THE ESPLANADE MALL

by Dhoot Infrastructure Projects · Sector 37C, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 37C, Gurugram2.5 km from Dwarka Expressway, in a straight line
Registered by
DHOOT INFRASTRUCTURE PROJECTS LIMITEDthe company that filed it, for Dhoot Infrastructure Projects
Timeline
  1. 1 Oct 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 11 Aug 2022Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside16,187 m² in all, by use
  • Apartment buildings6,380 m² · 39%
  • Roads3,394 m² · 21%
  • Land for community services, handed to the government2,687 m² · 17%
  • Parks and playgrounds1,307 m² · 8%
  • Parking1,050 m² · 6%
  • Pavements635 m² · 4%
  • Green belts600 m² · 4%
  • Electricity sub-station135 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningCentralized AC
  • Lifts4 lifts 3B + G+13, 3 lift 3B + G+ 3, 1 lift G+1 goods lift G+1, escalator - 12
  • FloorsTiling/stone
  • WallsPlaster paint
  • BathroomsCP / chinaware
  • WindowsGlass
  • Main doorGlass door / wooden door
  • Electrical fittingsLED lights

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 37C, GurugramSector 37C, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20252.5 km
  • Delhi–Gurugram–SNB RRTS2.6 km
  • Sohna Elevated Corridor (NH-248A)4.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is THE ESPLANADE MALL registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/578/310/2022/53. Ended 11 Aug 2022. The register shows it as: Registration expired.

The source ↗
How is the connectivity around THE ESPLANADE MALL?From the records · Map pin and road lines, read 6 Sep 2026

THE ESPLANADE MALL is in Sector 37C, Gurugram; the site address declared to HARERA is Sector 37c. In a straight line it is about 2.5 km from Dwarka Expressway, 2.6 km from Delhi–Gurugram–SNB RRTS and 4.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building THE ESPLANADE MALL?From the records · HARERA, read 4 Nov 2026

THE ESPLANADE MALL is a Dhoot Infrastructure Projects project, registered by its company DHOOT INFRASTRUCTURE PROJECTS LIMITED.

The source ↗Dhoot Infrastructure Projects's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for THE ESPLANADE MALL: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/578/310/2022/53: Registration expired. Ended 11 Aug 2022.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 160 OF 2008 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 12 Aug 2020.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 1 Oct 2019, building plans 1 Oct 2019.Declared to HARERA, read 29 Oct 2026
The court record of Dhoot Infrastructure Projects’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 11 Aug 2022. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 160 OF 2008 validity ended

    Named in this project’s application. Valid to 12 Aug 2020. The register links a completion certificate (LC-IX), dated 9 Jan 2023, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 37 HARERA files, with the dates we read them
Registration no.
GGM/578/310/2022/53
Registration valid till
11 Aug 2022

Declared by the promoter to HARERA

Land area
16187.42 (Sqr/mtrs)
FAR
the application prints 174.57, which is not a ratio
licence
Licence Number 160 of 2008 dated 13/08/2008
Estimated project cost
₹239.52 crore
Cost of land
₹10.84 crore
Layout plan, declared approved (field 5a)
1 Oct 2019
Building plans, declared approved
1 Oct 2019
Declared inventory · 7 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type RESTAURANT · 2 units · 4,284.964 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE · 118 units · 96,029.274 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type ENTERTAINMENT · 1 unit · 3,211.287 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS · 113 units · 67,666.136 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type ACHOR · 4 units · 31,681.765 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type FOOD COURT · 1 unit · 16,041.108 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type MULTIPLEX · 1 unit · 30,580 sq m carpet
Statutory approvals, as declared · 17

