Project Area 3.15 Acres Commercial Colony

by Ameya Commercial Projects · Sector 93, Gurugram

Not on our price list yet

Possession 27 Jun 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 93, Gurugram3.1 km from Dwarka Expressway, in a straight linePrices and what changed
Registered
28 Aug 2017
Registered by
AMEYA COMMERCIAL PROJECTS PVT. LTD.the company that filed it, for Ameya Commercial Projects
Timeline
  1. 28 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 27 Jun 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 27 Aug 2024Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside12,748 m² in all, by use
  • Apartment buildings5,081 m² · 40%
  • Roads2,731 m² · 21%
  • Parking1,835 m² · 14%
  • Pavements1,280 m² · 10%
  • Green belts985 m² · 8%
  • Parks and playgrounds835 m² · 7%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 93, GurugramSector 93, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km
  • Delhi–Gurugram–SNB RRTS4.8 km
  • Sohna Elevated Corridor (NH-248A)10.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Project Area 3.15 Acres Commercial Colony registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 153 0F 2017, registered on 28 Aug 2017. The register’s record shows an end date of 27 Aug 2024. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for Project Area 3.15 Acres Commercial Colony?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 27 Jun 2024. Its registration runs to 27 Aug 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Project Area 3.15 Acres Commercial Colony?From the records · Map pin and road lines, read 6 Sep 2026

Project Area 3.15 Acres Commercial Colony is in Sector 93, Gurugram; the site address declared to HARERA is Sapphire93 , Sector 93 Gurgaon. In a straight line it is about 3.1 km from Dwarka Expressway, 4.8 km from Delhi–Gurugram–SNB RRTS and 10.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Project Area 3.15 Acres Commercial Colony?From the records · HARERA, read 4 Nov 2026

Project Area 3.15 Acres Commercial Colony is a Ameya Commercial Projects project, registered by its company AMEYA COMMERCIAL PROJECTS PVT. LTD..

The source ↗Ameya Commercial Projects's projects and court record

The records

What the registers hold for Project Area 3.15 Acres Commercial Colony: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 153 0F 2017: Registration lapsed. The register’s record shows an end date of 27 Aug 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 57 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 19 Jun 2019.DTCP, read 3 Nov 2026
The court record of Ameya Commercial Projects’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 57 OF 2014 lapsed

    Named in this project’s application. Valid to 19 Jun 2019; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 27 Aug 2024. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 13 HARERA files, with the dates we read them
Registration no.
153 0F 2017
Registration date
28 Aug 2017
Registration valid till
27 Aug 2024
Declared possession
27 Jun 2024

Declared by the promoter to HARERA

Land area
3.15 (Acre) (12,747.6 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
57 OF 2014
Estimated project cost
₹173.57 crore
Cost of land
₹19.93 crore
Completion declared for
27 Jun 2024
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type · 551 units
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. ASSURANCE OF DRINKING WATER — declared: already been obtained (29 Jun 2016)
  • II. NOC FOR CONSTRUCTION PURPOSE — declared: already been obtained (26 Sept 2014)
  • III. ASSURANCE OF ELECTRICITY CONNECTION — declared: already been obtained (21 Oct 2014)
  • IV. ASSURANCE OF EXTERNAL SERVICES — declared: already been obtained (20 Dec 2014)
  • V. FOREST NOC — declared: already been obtained (17 Dec 2014)
  • VI. ARAVALI NOC — declared: already been obtained (13 Feb 2015)
  • VII. AAI — declared: already been obtained (11 Mar 2015)
On file with HARERA · 13 files

On file with HARERA (13)

Plans

Site plan

2 files
Site Plan9 Mar 2021Approved Site Plan12 Dec 2019

Layout plan

1 file
Latest Layout Plan9 Mar 2021

Zoning plan

1 file
Zoning Plan9 Mar 2021

Demarcation plan

1 file
Demarcation Plan9 Mar 2021

Building plans

2 files
Building Plan Approval9 Mar 2021Approved Building Plans, Full Set12 Dec 2019

Floor plans

1 file
Annexure-Details of the Plots/apartments in the Project10 Mar 2021

Services

Service plans

1 file
Service Plans on the Layout9 Mar 2021

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule9 Mar 2021

Money

Accounts and finance

2 files
CA Certificate on the Application’s Figures9 Mar 2021Non-Default Certificate from a CA9 Mar 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit9 Mar 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

57 OF 2014 · Ameya Commercial Projects Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 19 Jun 2019

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 12 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

57 OF 2014: 12 parcels, 3.15 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.

The licence register prints the same licensed area, 3.15 acres.

  • 41//15/1/16 kanal 17 marla
  • 41//5/3/213 marla
  • 41//6/1/23 kanal 3 marla
  • 41//6/23 kanal 14 marla
Show the other 8 parcels
  • 41//7/1/1/1/11 marla
  • 41//7/1/1/1/213 marla
  • 41//7/1/1/21 kanal 17 marla
  • 50//10/34 marla
  • 50//10/32 kanal
  • 50//11/2/1/13 kanal 2 marla
  • 50//12/1/11 kanal
  • 50//9/1/12 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Hayatpur (hadbast 114), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 41//15/1/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,04,750 per sq yd

Sector 93, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan9 Mar 2021Approved Site Plan12 Dec 2019

Layout plan

1 file
Latest Layout Plan9 Mar 2021

Building plans

2 files
Building Plan Approval9 Mar 2021Approved Building Plans, Full Set12 Dec 2019

Floor plans

1 file
Annexure-Details of the Plots/apartments in the Project10 Mar 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (13 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1080 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ameya Commercial Projects

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.