Skip to content

ATS TRIUMPH VILLAS

by Greatvalue Hpl Infratech · Sector 104, Gurugram

Not on our price list yet

Possession 31 Dec 2028 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 104, Gurugram0.6 km from Dwarka Expressway, in a straight line
Registered by
GREATVALUE HPL INFRATECH PRIVATE LIMITEDthe company that filed it, for Greatvalue Hpl Infratech
Timeline
  1. 19 Dec 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 15 Dec 2028Registration valid toHARERA, read 4 Nov 2026
  3. 31 Dec 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1.63 acres in all, by use
  • Apartment buildings0.9 acres · 55%
  • Other usesas the form names them: Landscaping, Green0.46 acres · 28%
  • Roads0.27 acres · 17%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningTo be decided by management
  • KitchenKitchen counter finished with PRE-polished quartz stones. premium modular cabinets along with appropriate finish. hob & chimney WILL be provided.
  • LiftsOnly provision of lift well
  • FloorsImported marble flooring in, master bed room, living,dining,lobby,family lounge MAIN staircase and landing: premium wooden flooring in REST of bedrooms: premium vitrified tiles in kitchen . vetrified tiles in servant room,imported marble in master'S toilet and premium ceramic tiles in REST of the toilets.balconies and utility finished with anti skid ceramic tile flooring.
  • WallsPremium ceramic tiles upto required height in toilets, imported tiles upto 600MM height above kitchen counter.
  • BathroomsPremium sanitary fixtures, premium chrome plated fittings.
  • Windows"window panels of seasoned hardwood/aluminium/ UPVC sections. all hardware in powder coated aluminium. SIZE and section as per design of the architect."
  • Main doorFlush doors - polished/enamel painted; stainless steel/ brass finished hardware fittings for MAIN door & aluminium powder coated hardware fitting and locks of branded makes.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 104, GurugramSector 104, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.6 km
  • Delhi–Gurugram–SNB RRTS4.6 km
  • Sohna Elevated Corridor (NH-248A)5.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is ATS TRIUMPH VILLAS registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1051/783/2026/23. Valid to 15 Dec 2028.

The source ↗
What is the possession timeline for ATS TRIUMPH VILLAS?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2028. Its registration runs to 15 Dec 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ATS TRIUMPH VILLAS?From the records · Map pin and road lines, read 6 Sep 2026

ATS TRIUMPH VILLAS is in Sector 104, Gurugram; the site address declared to HARERA is Village - Dhanwapur, Sector -104, Gurugram. In a straight line it is about 0.6 km from Dwarka Expressway, 4.6 km from Delhi–Gurugram–SNB RRTS and 5.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ATS TRIUMPH VILLAS?From the records · HARERA, read 4 Nov 2026

ATS TRIUMPH VILLAS is a Greatvalue Hpl Infratech project, registered by its company GREATVALUE HPL INFRATECH PRIVATE LIMITED.

The source ↗Greatvalue Hpl Infratech's projects and court record

The records

What the registers hold for ATS TRIUMPH VILLAS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1051/783/2026/23: Registered. Valid to 15 Dec 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 10 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 2 Feb 2020.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 19 Dec 2025, building plans 19 Dec 2025.Declared to HARERA, read 29 Oct 2026
The court record of Greatvalue Hpl Infratech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 10 OF 2012 lapsed

    Named in this project’s application. Valid to 2 Feb 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 25 HARERA files, with the dates we read them
Registration no.
GGM/1051/783/2026/23
Registration valid till
15 Dec 2028
Declared possession
31 Dec 2028

Declared by the promoter to HARERA

Land area
1.63 (Acre) (6,596.38 sq m)
FAR
1.36 proposed
licence
License -1 63 of 2011 (15.07.2027) License -2 10 of 2012 (02.02.2027)
Estimated project cost
₹142.35 crore
Cost of land
₹7.47 crore
Layout plan, declared approved (field 5a)
19 Dec 2025
Building plans, declared approved
19 Dec 2025
Construction to start
1 Jan 2026
Completion declared for
31 Dec 2028
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 4 units · 451.97 sq m carpet · 4 towers
  • Apartment/Shops/Other Buildings · 15 units · 458.93 sq m carpet · 15 towers
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. LICENSE 63 OF 2011 — declared: already been obtained (16 Jul 2011)
  • II. LICENSE 10 OF 2012 — declared: already been obtained (3 Feb 2012)
  • III. ENVIRONMENT CLEARANCE — declared: already been obtained (17 Jun 2013)
  • IV. FOREST NOC — declared: already been obtained (7 Aug 2012)
  • V. PHASING PLAN APPROVAL LETTER — declared: already been obtained (9 Sept 2025)
  • VI. BUILDING PLAN SANCTION LETEER BR-III — declared: already been obtained (19 Dec 2025)
On file with HARERA · 25 files

