Key facts

Location
Sector 71, Gurugram1.9 km from Sohna Elevated Corridor (NH-248A), in a straight line
Registered by
WHITELAND CORPORATION PRIVATE LIMITEDthe company that filed it, for Whiteland Corporation
Timeline
  1. 13 Sep 2021Layout and building plans approveddeclared to HARERA, read 15 Oct 2026
  2. 31 Dec 2023Possession, as declareddeclared to HARERA, read 15 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside10,724 m² in all, by use
  • Roads4,583 m² · 43%
  • Plots for sale3,753 m² · 35%
  • Other uses1,580 m² · 15%
  • Green belts487 m² · 5%
  • Electricity sub-station170 m² · 2%
  • Sewage and waste treatment150 m² · 1%

The land-use table of the HARERA application, declared to HARERA, read 15 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 71, GurugramSector 71, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)1.9 km
  • Delhi–Gurugram–SNB RRTS2.9 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 12 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 9

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is URBAN CUBES 71 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/489/221/2021/57. Ended 31 Dec 2023. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for URBAN CUBES 71?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2023. Its registration runs to 31 Dec 2023; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around URBAN CUBES 71?From the records · Map pin and road lines, read 6 Sep 2026

URBAN CUBES 71 is in Sector 71, Gurugram; the site address declared to HARERA is Sector - 71. In a straight line it is about 1.9 km from Sohna Elevated Corridor (NH-248A), 2.9 km from Delhi–Gurugram–SNB RRTS and 3.1 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building URBAN CUBES 71?From the records · HARERA, read 4 Nov 2026

URBAN CUBES 71 is a Whiteland Corporation project, registered by its company WHITELAND CORPORATION PRIVATE LIMITED.

The source ↗Whiteland Corporation's projects and court record

The records

What the registers hold for URBAN CUBES 71: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/489/221/2021/57: Registration expired. Ended 31 Dec 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 67 OF 2021 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 12 Sep 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 13 Sep 2021, building plans 13 Sep 2021.Declared to HARERA, read 15 Oct 2026
The court record of Whiteland Corporation’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2023. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 67 OF 2021 validity ended

    Named in this project’s application. Valid to 12 Sep 2026. The register links a completion certificate (LC-IX), dated 22 Jul 2024, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 28 HARERA files, with the dates we read them
Registration no.
GGM/489/221/2021/57
Registration valid till
31 Dec 2023
Declared possession
31 Dec 2023

Declared by the promoter to HARERA

Land area
2.65 (Acre) (10,724.17 sq m)
FAR
1.5 proposed of 1.5 permissible
licence
67 of 2021 Dated 13.09.2021
Estimated project cost
₹51.96 crore
Cost of land
₹23.50 crore
Layout plan, declared approved (field 5a)
13 Sept 2021
Building plans, declared approved
13 Sept 2021
Construction to start
1 Oct 2021
Completion declared for
31 Dec 2023
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. LICENSE 67 OF 2021 — declared: already been obtained (13 Sept 2021)
On file with HARERA · 28 files

On file with HARERA (28)

Plans

Site plan

1 file
Approved Site Plan26 Oct 2021

Layout plan

1 file
Latest Layout Plan26 Oct 2021

Zoning plan

1 file
Zoning Plan26 Oct 2021

Demarcation plan

2 files
Demarcation Plan26 Oct 2021Superimposed Demarcation Plan Over Lyout Plan26 Oct 2021

Building plans

1 file
Approved Building Plans, Full Set26 Oct 2021

Services

Sewerage and drainage

2 files
Sewerage Plan26 Oct 2021Storm Water Drainage Plan26 Oct 2021

Water supply

1 file
Water Supply Plan26 Oct 2021

Electricity

2 files
Electricity Supply Plan26 Oct 2021Street Light Plan26 Oct 2021

Roads

1 file
Road and Pavement Plan26 Oct 2021

Landscape and green areas

1 file
Landscape Plan26 Oct 2021

Service plans

2 files
Service Plans on the Layout27 Oct 2021Service Estimate Report26 Oct 2021

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded29 Jul 2024

DTCP licence

3 files
Licence Copy with Land Schedule26 Oct 2021Form LC -IV26 Oct 2021LOI26 Oct 2021

Land records

Land records

3 files
Revenue Record Entry of Licence and Collaboration26 Oct 2021Non Encumbrance Certificate26 Oct 2021Sale Deed26 Oct 2021

Sales papers

Allotment and sale agreements

1 file
List of Inventory26 Oct 2021

Money

Accounts and finance

3 files
Cash Flow Statement26 Oct 2021CA Certificate on the Application’s Figures26 Oct 2021Non-Default Certificate from a CA26 Oct 2021

The promoter’s papers

Declarations and affidavits

2 files
Bank Undertaking26 Oct 2021The Promoter’s Declaration on Affidavit26 Oct 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

67 OF 2021 · Whiteland Corporation Private Limited · GURGAON-MANESAR

Licence valid to 12 Sept 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Aug 2021 · read 15 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

67 OF 2021: 9 parcels, 2.65 acres in all, in Bagampur khatola (hadbast 101), tehsil Kadipur.

The licence register prints the same licensed area, 2.65 acres.

  • 51//22/22 marla
  • 51//23/27 kanal 9 marla
  • 51//24/12 kanal 17 marla
  • 53//2/21 kanal 16 marla
Show the other 5 parcels
  • 53//37 kanal 11 marla
  • 53//4/22 marla
  • 53//7/1/23 marla
  • 53//8/1/119 marla
  • 53//8/2/15 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bagampur khatola (hadbast 101), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 51//22/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan26 Oct 2021

Layout plan

1 file
Latest Layout Plan26 Oct 2021

Building plans

1 file
Approved Building Plans, Full Set26 Oct 2021

Among the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (28 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1678 · read 15 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Whiteland Corporation

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.