INDEPENDENT FLOORS AT DLF CITY PHASE III
by DLF Luxury Homes · Sector 24, Gurugram
Not on our price list yet
Possession 31 Mar 2025 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 24, Gurugram3.2 km from Delhi–Gurugram–SNB RRTS, in a straight line
- Registered by
- DLF LUXURY HOMES LIMITEDthe company that filed it, for DLF Luxury Homes
- 24 Nov 2020Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Mar 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings0.915 acres · 100%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenWhite WASH / OBD
- Kitchen appliancesModular cabinets
- LiftsBranded make
- WardrobesModular wardrobes of standard make in bedrooms (except in S. room)
- FloorsIPS flooring / tiles / marble / granite
- WallsWhite WASH / OBD
- WindowsSingle glass unit with clear glass UPVC frames and shutters in habitable rooms. frosted glass in toilets
- Main doorFlush door
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS3.2 km
- Dwarka ExpresswayOpen, 17 Aug 20254.6 km
- Sohna Elevated Corridor (NH-248A)8.6 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 2
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| DLF Utilities | Same sector | — | — | 31 Oct 2024 | |
| DLF | Same sector | — | — | 31 Dec 2024 | |
| DLF Home Developers | Same sector | — | — | 31 Oct 2024 | |
M3M JEWELNo photo on file yet | Lekh Buildtech | 1.9 kmto its sector’s point | — | — | 31 Mar 2026 |
No photo of the project on file yet | Silverglades | 2.9 kmto its sector’s point | — | — | 11 Oct 2025 |
ANANTA VILASA 2.0No photo on file yet | Mnb Build Fab | 2.9 kmto its sector’s point | — | — | 31 May 2032 |
LODHA GOLF COURSE ROADNo photo on file yet | Lodha Developers | 2.9 kmto its sector’s point | — | — | 30 Nov 2032 |
VALENCIANo photo on file yet | Ab Realty | 3.0 kmto its sector’s point | — | — | 14 Jul 2026 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is INDEPENDENT FLOORS AT DLF CITY PHASE III registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/441/173/2021/08(A). Ended 31 Mar 2025. The register shows it as: Registration expired.
The source ↗What is the possession timeline for INDEPENDENT FLOORS AT DLF CITY PHASE III?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Mar 2025. Its registration runs to 31 Mar 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around INDEPENDENT FLOORS AT DLF CITY PHASE III?From the records · Map pin and road lines, read 6 Sep 2026
INDEPENDENT FLOORS AT DLF CITY PHASE III is in Sector 24, Gurugram; the site address declared to HARERA is Dlf City Phase-Iii, Sector 24, Gurugram, Haryana. In a straight line it is about 3.2 km from Delhi–Gurugram–SNB RRTS, 4.6 km from Dwarka Expressway and 8.6 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building INDEPENDENT FLOORS AT DLF CITY PHASE III?From the records · HARERA, read 4 Nov 2026
INDEPENDENT FLOORS AT DLF CITY PHASE III is a DLF Luxury Homes project, registered by its company DLF LUXURY HOMES LIMITED.
The source ↗DLF Luxury Homes's projects and court recordThe records
What the registers hold for INDEPENDENT FLOORS AT DLF CITY PHASE III: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/441/173/2021/08(A): Registration expired. Ended 31 Mar 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: layout plan 24 Nov 2020, building plans 24 Nov 2020.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 31 Mar 2025. HARERA Gurugram, read 4 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 15 HARERA files, with the dates we read them
- Registration no.
- GGM/441/173/2021/08(A)
- Registration valid till
- 31 Mar 2025
- Declared possession
- 31 Mar 2025
Declared by the promoter to HARERA
- Land area
- 0.915 (Acre) (3,702.87 sq m)
- FAR
- 2.64 proposed
- licence
- -
- Estimated project cost
- ₹120.29 crore
- Cost of land
- ₹65.42 crore
- Layout plan, declared approved (field 5a)
- 24 Nov 2020
- Building plans, declared approved
- 24 Nov 2020
- Construction to start
- 1 Apr 2021
- Completion declared for
- 31 Mar 2025
Declared inventory · 13 types
Declared inventory — 13 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 4 units · 203.08 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 130.81 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 203.08 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 139.54 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 139.54 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 139.54 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 139.54 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 139.54 sq m carpet · 1 tower
Statutory approvals, as declared · 4
Statutory approvals, as declared
- I. BUILDING PLAN — declared: already been obtained (24 Nov 2020)
- II. DEVELOPMENT AGREEMENT — declared: already been obtained (3 Feb 2021)
- III. SALE DEED — declared: already been obtained (9 Aug 1984)
- IV. PARTNERSHIP DEED — declared: already been obtained (29 Jul 1998)
On file with HARERA · 15 files
On file with HARERA (15)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
3 filesDTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared -. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Feb 2021 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Lenders that list this project
PNB Housing Finance’s approved-projects list carries “Independent Floors at DLF City Phase III”, by DLF Luxury Homes Limited, code Gurgaon-0624-005038, approved 2024.
PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗
A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (15 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1546 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on DLF Luxury Homes
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.