M3M BROADWAY

by Roisin Builders · Sector 71, Gurugram

Not on our price list yet

Possession 31 Oct 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 71, Gurugram1.9 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
about 563 sq ft
In m²about 52.3 m², the average flat, as declared
Registered
14 Dec 2018
Registered by
ROSHNI BUILDERS PVT. LTD.the company that filed it, for Roisin Builders
Timeline
  1. 14 Dec 2018Registered with HARERAHARERA, read 3 Nov 2026
  2. 31 Oct 2023Registration valid toHARERA, read 3 Nov 2026
  3. 31 Oct 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside7.849 acres in all, by use
  • Apartment buildings4.518 acres · 58%
  • Roads2.014 acres · 26%
  • Parks and playgrounds1.316 acres · 17%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningWater cooled DX for retail, chiller for cineplex/office, split/VRV for SER. APTS.
  • LiftsReputed make
  • WallsPainted surface
  • BathroomsLow FLOW CP fitting & chinaware
  • WindowsAluminum with glass
  • Main doorAluminum/flush door
  • Electrical fittingsISI marked
  • Water storageModular type/RCC tanks

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 71, GurugramSector 71, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)1.9 km
  • Delhi–Gurugram–SNB RRTS2.9 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is M3M BROADWAY registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/299/2018/31, registered on 14 Dec 2018. The register’s record shows an end date of 31 Oct 2023. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for M3M BROADWAY?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Oct 2025. Its registration runs to 31 Oct 2023; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around M3M BROADWAY?From the records · Map pin and road lines, read 6 Sep 2026

M3M BROADWAY is in Sector 71, Gurugram; the site address declared to HARERA is Village- Fazilpur Jharsa, Sector-71, Gurugram. In a straight line it is about 1.9 km from Sohna Elevated Corridor (NH-248A), 2.9 km from Delhi–Gurugram–SNB RRTS and 3.1 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building M3M BROADWAY?From the records · HARERA, read 3 Nov 2026

M3M BROADWAY is a Roisin Builders project, registered by its company ROSHNI BUILDERS PVT. LTD..

The source ↗Roisin Builders's projects and court record

The records

What the registers hold for M3M BROADWAY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/299/2018/31: Registration lapsed. The register’s record shows an end date of 31 Oct 2023.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 71 OF 2018 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 24 Oct 2023.DTCP, read 3 Nov 2026
The court record of Roisin Builders’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Oct 2023. HARERA Gurugram, read 3 Nov 2026. Source

  • Amber flag: Licence 71 OF 2018 validity ended

    Named in this project’s application. Valid to 24 Oct 2023. The register links a completion certificate (LC-IX), dated 13 Aug 2024, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 11 HARERA files, with the dates we read them
Registration no.
GGM/299/2018/31
Registration date
14 Dec 2018
Registration valid till
31 Oct 2023
Declared possession
31 Oct 2025

Declared by the promoter to HARERA

Land area
7.84875 (Acre) (31,762.76 sq m)
FAR
3.53 proposed of 3.53 permissible
licence
71 of 2018 dated 25.10.2018 (24.10.2023)
Estimated project cost
₹1000.00 crore
Cost of land
₹200.00 crore
Construction to start
1 Dec 2018
Completion declared for
31 Oct 2025
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 1,488 units · 77,809.24 sq m carpet · 1 tower · total for 1,488 flats, about 52.3 m² each
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (25 Oct 2018)
  • II. FOREST NOC — declared: already been obtained (4 Jul 2018)
  • III. AIRPORT HEIGHT — declared: already been obtained (12 Jul 2018)
  • IV. HUDA DRINKING WATER SUPPLY — declared: already been obtained (14 Sept 2018)
  • V. NCZ NOC — declared: already been obtained (11 Oct 2018)
  • VI. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (21 Nov 2018)
On file with HARERA · 11 files

On file with HARERA (11)

Plans

Site plan

1 file
Approved Site Plan19 Nov 2018

Layout plan

1 file
Latest Layout Plan7 Dec 2018

Zoning plan

1 file
Zoning Plan9 Nov 2018

Demarcation plan

1 file
Demarcation Plan19 Nov 2018

Building plans

1 file
Approved Building Plans, Full Set7 Dec 2018

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule20 Nov 2018

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration1 Dec 2018

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures20 Nov 2018Cash Flow Statement19 Nov 2018Non-Default Certificate from a CA12 Nov 2018

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit4 Dec 2018

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

71 OF 2018 · Roshni Builders Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 24 Oct 2023

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 7 Dec 2018 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

71 OF 2018: 16 parcels, 7.8486 acres in all, in Fazilpur jharsa (hadbast 99), tehsil Badshahpur.

The licence register prints the same licensed area, 7.8488 acres.

  • 43//15/11 kanal 2 marla
  • 43//15/26 kanal 7 marla
  • 43//16/17 kanal
  • 43//51 kanal 13 marla 7 sarsai
Show the other 12 parcels
  • 43//51 kanal
  • 43//63 kanal 13 marla
  • 43//61 kanal 19 marla
  • 44//14 kanal 9 marla
  • 44//10/13 kanal 4 marla
  • 44//10/24 kanal 16 marla
  • 44//11/14 kanal 12 marla
  • 44//11/23 kanal 8 marla
  • 44//12/14 kanal
  • 44//2/1 min1 kanal 14 marla
  • 44//20/15 kanal 18 marla
  • 44//98 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Fazilpur jharsa (hadbast 99), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 43//15/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,60,000 per sq yd

Sector 71, collector rates effective 1 Apr 2026, Badshahpur tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan19 Nov 2018

Layout plan

1 file
Latest Layout Plan7 Dec 2018

Building plans

1 file
Approved Building Plans, Full Set7 Dec 2018

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (11 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/276 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Roisin Builders

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.