ULTIMUS 2.0

by MRG World · Sector 90, Gurugram

Not on our price list yet

Possession 14 Jul 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 90, Gurugram3.0 km from Dwarka Expressway, in a straight line
Carpet area
about 624 sq ft
In m²about 58 m², the average flat, as declared
Registered by
MRG WORLD LLPthe company that filed it, for MRG World
Timeline
  1. 26 Oct 2021Layout and building plans approveddeclared to HARERA, read 15 Oct 2026
  2. 14 Jul 2026Possession, as declareddeclared to HARERA, read 15 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenWalls - OBD (asian, burger, nerolac) flooring - vitrifies tiles
  • LiftsOTIS/KONE/ECE
  • FloorsBedrooms, kitchen- vitrified tiles 2X2 (ambani, orient BELL, vermora) toilets, balcony - ceramic tiles (ambani, orient BELL, vermora) staircase - granite, chima PINK
  • WallsExternal walls - texture paints (asian, burger, nerolac) internal walls - OBD (asian, burger, nerolac)
  • BathroomsStandard washbasin - hindware, wolga standard taps - hindware, wolga WC-western - parkash, wolga
  • WindowsExternal door windows- aluminum (jindal, umalco) window shutter - 5 MM clear glass (saint gobain, modigaurd, ashai)
  • Main doorFlushdoor with laminate (alpro, nayur, buttan TUFF-door)
  • Electrical fittingsSwitches - modular switch (ABB, prokon, anchor)

The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 90, GurugramSector 90, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20253.0 km
  • Delhi–Gurugram–SNB RRTS3.8 km
  • Sohna Elevated Corridor (NH-248A)10.1 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is ULTIMUS 2.0 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/529/261/2022/04. The register’s record shows an end date of 14 Jul 2026. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for ULTIMUS 2.0?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 14 Jul 2026. Its registration runs to 14 Jul 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ULTIMUS 2.0?From the records · Map pin and road lines, read 6 Sep 2026

ULTIMUS 2.0 is in Sector 90, Gurugram; the site address declared to HARERA is Sector 90 Gurugram. In a straight line it is about 3.0 km from Dwarka Expressway, 3.8 km from Delhi–Gurugram–SNB RRTS and 10.1 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ULTIMUS 2.0?From the records · HARERA, read 4 Nov 2026

ULTIMUS 2.0 is a MRG World project, registered by its company MRG WORLD LLP.

The source ↗MRG World's projects and court record

The records

What the registers hold for ULTIMUS 2.0: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/529/261/2022/04: Registration lapsed. The register’s record shows an end date of 14 Jul 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 38 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 18 Jan 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 26 Oct 2021, building plans 26 Oct 2021.Declared to HARERA, read 15 Oct 2026
The court record of MRG World’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 14 Jul 2026. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 38 OF 2021 ends soon

    Named in this project’s application. Valid to 18 Jan 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 45 HARERA files, with the dates we read them
Registration no.
GGM/529/261/2022/04
Registration valid till
14 Jul 2026
Declared possession
14 Jul 2026

Declared by the promoter to HARERA

Land area
5.2625 (Acre) (21,296.58 sq m)
FAR
2.4 proposed of 2.4 permissible
licence
38 of 2021
Estimated project cost
₹212.48 crore
Cost of land
₹37.77 crore
Layout plan, declared approved (field 5a)
26 Oct 2021
Building plans, declared approved
26 Oct 2021
Construction to start
15 Jan 2022
Completion declared for
14 Jul 2026
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 769 units · 44,610.424 sq m carpet · 6 towers · total for 769 flats, about 58 m² each
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. BUILDING APPROVALS — declared: already been obtained (26 Oct 2021)
On file with HARERA · 45 files

On file with HARERA (45)

Plans

Site plan

7 files
Site Plan-Water Supply Layout17 Jan 2022Site Plan-Irrigation Layout17 Jan 2022Site Plan17 Jan 2022

