Skip to content

MOULSARI ENCLAVE

by DLF Home Developers · Sector 24, Gurugram

Not on our price list yet

Possession 31 Oct 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 24, Gurugram3.2 km from Delhi–Gurugram–SNB RRTS, in a straight line
Registered
15 Oct 2020
Registered by
DLF HOME DEVELOPERS LIMITEDthe company that filed it, for DLF Home Developers
Timeline
  1. 19 Mar 2020Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 15 Oct 2020Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Oct 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1.035 acres in all, by use
  • Apartment buildings1.035 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenWhite WASH / OBD
  • Kitchen appliancesModular cabinets
  • LiftsBranded make
  • WardrobesModular wardrobes of standard make in bedrooms (except in S. room
  • FloorsIPS flooring / tiles / marble / granite
  • WallsWhite WASH / OBD
  • WindowsSingle glass unit with clear glass UPVC frames and shutters in habitable rooms. frosted glass in toilets
  • Main doorFlush door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 24, GurugramSector 24, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS3.2 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.6 km
  • Sohna Elevated Corridor (NH-248A)8.6 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 7
  • Registered, no OC or CC yet: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is MOULSARI ENCLAVE registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/417/149/2020/33, registered on 15 Oct 2020. Ended 31 Oct 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for MOULSARI ENCLAVE?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Oct 2024. Its registration runs to 31 Oct 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around MOULSARI ENCLAVE?From the records · Map pin and road lines, read 6 Sep 2026

MOULSARI ENCLAVE is in Sector 24, Gurugram; the site address declared to HARERA is Dlf City Phase-Iii, Sector 24, Gurugram, Haryana. In a straight line it is about 3.2 km from Delhi–Gurugram–SNB RRTS, 4.6 km from Dwarka Expressway and 8.6 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building MOULSARI ENCLAVE?From the records · HARERA, read 4 Nov 2026

MOULSARI ENCLAVE is a DLF Home Developers project, registered by its company DLF HOME DEVELOPERS LIMITED.

The source ↗DLF Home Developers's projects and court record

The records

What the registers hold for MOULSARI ENCLAVE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/417/149/2020/33: Registration expired. Ended 31 Oct 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 19 Mar 2020, building plans 19 Mar 2020.Declared to HARERA, read 29 Oct 2026
The court record of DLF Home Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Oct 2024. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 18 HARERA files, with the dates we read them
Registration no.
GGM/417/149/2020/33
Registration date
15 Oct 2020
Registration valid till
31 Oct 2024
Declared possession
31 Oct 2024

Declared by the promoter to HARERA

Land area
1.035 (Acre) (4,188.5 sq m)
FAR
2.4 proposed
licence
-
Estimated project cost
₹96.73 crore
Cost of land
₹52.50 crore
Layout plan, declared approved (field 5a)
19 Mar 2020
Building plans, declared approved
19 Mar 2020
Construction to start
1 Nov 2020
Completion declared for
31 Oct 2024
Declared inventory · 10 types

Declared inventory — 10 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 4 units · 812.34 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.34 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.34 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.34 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.34 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.34 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.34 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 804.91 sq m carpet · 1 tower
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. BUILDING PLAN — declared: already been obtained (19 Mar 2020)
On file with HARERA · 18 files

On file with HARERA (18)

Plans

Site plan

1 file
Approved Site Plan6 Oct 2020

Layout plan

1 file
Latest Layout Plan6 Oct 2020

Zoning plan

1 file
Zoning Plan6 Oct 2020

Demarcation plan

1 file
Demarcation Plan6 Oct 2020

Building plans

4 files
Building Plan and Approval Letter16 Oct 2020Building Plan 216 Oct 2020Building Plan 116 Oct 2020Approved Building Plans, Full Set6 Oct 2020

Services

Service plans

1 file
Service Plans on the Layout6 Oct 2020

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded4 Aug 2023

DTCP licence

1 file
Licence Copy with Land Schedule6 Oct 2020

Land records

Land records

3 files
Development Agreement-1 Plot16 Oct 2020Development Agreement-9 Plots16 Oct 2020Revenue Record Entry of Licence and Collaboration6 Oct 2020

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures6 Oct 2020Cash Flow Statement6 Oct 2020Non-Default Certificate from a CA6 Oct 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit6 Oct 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared -. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Oct 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan6 Oct 2020

Layout plan

1 file
Latest Layout Plan6 Oct 2020

Building plans

4 files
Building Plan and Approval Letter16 Oct 2020Building Plan 216 Oct 2020Building Plan 116 Oct 2020Approved Building Plans, Full Set6 Oct 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (18 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1460 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on DLF Home Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.