Zara Aavaas-2

by Perfect Buildwell · Sector 104, Gurugram

Not on our price list yet

Possession 15 Aug 2022 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 104, Gurugram0.6 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
645 sq ft
In m²about 60–60 m², as declared
Registered
1 Apr 2019
Registered by
PERFECT BUILDWELL PVT. LTD.the company that filed it, for Perfect Buildwell
Timeline
  1. 3 Jan 2019Layout plan approveddeclared to HARERA, read 1 Oct 2026
  2. 1 Apr 2019Registered with HARERAHARERA, read 4 Nov 2026
  3. 15 Aug 2022Possession, as declareddeclared to HARERA, read 1 Oct 2026
  4. 14 Feb 2024Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

132homes, 645 to 645 sq ft of carpet area
  • Under 1,000 sq ft645 sq ft132

Carpet area per home, as declared to HARERA (read 1 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4,173 m² in all, by use
  • Roads1,315 m² · 32%
  • Apartment buildings1,278 m² · 31%
  • Parking568 m² · 14%
  • Pavements418 m² · 10%
  • Green belts245 m² · 6%
  • Shops and offices195 m² · 5%
  • Electricity sub-station112 m² · 3%
  • Other uses42 m² · 1%

The land-use table of the HARERA application, declared to HARERA, read 1 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenCeramic tiles upto 2 FEET above counter
  • LiftsAs required
  • FloorsVitrified tiles in rooms. ceramics tile in toilets
  • WallsOil bound distemper
  • BathroomsReputed brand CP fittings
  • WindowsAluminium / UPVC for external window. wood WORK in internal door
  • Main doorFlush door
  • Electrical fittingsISI MARK

The developer’s specifications in the HARERA application, declared to HARERA, read 1 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 104, GurugramSector 104, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.6 km
  • Delhi–Gurugram–SNB RRTS4.6 km
  • Sohna Elevated Corridor (NH-248A)5.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Zara Aavaas-2 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/327/59/2019/21, registered on 1 Apr 2019. The register’s record shows an end date of 14 Feb 2024. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for Zara Aavaas-2?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 15 Aug 2022. Its registration runs to 14 Feb 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Zara Aavaas-2?From the records · Map pin and road lines, read 6 Sep 2026

Zara Aavaas-2 is in Sector 104, Gurugram; the site address declared to HARERA is Sector-104, Gurugram. In a straight line it is about 0.6 km from Dwarka Expressway, 4.6 km from Delhi–Gurugram–SNB RRTS and 5.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Zara Aavaas-2?From the records · HARERA, read 4 Nov 2026

Zara Aavaas-2 is a Perfect Buildwell project, registered by its company PERFECT BUILDWELL PVT. LTD..

The source ↗Perfect Buildwell's projects and court record

The records

What the registers hold for Zara Aavaas-2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/327/59/2019/21: Registration lapsed. The register’s record shows an end date of 14 Feb 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 96 OF 2017 is on the DTCP register: Licence lapsed; the register prints its validity to 30 Dec 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 3 Jan 2019.Declared to HARERA, read 1 Oct 2026
The court record of Perfect Buildwell’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 96 OF 2017 lapsed

    Named in this project’s application. Valid to 30 Dec 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 14 Feb 2024. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 48 HARERA files, with the dates we read them
Registration no.
GGM/327/59/2019/21
Registration date
1 Apr 2019
Registration valid till
14 Feb 2024
Declared possession
15 Aug 2022

Declared by the promoter to HARERA

Land area
1.03125 (Acre) (4,173.32 sq m)
FAR
the application prints 227.37, which is not a ratio
licence
12 of 2014 expiry date 9.06.2019, 96 of 2017 expiry date 07.11.2022
Estimated project cost
₹33.42 crore
Cost of land
₹13.94 crore
Layout plan, declared approved (field 5a)
3 Jan 2019
Construction to start
15 Feb 2019
Completion declared for
15 Aug 2022
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 132 units · 59.954 sq m carpet · 4 towers · one flat
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. DRINKING WATER — declared: already been obtained (2 Apr 2018)
  • II. APPROVED ZONING PLAN — declared: already been obtained (10 Nov 2017)
  • III. APPROVED BUILDING PLAN/ SITE PLAN — declared: already been obtained (3 Jan 2019)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (13 Jul 2018)
  • V. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (2 Apr 2018)
  • VI. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (17 Apr 2018)
  • VII. FOREST NOC — declared: already been obtained (18 Sept 2014)
  • VIII. CONSENT TO ESTABLISH — declared: already been obtained (15 Dec 2018)
  • IX. MINING NOC — declared: already been obtained (18 Dec 2018)
  • X. LICENCE — declared: already been obtained (8 Nov 2017)
  • XI. SERVICE PLAN & ESTIMATES — declared: applied for but yet to receive (11 Feb 2019)
  • XII. FIRE SCHEME — declared: yet to file for approval
On file with HARERA · 48 files

