Skip to content

THE CITYSCAPE

by French Buildmart · Sector 66, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 66, Gurugram0.8 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
about 723 sq ft
In m²about 67.2 m², the average flat, as declared
Registered by
FRENCH BUILDMART PRIVATE LIMITEDthe company that filed it, for French Buildmart
Timeline
  1. 11 May 2020Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2022Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.023 acres in all, by use
  • Other usesas the form names them: Area, Open, Solid, Rain1.312 acres · 65%
  • Roads0.614 acres · 30%
  • Parks and playgrounds0.083 acres · 4%
  • Electricity sub-station0.014 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningChiller based
  • Lifts8 passenger+2 service lifts
  • FloorsTile/carpet
  • WallsPaint
  • BathroomsROCA/parryware
  • WindowsSGU/DGU
  • Main doorMS
  • Electrical fittingsGreatwhite/anchor

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 66, GurugramSector 66, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.8 km
  • Delhi–Gurugram–SNB RRTS5.7 km
  • Dwarka ExpresswayOpen, 17 Aug 20256.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is THE CITYSCAPE registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/527/259/2022/02. The register’s record shows an end date of 30 Sep 2022. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around THE CITYSCAPE?From the records · Map pin and road lines, read 6 Sep 2026

THE CITYSCAPE is in Sector 66, Gurugram; the site address declared to HARERA is Village- Maidawas, Sector- 66, Gurugram, Haryana. In a straight line it is about 0.8 km from Sohna Elevated Corridor (NH-248A), 5.7 km from Delhi–Gurugram–SNB RRTS and 6.3 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building THE CITYSCAPE?From the records · HARERA, read 3 Nov 2026

THE CITYSCAPE is a French Buildmart project, registered by its company FRENCH BUILDMART PRIVATE LIMITED.

The source ↗French Buildmart's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for THE CITYSCAPE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/527/259/2022/02: Registration lapsed. The register’s record shows an end date of 30 Sep 2022.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 43 OF 2010 is on the DTCP register, valid to 7 Jun 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 11 May 2020, building plans 11 May 2020.Declared to HARERA, read 29 Oct 2026
The court record of French Buildmart’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 30 Sep 2022. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 39 HARERA files, with the dates we read them
Registration no.
GGM/527/259/2022/02
Registration valid till
30 Sept 2022

Declared by the promoter to HARERA

Land area
2.0229 (Acre) (8,186.39 sq m)
FAR
3.5 proposed of 3.5 permissible
licence
43 of 2010 dated 08-06-2010
Estimated project cost
₹125.67 crore
Cost of land
₹17.29 crore
Layout plan, declared approved (field 5a)
11 May 2020
Building plans, declared approved
11 May 2020
Declared inventory · 2 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS · 307 units · 9,481.23 sq m carpet · total for 307 flats, about 30.9 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE · 44 units · 14,092.07 sq m carpet · total for 44 flats, about 320.3 m² each
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LICECNE — declared: already been obtained (8 Jun 2010)
  • II. BUILDING PLAN — declared: already been obtained (11 May 2020)
  • III. ZONING — declared: already been obtained (6 Feb 2019)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (3 Sept 2020)
  • V. HEIGHT NOC — declared: already been obtained (25 May 2018)
  • VI. FOREST — declared: already been obtained (3 Jul 2010)
  • VII. ZONING — declared: already been obtained (6 Feb 2019)
  • VIII. SERVICE ESTIMATES — declared: already been obtained (6 Feb 2020)
On file with HARERA · 39 files

On file with HARERA (39)

Plans

Site plan

2 files
Super Imposed Layout on Demacation Plan8 Jan 2022Approved Site Plan16 Jun 2021

Layout plan

1 file
Latest Layout Plan11 Sept 2020

Zoning plan

1 file
Zoning Plan11 Sept 2020

Demarcation plan

1 file
Demarcation Plan11 Sept 2020

Building plans

4 files
Basement and Terrace Plan16 Jun 2021Elevation Plan16 Jun 2021Section Plan16 Jun 2021Approved Building Plans, Full Set16 Jun 2021

Floor plans

1 file
Floor Plan16 Jun 2021

Services

Sewerage and drainage

2 files
Storm Water Plan16 Jun 2021Sewerage Plan16 Jun 2021

Water supply

1 file
Water Supply Plan16 Jun 2021

Electricity

2 files
Electricity Supply Plan8 Jan 2022Street Light Plan8 Jan 2022

Roads

1 file
Road Plan16 Jun 2021

Landscape and green areas

1 file
Landscape Plan8 Jan 2022

Service plans

4 files
Solid Waste Management Plan8 Jan 2022Service Estimate Approval Letter16 Jun 2021Service Estimate Report16 Jun 2021Service Plans on the Layout16 Jun 2021

Approvals and clearances

DTCP licence

6 files
Licence Renewal Dated 22.10.201816 Jun 2021Revised BR - III Dated 11.05.2020 (TOD)16 Jun 2021Renewal of License Dated 26.04.202116 Jun 2021

Environment clearance

1 file
Environment Clearance11 Sept 2020

Fire safety

2 files
Fire Plan16 Jun 2021Fire Approval16 Jun 2021

Other NOCs and clearances

2 files
Height NOC11 Sept 2020Forest NOC11 Sept 2020

Land records

Land records

2 files
NEC11 Sept 2020Revenue Record Entry of Licence and Collaboration11 Sept 2020

Money

Accounts and finance

3 files
Cash Flow Statement16 Sept 2020CA Certificate on the Application’s Figures15 Sept 2020Non-Default Certificate from a CA15 Sept 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit16 Jun 2021

Company papers

1 file
Board Resolution11 Sept 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

43 OF 2010 · French Buildmart Pvt Ltd · GURGAON-MANESAR

Licence valid to 7 Jun 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Sept 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

43 OF 2010: 5 parcels, 2.0229 acres in all, in Madabass (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 2.02 acres.

  • 14//51 kanal 12 marla
  • 14//6/17 kanal 5 marla
  • 14//7/12 kanal 3 marla
  • 13//1/1 min5 kanal 3 marla
Show the other 1 parcel
  • 13//2/1 min6 sarsai

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Madabass (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 14//5.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Super Imposed Layout on Demacation Plan8 Jan 2022Approved Site Plan16 Jun 2021

Layout plan

1 file
Latest Layout Plan11 Sept 2020

Building plans

4 files
Basement and Terrace Plan16 Jun 2021Elevation Plan16 Jun 2021Section Plan16 Jun 2021Approved Building Plans, Full Set16 Jun 2021

Floor plans

1 file
Floor Plan16 Jun 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (39 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1448 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on French Buildmart

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.