ROF INSIGNIA SOUK

by Diverse Developers · Sector 93, Gurugram

Not on our price list yet

Possession 31 Mar 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 93, Gurugram3.1 km from Dwarka Expressway, in a straight line
Registered by
DIVERSE DEVELOPERS LLPthe company that filed it, for Diverse Developers
Timeline
  1. 6 Sep 2021Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Mar 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside8,673 m² in all, by use
  • Plots for sale3,035 m² · 35%
  • Pavements2,175 m² · 25%
  • Parking1,175 m² · 14%
  • Roads1,079 m² · 12%
  • Electricity sub-station615 m² · 7%
  • Green belts594 m² · 7%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 93, GurugramSector 93, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km
  • Delhi–Gurugram–SNB RRTS4.8 km
  • Sohna Elevated Corridor (NH-248A)10.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 3

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is ROF INSIGNIA SOUK registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/492/224/2021/60. The register’s record shows an end date of 31 Mar 2026. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for ROF INSIGNIA SOUK?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2026. Its registration runs to 31 Mar 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ROF INSIGNIA SOUK?From the records · Map pin and road lines, read 6 Sep 2026

ROF INSIGNIA SOUK is in Sector 93, Gurugram; the site address declared to HARERA is Sector-93, Badha. In a straight line it is about 3.1 km from Dwarka Expressway, 4.8 km from Delhi–Gurugram–SNB RRTS and 10.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ROF INSIGNIA SOUK?From the records · HARERA, read 4 Nov 2026

ROF INSIGNIA SOUK is a Diverse Developers project, registered by its company DIVERSE DEVELOPERS LLP.

The source ↗Diverse Developers's projects and court record

The records

What the registers hold for ROF INSIGNIA SOUK: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/492/224/2021/60: Registration lapsed. The register’s record shows an end date of 31 Mar 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 64 OF 2021 is on the DTCP register: Licence lapsed; the register prints its validity to 3 Sep 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 6 Sep 2021, building plans 6 Sep 2021.Declared to HARERA, read 29 Oct 2026
The court record of Diverse Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 64 OF 2021 lapsed

    Named in this project’s application. Valid to 3 Sep 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Mar 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 21 HARERA files, with the dates we read them
Registration no.
GGM/492/224/2021/60
Registration valid till
31 Mar 2026
Declared possession
31 Mar 2026

Declared by the promoter to HARERA

Land area
2.14305 (Acre) (8,672.62 sq m)
FAR
1.5 proposed of 1.5 permissible
licence
64 of 2021 dated 04/09/2021
Estimated project cost
₹42.12 crore
Cost of land
₹24.38 crore
Layout plan, declared approved (field 5a)
6 Sept 2021
Building plans, declared approved
6 Sept 2021
Construction to start
15 Oct 2021
Completion declared for
31 Mar 2026
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. FOREST NOC — declared: already been obtained (22 Jul 2021)
  • II. ASSURANCE FOR SEWERAGE CONNECTION — declared: already been obtained (16 Aug 2021)
  • III. ASSURANCE FOR WATER SUPPLY — declared: already been obtained (20 Aug 2021)
  • IV. ARAVALLI NOC — declared: already been obtained (6 Sept 2021)
  • V. LICENCE — declared: already been obtained (4 Sept 2021)
  • VI. LAYOUT — declared: already been obtained (6 Sept 2021)
On file with HARERA · 21 files

On file with HARERA (21)

Plans

Site plan

3 files
Electrical Layout Site Plan5 Oct 2021Sewerage Layout Site Plan5 Oct 2021Approved Site Plan7 Sept 2021

Layout plan

2 files
Latest Layout Plan5 Oct 2021Coordinated Layout5 Oct 2021

Zoning plan

1 file
Zoning Plan7 Sept 2021

Demarcation plan

2 files
Demarcation Plan5 Oct 2021Super Imposed Demarcation PLAN15 Oct 2021

Services

Sewerage and drainage

2 files
Storm Water Mep Layout5 Oct 2021Storm Water Layout Plan5 Oct 2021

Water supply

1 file
Water Supply Plan5 Oct 2021

Electricity

1 file
Street Light Plan5 Oct 2021

Roads

1 file
Landscape & Road & Pavement Plan- SCO 935 Oct 2021

Service plans

1 file
Service Plans on the Layout7 Sept 2021

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule5 Oct 2021

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration5 Oct 2021Non-Encumbrance 93 Commercial5 Oct 2021

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures5 Oct 2021Cash Flow Statement5 Oct 2021Non-Default Certificate from a CA5 Oct 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit5 Oct 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

64 OF 2021 · DIVERSE DEVELOPERS LLP · GURGAON-MANESAR

Licence valid to 3 Sept 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 7 Sept 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

64 OF 2021: 7 parcels, 2.1431 acres in all, in Badha (hadbast 113), tehsil Manesar.

The licence register prints the same licensed area, 2.1431 acres.

  • 4//18/1/22 kanal 2 marla
  • 4//18/21 kanal
  • 4//19min7 kanal 13 marla 7 sarsai
  • 4//20/1min17 marla 1 sarsai
Show the other 3 parcels
  • 4//22/14 kanal 8 marla
  • 4//23/1/29 marla
  • 4//23/2/113 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 4//18/1/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Electrical Layout Site Plan5 Oct 2021Sewerage Layout Site Plan5 Oct 2021Approved Site Plan7 Sept 2021

Layout plan

2 files
Latest Layout Plan5 Oct 2021Coordinated Layout5 Oct 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (21 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1651 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Diverse Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.