Skip to content

ICONIC

by Celestial Estate · Sector 71, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 71, Gurugram1.9 km from Sohna Elevated Corridor (NH-248A), in a straight line
Registered by
CELESTIAL ESTATE PRIVATE LIMITEDthe company that filed it, for Celestial Estate
Timeline
  1. 24 Apr 2012Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside3.409 acres in all, by use
  • Other uses2.119 acres · 62%
  • Apartment buildings1.29 acres · 38%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningISI MARK
  • KitchenGranite counter
  • LiftsOTIS/KONE/cassia/ETC
  • WardrobesWooden
  • FloorsVitrified / ceramic tiles
  • WallsPlastic paint
  • BathroomsCP fittings/chinaware
  • WindowsUPVC/ACP

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 71, GurugramSector 71, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)1.9 km
  • Delhi–Gurugram–SNB RRTS2.9 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is ICONIC registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/771/503/2023/115. The register’s record shows an end date of 31 Dec 2025. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around ICONIC?From the records · Map pin and road lines, read 6 Sep 2026

ICONIC is in Sector 71, Gurugram; the site address declared to HARERA is C25h+X7w, Behrampur Village, Sector 71, Gurugram, Haryana 122004. In a straight line it is about 1.9 km from Sohna Elevated Corridor (NH-248A), 2.9 km from Delhi–Gurugram–SNB RRTS and 3.1 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ICONIC?From the records · HARERA, read 4 Nov 2026

ICONIC is a Celestial Estate project, registered by its company CELESTIAL ESTATE PRIVATE LIMITED.

The source ↗Celestial Estate's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for ICONIC: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/771/503/2023/115: Registration lapsed. The register’s record shows an end date of 31 Dec 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 101 OF 2011 is on the DTCP register: Licence ends soon; the register prints its validity to 28 Nov 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 24 Apr 2012, building plans 24 Apr 2012.Declared to HARERA, read 29 Oct 2026
The court record of Celestial Estate’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2025. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 101 OF 2011 ends soon

    Named in this project’s application. Valid to 28 Nov 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 33 HARERA files, with the dates we read them
Registration no.
GGM/771/503/2023/115
Registration valid till
31 Dec 2025

Declared by the promoter to HARERA

Land area
3.409 (Acre) (13,795.73 sq m)
FAR
the application prints 174, which is not a ratio
licence
Licence no 101 of 2011 dated 29.11.2011
Estimated project cost
₹245.30 crore
Cost of land
₹14.29 crore
Layout plan, declared approved (field 5a)
24 Apr 2012
Building plans, declared approved
24 Apr 2012
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type · 722 units · 13,796 sq m carpet
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE LC-V 101 OF 2011 — declared: already been obtained (29 Nov 2011)
  • II. BUILDING PLAN SANCTION — declared: already been obtained (24 Apr 2012)
  • III. AIRPORT AUTHORITY OF INDIA PERMISSION — declared: already been obtained (1 Sept 2023)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (6 Aug 2014)
  • V. ZONING PLAN — declared: already been obtained (30 Nov 2011)
On file with HARERA · 33 files

On file with HARERA (33)

Plans

Site plan

2 files
Site Plan25 Jun 2024Approved Site Plan24 Jul 2023

Layout plan

1 file
Latest Layout Plan24 Jul 2023

Zoning plan

1 file
Zoning Plan25 Jun 2024

Demarcation plan

1 file
Demarcation Plan24 Jul 2023

Building plans

3 files
Elevation & Section25 Jun 2024Revalidated Building Plan25 Jun 2024Approved Building Plans, Full Set24 Jul 2023

Floor plans

7 files
2nd Basement Plan25 Jun 20242nd Floor Plan25 Jun 20243rd to 5th Floor Plan25 Jun 2024

Services

Sewerage and drainage

1 file
Assurance Water Sewer Storm25 Jun 2024

Electricity

1 file
Power Assurance25 Jun 2024

Service plans

1 file
Service Plans on the Layout24 Jul 2023

Approvals and clearances

DTCP licence

3 files
License25 Jun 2024LC-IV25 Jun 2024Licence Copy with Land Schedule24 Jul 2023

Environment clearance

1 file
Environment Clearance25 Jun 2024

Other NOCs and clearances

2 files
Forest NOC25 Jun 2024Airport Height Clearance25 Jun 2024

Land records

Land records

5 files
Revenue Record Entry of Licence and Collaboration25 Jun 2024Ak Shijra25 Jun 2024Jamabandi25 Jun 2024

Money

Accounts and finance

3 files
Cash Flow Statement24 Jul 2023CA Certificate on the Application’s Figures24 Jul 2023Non-Default Certificate from a CA24 Jul 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit25 Jun 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

101 OF 2011 · Celestial Estate Pvt Ltd · GURGAON-MANESAR

Licence valid to 28 Nov 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 25 Jul 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

101 OF 2011: 8 parcels, 3.4097 acres in all, in Fazilpur jharsa (hadbast 99), tehsil Badshahpur.

The licence register prints the same licensed area, 3.41 acres.

  • 22//13/27 kanal 11 marla
  • 22//13/34 marla
  • 22//14/12 kanal
  • 22//14/21 marla 5 sarsai
Show the other 4 parcels
  • 22//173 kanal 18 marla
  • 22//188 kanal
  • 22//233 kanal 16 marla
  • 22//24/11 kanal 15 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Fazilpur jharsa (hadbast 99), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 22//13/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan25 Jun 2024Approved Site Plan24 Jul 2023

Layout plan

1 file
Latest Layout Plan24 Jul 2023

Building plans

3 files
Elevation & Section25 Jun 2024Revalidated Building Plan25 Jun 2024Approved Building Plans, Full Set24 Jul 2023

Floor plans

7 files
2nd Basement Plan25 Jun 20242nd Floor Plan25 Jun 20243rd to 5th Floor Plan25 Jun 20241st Floor Plan25 Jun 20246th to 10th Floor Plan25 Jun 2024Ground Floor Plan25 Jun 20241st Basement Plan25 Jun 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (33 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2552 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Celestial Estate

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.