Skip to content

THE GROVE AT SANCTUARY

by 1000 Trees Housing · Sector 105, Gurugram

Not on our price list yet

Possession 30 Oct 2028 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 105, Gurugram0.5 km from Dwarka Expressway, in a straight line
Carpet area
271–1,135 sq ft
In m²25.2–105.4 m², as declared
Registered by
1000 TREES HOUSING PRIVATE LIMITEDthe company that filed it, for 1000 Trees Housing
Timeline
  1. 19 Dec 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Oct 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningFor shops-provision only for acinstallation for suites-provision only for acinstallation"
  • KitchenFor shops- NA for suites-all kitchenettecounters in PRE-polished granite/ marblestoneor appropriate finish, electricalpoints for kitchen appliances to beprovided."
  • LiftsFor shops & suites-lifts to be provided foraccess to all habitable floors from commonlobby
  • FloorsFor shops- RCC SLAB surface. for suites-vitrified tiles flooring in foyer, kitchenette&dining; , laminated wooden/vitrified tilesflooring in bedrooms. ceramic tile in toilets.balconies WILL be in anti-skid ceramic tileflooring."
  • WallsFor shops-block WORK only. for suites-plaster with OBD, ceramic tiles upto dadoheight in toilets & 600MM height abovekitchenette counter SLAB in appropriatecolour & paint."
  • BathroomsFor shops (common area facility)-brandedmake. for suites-premium sanitary fixtures,premium chrome plated fittings
  • Windows"for shops-NA for suites- window panels ofupvc sections,SIZE and section as per designof the architect"
  • Main doorFor shops-NA for suites-MAIN entrance door–polished/enamel painted engineered woodflush door ; stainless steel/brass finishedhardware fittings for MAIN door & aluminiumpowder coated hardware fitting and locksof branded makes"

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 105, GurugramSector 105, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.5 km
  • Delhi–Gurugram–SNB RRTS4.3 km
  • Sohna Elevated Corridor (NH-248A)6.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is THE GROVE AT SANCTUARY registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/1040/772/2026/12. Valid to 30 Oct 2028.

The source ↗
What is the possession timeline for THE GROVE AT SANCTUARY?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Oct 2028. Its registration runs to 30 Oct 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around THE GROVE AT SANCTUARY?From the records · Map pin and road lines, read 6 Sep 2026

THE GROVE AT SANCTUARY is in Sector 105, Gurugram; the site address declared to HARERA is Sector 105, Near Daulatabad Flyover, Dwarka Expressway. In a straight line it is about 0.5 km from Dwarka Expressway, 4.3 km from Delhi–Gurugram–SNB RRTS and 6.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building THE GROVE AT SANCTUARY?From the records · HARERA, read 3 Nov 2026

THE GROVE AT SANCTUARY is a 1000 Trees Housing project, registered by its company 1000 TREES HOUSING PRIVATE LIMITED.

The source ↗1000 Trees Housing's projects and court record

The records

What the registers hold for THE GROVE AT SANCTUARY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1040/772/2026/12: Registered. Valid to 30 Oct 2028.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 127 OF 2012 is on the DTCP register, valid to 26 Dec 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 19 Dec 2025, building plans 19 Dec 2025.Declared to HARERA, read 29 Oct 2026
The court record of 1000 Trees Housing’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 33 HARERA files, with the dates we read them
Registration no.
GGM/1040/772/2026/12
Registration valid till
30 Oct 2028
Declared possession
30 Oct 2028

Declared by the promoter to HARERA

Land area
2.7620 (Sqr/mtrs)
FAR
2.3 proposed of 2.3 permissible
licence
Valid upto 127 OF 2012 (27.12.2027)
Estimated project cost
₹174.81 crore
Cost of land
₹3.92 crore
Layout plan, declared approved (field 5a)
19 Dec 2025
Building plans, declared approved
19 Dec 2025
Construction to start
31 Oct 2025
Completion declared for
30 Oct 2028
Declared inventory · 206 types

