Under construction

ATS HomeKraft Sanctuary 105

by ATS Realworth · Sector 105, Gurugram

Not on our price list yet

Possession 1 Jun 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 105, Gurugram0.5 km from Dwarka Expressway, in a straight line
Carpet area
1,035–1,565 sq ft
In m²about 96–145 m², as declared
Registered by
1000 TREES HOUSING PRIVATE LIMITEDthe company that filed it, for ATS Realworth
Timeline
  1. 22 May 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 1 Jun 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 25 Jun 2031Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

472homes, 1,035 to 1,565 sq ft of carpet area
  • 1,000–1,500 sq ft1,035 sq ft332
  • 1,500–2,000 sq ft1,565 sq ft140

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside17,549 m² in all, by use
  • Roads6,652 m² · 38%
  • Green belts4,990 m² · 28%
  • Apartment buildings2,543 m² · 14%
  • Other usesas the form names them: Area for boundary wall, Area to be left for transferring to the government free of cost for road1,477 m² · 8%
  • Parks and playgrounds836 m² · 5%
  • Parking763 m² · 4%
  • Electricity sub-station194 m² · 1%
  • Pavements95 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenAll kitchen counters in PRE-polished granite/ marble stone, electrical points for chimeny , hob, microwave & fridge to be provided
  • LiftsLifts to be provided for access to all habitable floors from common lobby
  • FloorsVitrified tiles flooring in living, dining & lobby, laminated wooden/vitrified tiles flooring in bedrooms. tiles in kitchen, ceramic tile in utility/servant room and toilets. balconies WILL be in anti-skid ceramic flooring
  • WallsCeramic tiles upto DADO height in toilets & 600MM height above kitchen counter SLAB in appropriatecolour & paint
  • BathroomsPremium sanitary fixtures, premium chrome platedfittings
  • WindowsWindow panels of UPVC sections,SIZE and section as per design of the architect
  • Main doorMAIN entrance door –polished/enamel painted engineered wood flush door ; stainless steel/brass finished hardware fittings for MAIN door & aluminium powder coated hardware fitting and locks of branded makes
  • Electrical fittingsProvision for adequate light & power points. telephone & T.V. outlets in drawing and master bedroom. moulded modular plastic switches &protective; MCB'S

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 105, GurugramSector 105, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.5 km
  • Delhi–Gurugram–SNB RRTS4.3 km
  • Sohna Elevated Corridor (NH-248A)6.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is ATS HomeKraft Sanctuary 105 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/862/594/2024/89. Valid to 25 Jun 2031.

The source ↗
What is the possession timeline for ATS HomeKraft Sanctuary 105?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 1 Jun 2031. Its registration runs to 25 Jun 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ATS HomeKraft Sanctuary 105?From the records · Map pin and road lines, read 6 Sep 2026

ATS HomeKraft Sanctuary 105 is in Sector 105, Gurugram; the site address declared to HARERA is Sector 105, Near Daulatabad Flyover, Dwarka Expressway. In a straight line it is about 0.5 km from Dwarka Expressway, 4.3 km from Delhi–Gurugram–SNB RRTS and 6.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ATS HomeKraft Sanctuary 105?From the records · HARERA, read 4 Nov 2026

ATS HomeKraft Sanctuary 105 is a ATS Realworth project, registered by its company 1000 TREES HOUSING PRIVATE LIMITED.

The source ↗ATS Realworth's projects and court record

The records

What the registers hold for ATS HomeKraft Sanctuary 105: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/862/594/2024/89: Registered. Valid to 25 Jun 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 127 OF 2012 is on the DTCP register, valid to 26 Dec 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 22 May 2024, building plans 22 May 2024.Declared to HARERA, read 29 Oct 2026
The court record of ATS Realworth’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 25 HARERA files, with the dates we read them
Registration no.
GGM/862/594/2024/89
Registration valid till
25 Jun 2031
Declared possession
1 Jun 2031

