Skip to content

INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE PHASE 2

by DLF · Sector 93, Gurugram

Not on our price list yet

Possession 31 Oct 2028 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 93, Gurugram3.1 km from Dwarka Expressway, in a straight line
Carpet area
744–862 sq ft
In m²about 69–80 m², as declared
Registered by
DLF LIMITEDthe company that filed it, for DLF
Timeline
  1. 30 Oct 2028Registration valid toHARERA, read 3 Nov 2026
  2. 31 Oct 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

544homes, 744 to 862 sq ft of carpet area
  • Under 1,000 sq ft744–862 sq ft544

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside20,277 m² in all, by use
  • Apartment buildings20,277 m² · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningLiving, dining & bedrooms
  • KitchenWhite WASH / OBD
  • LiftsBranded make
  • FloorsIPS flooring / tiles / granite
  • WallsWhite WASH / OBD
  • WindowsSingle glass unit with clear glass UPVC/AL frames and shutters inhabitable rooms. clear/frosted glass in toilets
  • Main doorFlush door
  • Electrical fittingsModular fittings

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 93, GurugramSector 93, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km
  • Delhi–Gurugram–SNB RRTS4.8 km
  • Sohna Elevated Corridor (NH-248A)10.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 30 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 18
  • Registered, no OC or CC yet: 12

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE PHASE 2 registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/657/389/2023/01. Valid to 30 Oct 2028.

The source ↗
What is the possession timeline for INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE PHASE 2?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Oct 2028. Its registration runs to 30 Oct 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE PHASE 2?From the records · Map pin and road lines, read 6 Sep 2026

INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE PHASE 2 is in Sector 93, Gurugram; the site address declared to HARERA is Sector 93. In a straight line it is about 3.1 km from Dwarka Expressway, 4.8 km from Delhi–Gurugram–SNB RRTS and 10.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE PHASE 2?From the records · HARERA, read 3 Nov 2026

INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE PHASE 2 is a DLF project, registered by its company DLF LIMITED.

The source ↗DLF's projects and court record

The records

What the registers hold for INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE PHASE 2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/657/389/2023/01: Registered. Valid to 30 Oct 2028.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 94 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 11 Nov 2026.DTCP, read 3 Nov 2026
The court record of DLF’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Licence 94 OF 2021 ends soon

    Named in this project’s application. Valid to 11 Nov 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 13 HARERA files, with the dates we read them
Registration no.
GGM/657/389/2023/01
Registration valid till
30 Oct 2028
Declared possession
31 Oct 2028

Declared by the promoter to HARERA

Land area
20277 (Sqr/mtrs)
FAR
2.64 proposed of 2.64 permissible
licence
94 of 2021 Dated 12.11.2021
Estimated project cost
₹495.68 crore
Cost of land
₹89.62 crore
Construction to start
1 Oct 2023
Completion declared for
31 Oct 2028
Declared inventory · 6 types

Declared inventory

  • Apartment/Shops/Other Buildings · 496 units · 80.042 sq m carpet · 124 towers · one flat
  • Apartment/Shops/Other Buildings · 28 units · 69.089 sq m carpet · 7 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 77.271 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 79.794 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 8 units · 80.038 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 80.042 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. SERVICE PLAN ESTIMATES — declared: already been obtained (24 Jan 2022)
  • II. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (22 Oct 2021)
  • III. STORM WATER DRAINAGE — declared: already been obtained (28 Dec 2021)
  • IV. SEWAGE DISPOSAL — declared: already been obtained (29 Dec 2021)
  • V. WATER SUPPLY — declared: already been obtained (19 Oct 2021)
  • VI. LAYOUT PLAN — declared: already been obtained (21 Feb 2022)
  • VII. ENVIRONMENT CLEARANCE — declared: already been obtained (28 Apr 2022)
  • VIII. LICENSE — declared: already been obtained (12 Nov 2021)
On file with HARERA · 13 files

On file with HARERA (13)

Plans

Site plan

1 file
Approved Site Plan16 Dec 2022

Layout plan

1 file
Latest Layout Plan16 Dec 2022

Zoning plan

1 file
Zoning Plan16 Dec 2022

Demarcation plan

1 file
Demarcation Plan16 Dec 2022

Building plans

2 files
Approved Building Plans, Full Set20 Dec 2022Building Plan Typical (7.5 X 20, 150SQ. Mtr)20 Dec 2022

Services

Service plans

1 file
Service Plans on the Layout16 Dec 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule16 Dec 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration16 Dec 2022

Money

Accounts and finance

3 files
Cash Flow Statement20 Dec 2022CA Certificate on the Application’s Figures20 Dec 2022Non-Default Certificate from a CA20 Dec 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit16 Dec 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

94 OF 2021 · DLF Ltd. · GURGAON-MANESAR

Licence valid to 11 Nov 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 21 Dec 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

94 OF 2021: 43 parcels, 26.9187 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.

The licence register prints the same licensed area, 26.9138 acres.

  • 33//13/26 kanal 18 marla
  • 33//14/1/2min2 kanal 1 marla
  • 33//187 kanal 15 marla
  • 33//185 marla
Show the other 39 parcels
  • 33//198 kanal
  • 33//208 kanal
  • 33//217 kanal 7 marla
  • 33//227 kanal 7 marla
  • 34//16/27 kanal 10 marla
  • 34//17/26 kanal 5 marla
  • 34//18/1/1/22 kanal 17 marla
  • 34//19/1/22 marla
  • 34//19/2/21 kanal 14 marla
  • 34//20/2/22 marla
  • 34//21/26 kanal 16 marla
  • 34//227 kanal 7 marla
  • 37//13/21 kanal 15 marla
  • 37//14/14 kanal
  • 37//158 kanal
  • 37//168 kanal
  • 37//177 kanal
  • 37//171 kanal
  • 37//188 kanal
  • 37//19/12 marla
  • 37//19/27 kanal 18 marla
  • 37//20/13 kanal 10 marla
  • 37//24/11 kanal 13 marla
  • 37//25/11 kanal 13 marla
  • 37//5/21 kanal 13 marla
  • 37//68 kanal
  • 38//128 kanal
  • 38//13/17 kanal 12 marla
  • 38//14/54 marla
  • 38//188 kanal
  • 38//198 kanal
  • 38//27 kanal 10 marla
  • 38//25 marla
  • 38//20/15 kanal 7 marla
  • 38//20/22 kanal 13 marla
  • 38//21/11 kanal 12 marla
  • 38//38 kanal
  • 38//87 kanal 18 marla
  • 38//97 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Hayatpur (hadbast 114), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 33//13/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan16 Dec 2022

Layout plan

1 file
Latest Layout Plan16 Dec 2022

Building plans

2 files
Approved Building Plans, Full Set20 Dec 2022Building Plan Typical (7.5 X 20, 150SQ. Mtr)20 Dec 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (13 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2231 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on DLF

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.