ATS TRIUMPH VILLAS
by Greatvalue Hpl Infratech · Sector 104, Gurugram
Not on our price list yet
Possession 31 Dec 2028 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 104, Gurugram0.6 km from Dwarka Expressway, in a straight line
- Registered by
- GREATVALUE HPL INFRATECH PRIVATE LIMITEDthe company that filed it, for Greatvalue Hpl Infratech
- 19 Dec 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 15 Dec 2028Registration valid toHARERA, read 4 Nov 2026
- 31 Dec 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings0.9 acres · 55%
- Other usesas the form names them: Landscaping, Green0.46 acres · 28%
- Roads0.27 acres · 17%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningTo be decided by management
- KitchenKitchen counter finished with PRE-polished quartz stones. premium modular cabinets along with appropriate finish. hob & chimney WILL be provided.
- LiftsOnly provision of lift well
- FloorsImported marble flooring in, master bed room, living,dining,lobby,family lounge MAIN staircase and landing: premium wooden flooring in REST of bedrooms: premium vitrified tiles in kitchen . vetrified tiles in servant room,imported marble in master'S toilet and premium ceramic tiles in REST of the toilets.balconies and utility finished with anti skid ceramic tile flooring.
- WallsPremium ceramic tiles upto required height in toilets, imported tiles upto 600MM height above kitchen counter.
- BathroomsPremium sanitary fixtures, premium chrome plated fittings.
- Windows"window panels of seasoned hardwood/aluminium/ UPVC sections. all hardware in powder coated aluminium. SIZE and section as per design of the architect."
- Main doorFlush doors - polished/enamel painted; stainless steel/ brass finished hardware fittings for MAIN door & aluminium powder coated hardware fitting and locks of branded makes.
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20250.6 km
- Delhi–Gurugram–SNB RRTS4.6 km
- Sohna Elevated Corridor (NH-248A)5.5 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
![]() | Indiabulls | Same sector | New launch | ₹13,900/sq ft | — |
![]() | Hero Homes | Same sector | Under construction | — | 31 Dec 2029 |
DELPHINE CENTRAL PARK ESTATES PHASE IIINo photo on file yet | St. Nicholas Estate Development | Same sector | — | — | 31 Dec 2032 |
YASHIKA-104No photo on file yet | Apricus Hills | Same sector | — | — | 14 Jun 2027 |
| Godrej Projects Development | Same sector | — | — | — | |
Zara Aavaas-2No photo on file yet | Perfect Buildwell | Same sector | — | — | 15 Aug 2022 |
ZARA AAVAAS-3No photo on file yet | Perfect Buildwell | Same sector | — | — | 1 Jul 2024 |
DELPHINE CENTRAL PARK ESTATES PHASE IINo photo on file yet | St. Nicholas Estate Development | Same sector | — | — | 30 Sep 2032 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is ATS TRIUMPH VILLAS registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/1051/783/2026/23. Valid to 15 Dec 2028.
The source ↗What is the possession timeline for ATS TRIUMPH VILLAS?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2028. Its registration runs to 15 Dec 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around ATS TRIUMPH VILLAS?From the records · Map pin and road lines, read 6 Sep 2026
ATS TRIUMPH VILLAS is in Sector 104, Gurugram; the site address declared to HARERA is Village - Dhanwapur, Sector -104, Gurugram. In a straight line it is about 0.6 km from Dwarka Expressway, 4.6 km from Delhi–Gurugram–SNB RRTS and 5.5 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building ATS TRIUMPH VILLAS?From the records · HARERA, read 4 Nov 2026
ATS TRIUMPH VILLAS is a Greatvalue Hpl Infratech project, registered by its company GREATVALUE HPL INFRATECH PRIVATE LIMITED.
The source ↗Greatvalue Hpl Infratech's projects and court recordThe records
What the registers hold for ATS TRIUMPH VILLAS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/1051/783/2026/23: Registered. Valid to 15 Dec 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 10 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 2 Feb 2020.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 19 Dec 2025, building plans 19 Dec 2025.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Licence 10 OF 2012 lapsed
Named in this project’s application. Valid to 2 Feb 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 25 HARERA files, with the dates we read them
- Registration no.