On file with HARERA (25)

Plans

Site plan

1 file
Approved Site Plan22 Dec 2025

Layout plan

3 files
Phasing Pland Approval Letter16 Dec 2025Approved Phasing Plan16 Dec 2025Latest Layout Plan16 Dec 2025

Zoning plan

1 file
Zoning Plan16 Dec 2025

Demarcation plan

1 file
Demarcation Plan22 Dec 2025

Building plans

4 files
Approved Building Plans, Full Set22 Dec 2025Approved Building Plans, Full Set22 Dec 2025Building Plan Approval Letter19 Dec 2025BR16 Dec 2025

Services

Service plans

1 file
Service Plans on the Layout22 Dec 2025

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule16 Dec 2025

Environment clearance

1 file
Environment Clearance16 Dec 2025

Other NOCs and clearances

2 files
Forest NOC16 Dec 2025AAI NOC16 Dec 2025

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration16 Dec 2025

Sales papers

Allotment and sale agreements

2 files
Draft Allotment Letter6 Mar 2026Gist of the Important Provisions of the Draft Agreement16 Dec 2025

Money

Accounts and finance

5 files
Registration Fee6 Mar 2026CA Certificate on the Application’s Figures6 Mar 2026Non-Default Certificate from a CA6 Mar 2026

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit6 Mar 2026

Other filings

Other filings

1 file
Draft Agrement for Sale16 Dec 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

63 OF 2011 · Greatvalue HPL Infratech · GURGAON-MANESAR

Licence valid to 15 Jul 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

10 OF 2012 · Great Value HPL Infratech · GURGAON-MANESAR

Licence valid to 2 Feb 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Dec 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

63 OF 2011: 19 parcels, 10.4625 acres in all, in Dhanwapur (hadbast 51), tehsil Kadipur.

The licence register prints the same licensed area, 10.46 acres.

  • 27//21/14 kanal
  • 27//228 kanal
  • 27//23/16 kanal
  • rectangle 27, kila 20/14 kanal 8 marla
Show the other 15 parcels
  • 38//107 kanal 10 marla
  • 38//118 kanal
  • 38//128 kanal
  • 38//28 kanal
  • 38//261 kanal 8 marla
  • 38//2710 marla
  • 38//37 kanal 11 marla
  • 38//41 kanal 11 marla
  • 38//84 kanal 8 marla
  • 38//9/22 kanal 18 marla
  • 38//9/32 kanal 10 marla
  • rectangle 38, kila 28/219 marla
  • rectangle 38, kila 13/2/12 kanal 10 marla
  • rectangle 38, kila 13/1/14 kanal 11 marla
  • rectangle 38, kila 9/1/21 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

10 OF 2012: 6 parcels, 3.6313 acres in all, in Dhanwapur (hadbast 51), tehsil Kadipur.

The licence register prints the same licensed area, 3.63 acres.

  • 27//176 kanal 16 marla
  • 27//186 kanal 4 marla
  • 27//197 kanal 7 marla
  • 27//23/22 kanal
Show the other 2 parcels
  • rectangle 27, kila 24/110 marla
  • rectangle 27, kila 24/26 kanal 4 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Dhanwapur (hadbast 51), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 27//21/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan22 Dec 2025

Layout plan

3 files
Phasing Pland Approval Letter16 Dec 2025Approved Phasing Plan16 Dec 2025Latest Layout Plan16 Dec 2025

Building plans

4 files
Approved Building Plans, Full Set22 Dec 2025Approved Building Plans, Full Set22 Dec 2025Building Plan Approval Letter19 Dec 2025BR16 Dec 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (25 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3728 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Greatvalue Hpl Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.