Layout plan

8 files
Basement Layout17 Jan 2022Commercial Layout and Area Statement 217 Jan 2022Commercial Layout and Area Statement17 Jan 2022

Zoning plan

1 file
Zoning Plan17 Jan 2022

Demarcation plan

1 file
Demarcation Plan17 Jan 2022

Building plans

7 files
Commercial Elevations and Sections17 Jan 2022Tower A1 and A2 Elevation17 Jan 2022Tower A1 and A2 Sections17 Jan 2022

Floor plans

5 files
Basement Area Diagram17 Jan 2022Tower 1-12 Carpet Area17 Jan 2022Tower A1 Area Diagram17 Jan 2022

Services

Sewerage and drainage

2 files
Master Plan for HUDA Service Estimate-Sewer Layout17 Jan 2022Master Plan for HUDA Service Estimate-Storm Water Layout17 Jan 2022

Water supply

3 files
Master Plan for HUDA Service Estimate-Irrigation Layout17 Jan 2022Master Plan for HUDA Service Estimate-Water Supply Layout17 Jan 2022Water Supply Networking Plan17 Jan 2022

Landscape and green areas

1 file
Site Layout- Green Area and Parking17 Jan 2022

Service plans

2 files
Service Estimates DTCP Communication17 Jan 2022Service Plans on the Layout7 Dec 2021

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule16 Dec 2021

Fire safety

2 files
Master Plan for HUDA Service Estimate-Fire Layout17 Jan 2022Site Plan-Fire Layout17 Jan 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration7 Dec 2021

Money

Accounts and finance

3 files
Cash Flow Statement17 Jan 2022CA Certificate on the Application’s Figures17 Jan 2022Non-Default Certificate from a CA16 Dec 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit16 Dec 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

38 OF 2021 · MRG ECO WORLD LLP · GURGAON-MANESAR

Licence valid to 18 Jan 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Dec 2021 · read 15 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

38 OF 2021: 8 parcels, 5.2625 acres in all, in Badha (hadbast 113), tehsil Manesar.

The licence register prints the same licensed area, 5.2625 acres.

  • 18//13/17 kanal
  • 18//148 kanal
  • 18//6/12 kanal 4 marla
  • 18//6/25 kanal 16 marla
Show the other 4 parcels
  • 18//78 kanal
  • 18//8/2/21 kanal 12 marla
  • 17//1/2/12 kanal 2 marla
  • 17//107 kanal 8 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 18//13/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

7 files
Site Plan-Water Supply Layout17 Jan 2022Site Plan-Irrigation Layout17 Jan 2022Site Plan17 Jan 2022Site Plan-Sewer Layout17 Jan 2022Site Plan-STP17 Jan 2022Site Plan-Strom Water Layout17 Jan 2022Approved Site Plan7 Dec 2021

Layout plan

8 files
Basement Layout17 Jan 2022Commercial Layout and Area Statement 217 Jan 2022Commercial Layout and Area Statement17 Jan 2022Community Hall Creche Cum Anganwadi Layouts17 Jan 2022Layout Tower A117 Jan 2022Layout Tower A317 Jan 2022

Building plans

7 files
Commercial Elevations and Sections17 Jan 2022Tower A1 and A2 Elevation17 Jan 2022Tower A1 and A2 Sections17 Jan 2022Tower A3 A4 A5 Elevations17 Jan 2022Tower A3 A4 A5 Sections17 Jan 2022Tower B1 Elevations17 Jan 2022Tower B1 Section17 Jan 2022

Floor plans

5 files
Basement Area Diagram17 Jan 2022Tower 1-12 Carpet Area17 Jan 2022Tower A1 Area Diagram17 Jan 2022Tower B1 Area Sheet17 Jan 2022Towers A3 and A5 Area Diagrams17 Jan 2022

Among the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (45 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1796 · read 15 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on MRG World

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.