Declared by the promoter to HARERA

Land area
17548.87 (Sqr/mtrs)
FAR
3.72 proposed
licence
127 of 2012 (08.02.2024)
Estimated project cost
₹833.95 crore
Cost of land
₹224.52 crore
Layout plan, declared approved (field 5a)
22 May 2024
Building plans, declared approved
22 May 2024
Construction to start
2 Jun 2024
Completion declared for
1 Jun 2031
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 332 units · 96.15 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 140 units · 145.39 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. AAI — declared: already been obtained (13 Jun 2022)
  • II. HARYANA STATE POLLUTION CONTROL BOARD — declared: already been obtained (14 Jul 2015)
  • III. FOREST NOC — declared: already been obtained (4 Apr 2013)
  • IV. BUILDING PLAN APPROVAL — declared: already been obtained (27 Mar 2024)
  • V. ENVIRONMENT CLEARANCE — declared: already been obtained (5 Feb 2015)
  • VI. LICENSE — declared: already been obtained (27 Dec 2012)
  • VII. REVISED ZONING PLAN — declared: already been obtained (22 May 2024)
  • VIII. PHASING PLAN — declared: already been obtained (12 Jul 2024)
On file with HARERA · 25 files

On file with HARERA (25)

Plans

Site plan

1 file
Approved Site Plan4 May 2024

Layout plan

3 files
Phasing Plan Final Drawing23 Dec 2024Phasing Plan Approval Letter23 Dec 2024Latest Layout Plan4 May 2024

Zoning plan

1 file
Zoning Plan4 May 2024

Demarcation plan

1 file
Demarcation Plan4 May 2024

Building plans

7 files
Building Plan Approval-BR-III23 Dec 2024Approved Building Plan-Part 24 May 2024Approved Building Plan-Part 44 May 2024

Services

Service plans

1 file
Service Plans on the Layout4 May 2024

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule4 May 2024

Environment clearance

1 file
Environment Clearance4 May 2024

Other NOCs and clearances

2 files
Forest NOC4 May 2024AAI4 May 2024

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration4 May 2024

Money

Accounts and finance

4 files
Non-Default Certificate from a CA23 Dec 2024Cash Flow Statement23 Dec 2024CA Certificate on the Application’s Figures10 May 2024Registration Fee7 May 2024

The promoter’s papers

Declarations and affidavits

2 files
Bank Undertaking23 Dec 2024The Promoter’s Declaration on Affidavit23 Dec 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

127 OF 2012 · 1000 Trees Housing Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 26 Dec 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 10 May 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

127 OF 2012: 9 parcels, 13.0782 acres in all, in Gurgaon (incompletely identified), tehsil Gurgaon.

The licence register prints the same licensed area, 13.08 acres.

  • rectangle 168, kila 168 to 170/23 bigha 13 biswa 7 biswansi
  • rectangle 168, kila 168 to 170/47 bigha 2 biswa 14 biswansi
  • rectangle 181, kila 181/1/23 biswa 6 biswansi
  • rectangle 181, kila 181/29 biswa
Show the other 5 parcels
  • rectangle 3343, kila 3343/184/2/2/26 biswa 6 biswansi
  • rectangle 174, kila 1743 bigha 16 biswa
  • rectangle 180, kila 180/22 bigha 6 biswa 10 biswansi
  • rectangle 3343, kila 3343/184/1/212 biswa 8 biswansi
  • rectangle 166, kila 166/22 bigha 8 biswa 19 biswansi

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gurgaon (incompletely identified), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 168, kila 168 to 170/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,700 per sq ft

this sector, collector rates effective 1 Apr 2026, Gurugram tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan4 May 2024

Layout plan

3 files
Phasing Plan Final Drawing23 Dec 2024Phasing Plan Approval Letter23 Dec 2024Latest Layout Plan4 May 2024

Building plans

7 files
Building Plan Approval-BR-III23 Dec 2024Approved Building Plan-Part 24 May 2024Approved Building Plan-Part 44 May 2024Approved Building Plans, Full Set4 May 2024Building Plan Approval4 May 2024Approved Building Plan-Part 34 May 2024Complete Set of the Last Approved Plans Part-54 May 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (25 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2926 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on ATS Realworth

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.