet to receive (30 Apr 2019)
On file with HARERA · 14 files

On file with HARERA (14)

Plans

Site plan

1 file
Approved Site Plan17 May 2022

Layout plan

1 file
Latest Layout Plan9 Nov 2021

Zoning plan

1 file
Zoning Plan17 May 2022

Demarcation plan

1 file
Demarcation Plan17 May 2022

Building plans

1 file
Approved Building Plans, Full Set17 May 2022

Services

Service plans

1 file
Service Plans on the Layout9 Nov 2021

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule17 May 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration17 May 2022

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures17 May 2022Non-Default Certificate from a CA17 May 2022Cash Flow Statement17 May 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit9 Nov 2021

HARERA’s orders

HARERA’s orders

1 file
Registration Certificate has been amended dated 13.09.2022 due to clarification regarding rights, interest, liabilities and obligation of M/s Vipul Limited and M/s Tulip Infratech Private Limited1 Dec 2022

Other filings

Other filings

1 file
Bip Final Approval17 May 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

The promoter declared 172 OF 2004. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 546 OF 2006. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Nov 2021 · read 15 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Collector rate, residential flat
₹10,780 per sq ft

this sector, collector rates effective 1 Apr 2026, Wazirabad tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Tulip Monsella”, by M/s Tulip Infratech Pvt. Ltd., code Gurgaon-0922-002900, approved 2022.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan17 May 2022

Layout plan

1 file
Latest Layout Plan9 Nov 2021

Building plans

1 file
Approved Building Plans, Full Set17 May 2022

Among the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (14 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1774 · read 15 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Tulip Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.