Declared inventory — 206 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 1 unit · 25.49 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 25.64 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 25.48 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 13.8 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 30.94 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 30.8 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 27.9 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 27.9 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. LICENSE-127 OF 2012 — declared: already been obtained (27 Dec 2012)
  • II. REVISED ZONING — declared: already been obtained (24 Nov 2024)
  • III. AAI — declared: already been obtained (13 Jun 2022)
  • IV. PHASING PLAN — declared: already been obtained (12 Jul 2024)
  • V. REVISED BUILDING PLAN APPROVAL — declared: already been obtained (19 Dec 2025)
  • VI. APPROVAL OF SERVICEPLAN/ESTIMATES — declared: applied for but yet to receive (30 Jan 2026)
  • VII. FIRE SCHEME APPROVAL [YET TO BE APPLIED] — declared: yet to file for approval
On file with HARERA · 33 files

On file with HARERA (33)

Plans

Site plan

1 file
Approved Site Plan23 Dec 2025

Layout plan

3 files
Phasing Plan Approval Letter19 Feb 2026Latest Layout Plan23 Dec 2025Approved Phasing Plan23 Dec 2025

Zoning plan

1 file
Zoning Plan23 Dec 2025

Demarcation plan

2 files
Demarcation Plan23 Dec 2025Suprimposed Demarcation Plan23 Dec 2025

Building plans

5 files
Building Plan Approval BR-III23 Dec 2025Approved Building Plans, Full Set23 Dec 2025BR23 Dec 2025

Services

Electricity

1 file
Summary of Various Coll. Agreements Highlighting Imp. Clauses of the Agreements23 Dec 2025

Service plans

5 files
Service Plans on the Layout23 Dec 2025Service Plan and Estimates Approval Letter23 Dec 2025Service Plans on the Layout23 Dec 2025

Approvals and clearances

DTCP licence

3 files
LOI23 Dec 2025LC-IV23 Dec 2025Licence Copy with Land Schedule23 Dec 2025

Environment clearance

1 file
EC23 Dec 2025

Other NOCs and clearances

2 files
AAI23 Dec 2025Forest NOC23 Dec 2025

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration23 Dec 2025

Sales papers

Allotment and sale agreements

3 files
Draft Agreement for Sale18 Feb 2026Draft Allotment Letter18 Feb 2026Gist of Important Provisions of BBA23 Dec 2025

Money

Accounts and finance

4 files
Registration Fee Two Dds19 Feb 2026CA Certificate on the Application’s Figures18 Feb 2026Cash Flow Statement18 Feb 2026Non-Default Certificate from a CA18 Feb 2026

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit23 Dec 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

127 OF 2012 · 1000 Trees Housing Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 26 Dec 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Dec 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

127 OF 2012: 9 parcels, 13.0782 acres in all, in Gurgaon (incompletely identified), tehsil Gurgaon.

The licence register prints the same licensed area, 13.08 acres.

  • rectangle 168, kila 168 to 170/23 bigha 13 biswa 7 biswansi
  • rectangle 168, kila 168 to 170/47 bigha 2 biswa 14 biswansi
  • rectangle 181, kila 181/1/23 biswa 6 biswansi
  • rectangle 181, kila 181/29 biswa
Show the other 5 parcels
  • rectangle 3343, kila 3343/184/2/2/26 biswa 6 biswansi
  • rectangle 174, kila 1743 bigha 16 biswa
  • rectangle 180, kila 180/22 bigha 6 biswa 10 biswansi
  • rectangle 3343, kila 3343/184/1/212 biswa 8 biswansi
  • rectangle 166, kila 166/22 bigha 8 biswa 19 biswansi

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gurgaon (incompletely identified), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 168, kila 168 to 170/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan23 Dec 2025

Layout plan

3 files
Phasing Plan Approval Letter19 Feb 2026Latest Layout Plan23 Dec 2025Approved Phasing Plan23 Dec 2025

Building plans

5 files
Building Plan Approval BR-III23 Dec 2025Approved Building Plans, Full Set23 Dec 2025BR23 Dec 2025Approved Building Plans, Full Set23 Dec 2025Approved Building Plans, Full Set23 Dec 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (33 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3893 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on 1000 Trees Housing

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.