Statutory approvals, as declared

  • I. APPROVED ZOING PLAN — declared: already been obtained (31 May 2013)
  • II. APPROVED REVISED BUILDING PLAN — declared: already been obtained (1 Oct 2019)
  • III. APPROVED REVISED FIRE FIGHTING SCHEME — declared: already been obtained (31 Dec 2019)
  • IV. GRANT OF CONSENT TO ESTABLISH — declared: already been obtained (12 Sept 2018)
  • V. NO OBJECTION CERTIFICATE FIRE SAFETY — declared: already been obtained (16 Mar 2020)
  • VI. OCCUPATION CERTIFICATE — declared: already been obtained (11 Aug 2020)
  • VII. ULTIMATE LOAD SUPPLY — declared: already been obtained (19 Mar 2020)
  • VIII. APPROVED SERVICE ESTIMATE — declared: already been obtained (29 Jan 2020)
  • IX. GRANT OF CONSENT TO OPERATE (UPTO DATE) — declared: already been obtained (10 Nov 2020)
  • X. ENVIRONMENTAL CLEARANCE — declared: already been obtained (11 May 2018)
  • XI. SEWAGE CONNECTION — declared: already been obtained (11 Nov 2020)
  • XII. WATER CONNECTION — declared: already been obtained (23 Oct 2020)
  • XIII. STORM WATER CONNECTION — declared: already been obtained (8 Jan 2021)
  • XIV. LICENSE AND UPTO DATE DOCUMENTS — declared: already been obtained (13 Aug 2008)
  • XV. HEIGHT CLEARANCE — declared: already been obtained (23 Sept 2010)
  • XVI. APPROVAL OF HSD STORAGE — declared: already been obtained (9 Mar 2020)
  • XVII. DG REGISTRATION FROM CEI — declared: already been obtained (10 Mar 2021)
On file with HARERA · 37 files

On file with HARERA (37)

Plans

Site plan

2 files
Layout Superimposed on Demarcation Plan18 Jan 2022Approved Site Plan18 Jan 2022

Layout plan

1 file
Latest Layout Plan8 Oct 2021

Zoning plan

1 file
Zoning Plan8 Oct 2021

Demarcation plan

1 file
Demarcation Plan8 Oct 2021

Building plans

2 files
Floor Plans, Elevation and Sections18 Jan 2022Approved Building Plans, Full Set8 Oct 2021

Services

Sewerage and drainage

4 files
Drainage Layout18 Jan 2022Sewarage Layout18 Jan 2022Approval of Sewage Connection8 Oct 2021Approval of Storm Water Connection8 Oct 2021

Water supply

2 files
Water Supply Layout18 Jan 2022Approval of Water Connection8 Oct 2021

Electricity

1 file
Approval of Ultimate Power Supply8 Oct 2021

Roads

1 file
Road Layout18 Jan 2022

Service plans

1 file
Service Plans on the Layout8 Oct 2021

Approvals and clearances

Occupation certificate (OC)

2 files
OC uploaded6 Sept 2023Occupation Certificate8 Oct 2021

Completion certificate (CC)

1 file
CC uploaded6 Sept 2023

DTCP licence

1 file
Licence Copy with Land Schedule9 Oct 2021

Environment clearance

2 files
Environmental Clearance18 Jan 2022Environmental Clearance8 Oct 2021

Fire safety

1 file
Firefighting Layout18 Jan 2022

Other NOCs and clearances

3 files
Consent to Establish8 Oct 2021Consent to Operate8 Oct 2021Approval of Height Clearance8 Oct 2021

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration8 Oct 2021

Money

Accounts and finance

3 files
Cash Flow Statement8 Oct 2021CA Certificate on the Application’s Figures8 Oct 2021Non-Default Certificate from a CA8 Oct 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit8 Oct 2021

Company papers

1 file
BR for Authorization for RERA8 Oct 2021

Other filings

Other filings

5 files
Dg & Transformer Registration8 Oct 2021Approval of Hsd Storage8 Oct 2021Registration of Dg from Cei8 Oct 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

160 OF 2008 · Dhoot Infrastructure Projects Ltd. · GURGAON-MANESAR

Licence valid to 12 Aug 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Oct 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

160 OF 2008: 3 parcels, 4 acres in all, in Basai (hadbast 50), tehsil Kadipur.

The licence register prints the same licensed area, 4 acres.

  • rectangle 730, kila 730/1 min1 bigha 8 biswa 6 biswansi
  • rectangle 730, kila 731/13 bigha 8 biswa 5 biswansi
  • rectangle 730, kila 732/1/11 bigha 11 biswa 9 biswansi

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Basai (hadbast 50), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 730, kila 730/1 min.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Layout Superimposed on Demarcation Plan18 Jan 2022Approved Site Plan18 Jan 2022

Layout plan

1 file
Latest Layout Plan8 Oct 2021

Building plans

2 files
Floor Plans, Elevation and Sections18 Jan 2022Approved Building Plans, Full Set8 Oct 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (37 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1746 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Dhoot Infrastructure Projects

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.