- GGM/1051/783/2026/23
- Registration valid till
- 15 Dec 2028
- Declared possession
- 31 Dec 2028
Declared by the promoter to HARERA
- Land area
- 1.63 (Acre) (6,596.38 sq m)
- FAR
- 1.36 proposed
- licence
- License -1 63 of 2011 (15.07.2027) License -2 10 of 2012 (02.02.2027)
- Estimated project cost
- ₹142.35 crore
- Cost of land
- ₹7.47 crore
- Layout plan, declared approved (field 5a)
- 19 Dec 2025
- Building plans, declared approved
- 19 Dec 2025
- Construction to start
- 1 Jan 2026
- Completion declared for
- 31 Dec 2028
Declared inventory · 2 types
Declared inventory
- Apartment/Shops/Other Buildings · 4 units · 451.97 sq m carpet · 4 towers
- Apartment/Shops/Other Buildings · 15 units · 458.93 sq m carpet · 15 towers
Statutory approvals, as declared · 6
Statutory approvals, as declared
- I. LICENSE 63 OF 2011 — declared: already been obtained (16 Jul 2011)
- II. LICENSE 10 OF 2012 — declared: already been obtained (3 Feb 2012)
- III. ENVIRONMENT CLEARANCE — declared: already been obtained (17 Jun 2013)
- IV. FOREST NOC — declared: already been obtained (7 Aug 2012)
- V. PHASING PLAN APPROVAL LETTER — declared: already been obtained (9 Sept 2025)
- VI. BUILDING PLAN SANCTION LETEER BR-III — declared: already been obtained (19 Dec 2025)
On file with HARERA · 25 files
On file with HARERA (25)
Plans
Site plan
1 fileLayout plan
3 filesZoning plan
1 fileDemarcation plan
1 fileBuilding plans
4 filesServices
Service plans
1 fileApprovals and clearances
DTCP licence
1 fileEnvironment clearance
1 fileOther NOCs and clearances
2 filesLand records
Land records
1 fileSales papers
Allotment and sale agreements
2 filesMoney
Accounts and finance
5 filesThe promoter’s papers
Declarations and affidavits
1 fileOther filings
Other filings
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 2 DTCP licences named on the application
63 OF 2011 · Greatvalue HPL Infratech · GURGAON-MANESAR
Licence valid to 15 Jul 2027
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
10 OF 2012 · Great Value HPL Infratech · GURGAON-MANESAR
Licence valid to 2 Feb 2020
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Dec 2025 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the 2 licences
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
63 OF 2011: 19 parcels, 10.4625 acres in all, in Dhanwapur (hadbast 51), tehsil Kadipur.
The licence register prints the same licensed area, 10.46 acres.
- 27//21/14 kanal
- 27//228 kanal
- 27//23/16 kanal
- rectangle 27, kila 20/14 kanal 8 marla
Show the other 15 parcels
- 38//107 kanal 10 marla
- 38//118 kanal
- 38//128 kanal
- 38//28 kanal
- 38//261 kanal 8 marla
- 38//2710 marla
- 38//37 kanal 11 marla
- 38//41 kanal 11 marla
- 38//84 kanal 8 marla
- 38//9/22 kanal 18 marla
- 38//9/32 kanal 10 marla
- rectangle 38, kila 28/219 marla
- rectangle 38, kila 13/2/12 kanal 10 marla
- rectangle 38, kila 13/1/14 kanal 11 marla
- rectangle 38, kila 9/1/21 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
10 OF 2012: 6 parcels, 3.6313 acres in all, in Dhanwapur (hadbast 51), tehsil Kadipur.
The licence register prints the same licensed area, 3.63 acres.
- 27//176 kanal 16 marla
- 27//186 kanal 4 marla
- 27//197 kanal 7 marla
- 27//23/22 kanal
Show the other 2 parcels
- rectangle 27, kila 24/110 marla
- rectangle 27, kila 24/26 kanal 4 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Dhanwapur (hadbast 51), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 27//21/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
3 filesBuilding plans
4 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (25 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3728 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Greatvalue Hpl Infratech
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.