Skip to content

AIPL AUTOGRAPH

by Advance India Projects · Sector 66, Gurugram

Not on our price list yet

Possession 8 Apr 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 66, Gurugram0.8 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
about 4,120 sq ft
In m²about 382.8 m², the average flat, as declared
Registered by
ADVANCE INDIA PROJECTS LIMITEDthe company that filed it, for Advance India Projects
Timeline
  1. 9 Apr 2021Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 8 Apr 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 30 Sep 2029Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside6.137 acres in all, by use
  • Apartment buildings2.292 acres · 37%
  • Roads1.868 acres · 30%
  • Parks and playgrounds1.542 acres · 25%
  • Other usesas the form names them: Rain, HSD, Guard, Boundary0.222 acres · 4%
  • Electricity sub-station0.214 acres · 3%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioning1. provision of AIR-conditioning for shops. 2. centralized AIR conditioning for offices
  • LiftsStandard BIS lift
  • WindowsOffices - glazing with OPEN ABLE windows as required as per standard design. no SHOP front glazing

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 66, GurugramSector 66, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.8 km
  • Delhi–Gurugram–SNB RRTS5.7 km
  • Dwarka ExpresswayOpen, 17 Aug 20256.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 5
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is AIPL AUTOGRAPH registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/481/213/2021/49. Valid to 30 Sep 2029.

The source ↗
What is the possession timeline for AIPL AUTOGRAPH?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 8 Apr 2026. Its registration runs to 30 Sep 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around AIPL AUTOGRAPH?From the records · Map pin and road lines, read 6 Sep 2026

AIPL AUTOGRAPH is in Sector 66, Gurugram; the site address declared to HARERA is Sector 66. In a straight line it is about 0.8 km from Sohna Elevated Corridor (NH-248A), 5.7 km from Delhi–Gurugram–SNB RRTS and 6.3 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building AIPL AUTOGRAPH?From the records · HARERA, read 3 Nov 2026

AIPL AUTOGRAPH is a Advance India Projects project, registered by its company ADVANCE INDIA PROJECTS LIMITED.

The source ↗Advance India Projects's projects and court record

The records

What the registers hold for AIPL AUTOGRAPH: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/481/213/2021/49: Registered. Valid to 30 Sep 2029.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 112 OF 2012 is on the DTCP register, valid to 4 May 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 9 Apr 2021, building plans 9 Apr 2021.Declared to HARERA, read 29 Oct 2026
The court record of Advance India Projects’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 88 HARERA files, with the dates we read them
Registration no.
GGM/481/213/2021/49
Registration valid till
30 Sept 2029
Declared possession
8 Apr 2026

Declared by the promoter to HARERA

Land area
6.1375 (Acre) (24,837.58 sq m)
FAR
the application prints 262, which is not a ratio
licence
License No. 112 of 2012 dated 27.10.2012
Estimated project cost
₹901.62 crore
Cost of land
₹75.09 crore
Layout plan, declared approved (field 5a)
9 Apr 2021
Building plans, declared approved
9 Apr 2021
Construction to start
1 May 2021
Completion declared for
8 Apr 2026
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 126 units · 43,811.28 sq m carpet · 3 towers · total for 126 flats, about 347.7 m² each
  • Apartment/Shops/Other Buildings · 24 units · 13,604.73 sq m carpet · 3 towers · total for 24 flats, about 566.9 m² each
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. ENVIRONMENT CLEARANCE — declared: already been obtained (5 Jun 2018)
  • II. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (14 Mar 2018)
  • III. FOREST NOC — declared: already been obtained (10 Jul 2013)
  • IV. BUILDING PLAN APPROVAL — declared: already been obtained (9 Apr 2021)
On file with HARERA · 88 files

On file with HARERA (88)

Plans

Site plan

2 files
Layout Superimposed on Demarcation Plan27 Jul 2021Approved Site Plan27 Jul 2021

Layout plan

2 files
Latest Layout Plan27 Jul 2021Copy of Super Imposed Demarcation Plan on the Approved Layout Plan27 Jul 2021

Zoning plan

1 file
Zoning Plan27 Jul 2021

Demarcation plan

1 file
Demarcation Plan27 Jul 2021

Building plans

8 files
Terrace Framing Plan -Tower-A2 Sept 2021Terrace Framing Plan -Tower-B2 Sept 2021Terrace Framing Plan -Tower-C2 Sept 2021

