Skip to content

Siris Estate

by DLF Utilities · Sector 24, Gurugram

Not on our price list yet

Possession 31 Oct 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 24, Gurugram3.2 km from Delhi–Gurugram–SNB RRTS, in a straight line
Registered
16 Oct 2020
Registered by
DLF UTILITIES LIMITEDthe company that filed it, for DLF Utilities
Timeline
  1. 6 Oct 2020Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 16 Oct 2020Registered with HARERAHARERA, read 3 Nov 2026
  3. 5 Oct 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
  4. 31 Oct 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1.243 acres in all, by use
  • Apartment buildings1.243 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenWhite WASH / OBD
  • Kitchen appliancesModular cabinets
  • LiftsBranded make
  • WardrobesModular wardrobes of standard make in bedrooms (except in S. room)
  • FloorsIPS flooring / tiles / marble / granite
  • WallsWhite WASH / OBD
  • WindowsSingle glass unit with clear glass UPVC frames and shutters in habitable rooms. frosted glass in toilets
  • Main doorFlush door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 24, GurugramSector 24, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS3.2 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.6 km
  • Sohna Elevated Corridor (NH-248A)8.6 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Siris Estate registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/421/153/2020/37, registered on 16 Oct 2020. Ended 31 Oct 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Siris Estate?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Oct 2024. Its registration runs to 31 Oct 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Siris Estate?From the records · Map pin and road lines, read 6 Sep 2026

Siris Estate is in Sector 24, Gurugram; the site address declared to HARERA is Dlf City Phase Iii Sector 24, Gurugram Haryana. In a straight line it is about 3.2 km from Delhi–Gurugram–SNB RRTS, 4.6 km from Dwarka Expressway and 8.6 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Siris Estate?From the records · HARERA, read 3 Nov 2026

Siris Estate is a DLF Utilities project, registered by its company DLF UTILITIES LIMITED.

The source ↗DLF Utilities's projects and court record

The records

What the registers hold for Siris Estate: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/421/153/2020/37: Registration expired. Ended 31 Oct 2024.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 6 Oct 2020, building plans 5 Oct 2022.Declared to HARERA, read 29 Oct 2026
The court record of DLF Utilities’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Oct 2024. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 16 HARERA files, with the dates we read them
Registration no.
GGM/421/153/2020/37
Registration date
16 Oct 2020
Registration valid till
31 Oct 2024
Declared possession
31 Oct 2024

Declared by the promoter to HARERA

Land area
1.243 (Acre) (5,030.24 sq m)
FAR
2.4 proposed
licence
-
Estimated project cost
₹117.34 crore
Cost of land
₹63.07 crore
Layout plan, declared approved (field 5a)
6 Oct 2020
Building plans, declared approved
5 Oct 2022
Construction to start
1 Nov 2020
Completion declared for
31 Oct 2024
Declared inventory · 12 types

Declared inventory — 12 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 4 units · 812.34 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.34 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.32 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.32 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.32 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.32 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.32 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 812.32 sq m carpet · 1 tower
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. BUILDING PLAN — declared: already been obtained
On file with HARERA · 16 files

On file with HARERA (16)

Plans

Site plan

1 file
Approved Site Plan11 Oct 2020

Layout plan

1 file
Latest Layout Plan11 Oct 2020

Zoning plan

1 file
Zoning Plan11 Oct 2020

Demarcation plan

1 file
Demarcation Plan11 Oct 2020

Building plans

1 file
Approved Building Plans, Full Set11 Oct 2020

Services

Service plans

1 file
Service Plans on the Layout11 Oct 2020

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded4 Aug 2023

DTCP licence

1 file
Licence Copy with Land Schedule11 Oct 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration11 Oct 2020

Money

Accounts and finance

3 files
Cash Flow Statement11 Oct 2020CA Certificate on the Application’s Figures11 Oct 2020Non-Default Certificate from a CA11 Oct 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit12 Oct 2020

Other filings

Other filings

3 files
Dev. Agr and Poa (5 Plots)23 Oct 2020Dev. Agr and Poa (1 Plot)23 Oct 2020Dev. Agr and Poa (6 Plots)23 Oct 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared -. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 12 Oct 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan11 Oct 2020

Layout plan

1 file
Latest Layout Plan11 Oct 2020

Building plans

1 file
Approved Building Plans, Full Set11 Oct 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (16 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1464 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on DLF Utilities

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.