Siris Estate
by DLF Utilities · Sector 24, Gurugram
Not on our price list yet
Possession 31 Oct 2024 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 24, Gurugram3.2 km from Delhi–Gurugram–SNB RRTS, in a straight line
- Registered by
- DLF UTILITIES LIMITEDthe company that filed it, for DLF Utilities
- 6 Oct 2020Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 16 Oct 2020Registered with HARERAHARERA, read 3 Nov 2026
- 5 Oct 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Oct 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings1.243 acres · 100%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenWhite WASH / OBD
- Kitchen appliancesModular cabinets
- LiftsBranded make
- WardrobesModular wardrobes of standard make in bedrooms (except in S. room)
- FloorsIPS flooring / tiles / marble / granite
- WallsWhite WASH / OBD
- WindowsSingle glass unit with clear glass UPVC frames and shutters in habitable rooms. frosted glass in toilets
- Main doorFlush door
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS3.2 km
- Dwarka ExpresswayOpen, 17 Aug 20254.6 km
- Sohna Elevated Corridor (NH-248A)8.6 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 4
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| DLF | Same sector | — | — | 31 Dec 2024 | |
| DLF Luxury Homes | Same sector | — | — | 31 Mar 2025 | |
| DLF Home Developers | Same sector | — | — | 31 Oct 2024 | |
M3M JEWELNo photo on file yet | Lekh Buildtech | 1.9 kmto its sector’s point | — | — | 31 Mar 2026 |
No photo of the project on file yet | Silverglades | 2.9 kmto its sector’s point | — | — | 11 Oct 2025 |
ANANTA VILASA 2.0No photo on file yet | Mnb Build Fab | 2.9 kmto its sector’s point | — | — | 31 May 2032 |
LODHA GOLF COURSE ROADNo photo on file yet | Lodha Developers | 2.9 kmto its sector’s point | — | — | 30 Nov 2032 |
VALENCIANo photo on file yet | Ab Realty | 3.0 kmto its sector’s point | — | — | 14 Jul 2026 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is Siris Estate registered with HARERA?From the records · HARERA, read 3 Nov 2026
HARERA lists it as GGM/421/153/2020/37, registered on 16 Oct 2020. Ended 31 Oct 2024. The register shows it as: Registration expired.
The source ↗What is the possession timeline for Siris Estate?From the records · HARERA, read 3 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Oct 2024. Its registration runs to 31 Oct 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Siris Estate?From the records · Map pin and road lines, read 6 Sep 2026
Siris Estate is in Sector 24, Gurugram; the site address declared to HARERA is Dlf City Phase Iii Sector 24, Gurugram Haryana. In a straight line it is about 3.2 km from Delhi–Gurugram–SNB RRTS, 4.6 km from Dwarka Expressway and 8.6 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Siris Estate?From the records · HARERA, read 3 Nov 2026
Siris Estate is a DLF Utilities project, registered by its company DLF UTILITIES LIMITED.
The source ↗DLF Utilities's projects and court recordThe records
What the registers hold for Siris Estate: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/421/153/2020/37: Registration expired. Ended 31 Oct 2024.HARERA, read 3 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: layout plan 6 Oct 2020, building plans 5 Oct 2022.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 31 Oct 2024. HARERA Gurugram, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 16 HARERA files, with the dates we read them
- Registration no.
- GGM/421/153/2020/37
- Registration date
- 16 Oct 2020
- Registration valid till
- 31 Oct 2024
- Declared possession
- 31 Oct 2024
Declared by the promoter to HARERA
- Land area
- 1.243 (Acre) (5,030.24 sq m)
- FAR
- 2.4 proposed
- licence
- -
- Estimated project cost
- ₹117.34 crore
- Cost of land
- ₹63.07 crore
- Layout plan, declared approved (field 5a)
- 6 Oct 2020
- Building plans, declared approved
- 5 Oct 2022
- Construction to start
- 1 Nov 2020
- Completion declared for
- 31 Oct 2024
Declared inventory · 12 types
Declared inventory — 12 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 4 units · 812.34 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 812.34 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 812.32 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 812.32 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 812.32 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 812.32 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 812.32 sq m carpet · 1 tower
- Apartment/Shops/Other Buildings · 4 units · 812.32 sq m carpet · 1 tower
Statutory approvals, as declared · 1
Statutory approvals, as declared
- I. BUILDING PLAN — declared: already been obtained
On file with HARERA · 16 files
On file with HARERA (16)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileDTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileOther filings
Other filings
3 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared -. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 12 Oct 2020 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (16 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1464 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on DLF Utilities
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.