Floor plans

29 files
Typical Framing Plan -Tower-C2 Sept 2021Framing Plan at Ground Floor Level2 Sept 2021Typical Framing Plan -Tower-A2 Sept 2021

Services

Sewerage and drainage

4 files
Storm Water Assurance2 Sept 2021Sewerage Assurance27 Jul 2021Sewerage Plan27 Jul 2021Storm Water Drainage Plan27 Jul 2021

Water supply

2 files
Water Supply Assurance27 Jul 2021Water Supply Plan27 Jul 2021

Electricity

3 files
Electricity Supply Plan2 Sept 2021Street Light Plan2 Sept 2021Electricity Load Availability27 Jul 2021

Roads

1 file
Road and Pavement Plan27 Jul 2021

Landscape and green areas

1 file
Landscape Plan2 Sept 2021

Service plans

3 files
Solid Waste Management Plan2 Sept 2021Service Plan Letter27 Jul 2021Service Plan Estimates Booklet27 Jul 2021

Approvals and clearances

DTCP licence

5 files
COD and Transfer of License Order2 Sept 2021Original License27 Jul 2021Licence Copy with Land Schedule27 Jul 2021

Environment clearance

1 file
Environment Clearance Approval27 Jul 2021

Fire safety

1 file
Fire Scheme Application Acknowledgment Copy27 Jul 2021

Other NOCs and clearances

3 files
Airport Height Clearance27 Jul 2021Forest NOC27 Jul 2021Tree Cutting, Natural Conv & Powerline27 Jul 2021

Land records

Land records

6 files
Revenue Record Entry of Licence and Collaboration27 Jul 2021Jamabandi27 Jul 2021Mutation Aipl27 Jul 2021

Sales papers

Allotment and sale agreements

2 files
Draft Allotment Letter27 Jul 2021Draft Agreement to Sale27 Jul 2021

Money

Accounts and finance

3 files
Cash Flow Statement2 Sept 2021CA Certificate on the Application’s Figures2 Sept 2021Non-Default Certificate from a CA27 Jul 2021

The promoter’s papers

Declarations and affidavits

3 files
Bank Undertaking27 Jul 2021Promoter's Undertaking [Affidavit 4(3)(I)(D)] Notarised27 Jul 2021The Promoter’s Declaration on Affidavit20 Apr 2021

Company papers

1 file
ROC Form27 Jul 2021

HARERA’s orders

HARERA’s orders

1 file
Addendum to the Registration Certificate-Revision in Building Plans17 Mar 2026

Other filings

Other filings

5 files
Framing Plan at Bmt-3 Level2 Sept 2021Foundation Plan2 Sept 2021Framing Plan at Bmt-1 Level2 Sept 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

112 OF 2012 · Gupta Promoters · GURGAON-MANESAR

Licence valid to 4 May 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 21 May 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

112 OF 2012: 12 parcels, 6.1375 acres in all, in Madabass (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 6.14 acres.

  • 33//13 kanal 3 marla
  • 33//106 kanal 14 marla
  • 33//11/14 kanal
  • 33//11/24 kanal
Show the other 8 parcels
  • 34//15/14 kanal
  • 34//15/24 kanal
  • 34//167 marla
  • 34//58 kanal
  • 34//6/1/12 kanal 8 marla
  • 34//6/1/216 marla
  • 34//6/24 kanal 16 marla
  • 34//7/16 kanal 18 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Madabass (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 33//1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Layout Superimposed on Demarcation Plan27 Jul 2021Approved Site Plan27 Jul 2021

Layout plan

2 files
Latest Layout Plan27 Jul 2021Copy of Super Imposed Demarcation Plan on the Approved Layout Plan27 Jul 2021

Building plans

8 files
Terrace Framing Plan -Tower-A2 Sept 2021Terrace Framing Plan -Tower-B2 Sept 2021Terrace Framing Plan -Tower-C2 Sept 2021BR III27 Jul 2021Section Plan27 Jul 2021Floor Plan- 11TH, 12th & Terrace Floor27 Jul 2021

Floor plans

29 files
Typical Framing Plan -Tower-C2 Sept 2021Framing Plan at Ground Floor Level2 Sept 2021Typical Framing Plan -Tower-A2 Sept 2021Typical Framing Plan -Tower-B2 Sept 2021Parking Plan- Basement- 527 Jul 2021Floor Plan- 6th Floor27 Jul 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (88 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1557 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Advance India Projects

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.