On file with HARERA (48)

Plans

Site plan

2 files
Site Plan1 Feb 2019Approved Site Plan1 Feb 2019

Layout plan

3 files
Latest Layout Plan1 Feb 2019Parking Layout1 Feb 2019Layout Plan - S011 Feb 2019

Zoning plan

1 file
Zoning Plan1 Feb 2019

Demarcation plan

1 file
Demarcation Plan1 Feb 2019

Building plans

5 files
Approved Building Plans, Full Set16 Feb 2019Elevation & Section Block 20 to 221 Feb 2019Elevation & Section S-031 Feb 2019

Floor plans

1 file
Floor Plan 20 to 23 -S051 Feb 2019

Services

Sewerage and drainage

4 files
Drain Layout Plan26 Feb 2019Sewer Layout26 Feb 2019Approval for Disposal of STP Into Municipal Sewer1 Feb 2019Approval for STP for Construction1 Feb 2019

Water supply

2 files
Flushing Water Supply Plan26 Feb 2019Drinking Water1 Feb 2019

Electricity

1 file
Electricity1 Feb 2019

Roads

1 file
Road Layout Plan26 Feb 2019

Service plans

1 file
Service Plans on the Layout31 Jan 2019

Approvals and clearances

DTCP licence

2 files
Address Proof of License Holder1 Feb 2019Licence Copy with Land Schedule31 Jan 2019

Environment clearance

1 file
Environment Clearance1 Feb 2019

Fire safety

1 file
Fire Fighting Plan26 Feb 2019

Other NOCs and clearances

3 files
Forest NOC1 Feb 2019Mining NOC1 Feb 2019Consent to Establish Letter1 Feb 2019

Land records

Land records

7 files
Non Encumbrance of Land2 Feb 2019Revenue Record Entry of Licence and Collaboration1 Feb 2019Land Title Search Report1 Feb 2019

Sales papers

Allotment and sale agreements

1 file
Draft Allotment Letter1 Feb 2019

Money

Accounts and finance

6 files
Non-Default Certificate from a CA16 Feb 2019Balance Sheet and Audit Report 20161 Feb 2019Balance Sheet and Audit Report 20151 Feb 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit1 Feb 2019

HARERA’s orders

HARERA’s orders

1 file
Extension No. 20 of 2023 dated 17.07.20235 Sept 2023

Other filings

Other filings

3 files
Gardeb Hydrant Plan26 Feb 2019Area Details Plan Block 20 to 231 Feb 2019Plan and Area Details Commercial 3 - S041 Feb 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

12 OF 2014 · Perfect Buildwell Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 9 Dec 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

96 OF 2017 · PERFECT BUILDWELL PVT. LTD. · GURGAON-MANESAR

Licence valid to 30 Dec 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Feb 2019 · read 1 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

12 OF 2014: 5 parcels, 5 acres in all, in Gurgaon (incompletely identified), tehsil Gurgaon.

The licence register prints the same licensed area, 5 acres.

  • rectangle 6354, kila 6354/2681 bigha 19 biswa
  • rectangle 6356, kila 6356/26912 biswa
  • rectangle 6357, kila 6357/2692 bigha 18 biswa
  • rectangle 6351, kila 6351/26712 biswa
Show the other 1 parcel
  • rectangle 6353, kila 6353/2681 bigha 19 biswa

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

96 OF 2017: 5 parcels, 1.0313 acres in all, in Gurgaon (incompletely identified), tehsil Gurgaon.

The licence register prints the same licensed area, 1.0313 acres.

  • rectangle 6354, kila 6354/268/2min10 biswa
  • rectangle 6356, kila 6356/269/1min3 biswa
  • rectangle 6357, kila 6357/269/2min7 biswa
  • rectangle 6351, kila 6357/267/2min3 biswa
Show the other 1 parcel
  • rectangle 6353, kila 6353/268/1min10 biswa

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gurgaon (incompletely identified), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 6354, kila 6354/268.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,700 per sq ft

Sector 104, collector rates effective 1 Apr 2026, Gurugram tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan1 Feb 2019Approved Site Plan1 Feb 2019

Layout plan

3 files
Latest Layout Plan1 Feb 2019Parking Layout1 Feb 2019Layout Plan - S011 Feb 2019

Building plans

5 files
Approved Building Plans, Full Set16 Feb 2019Elevation & Section Block 20 to 221 Feb 2019Elevation & Section S-031 Feb 2019Plan Section and Area Commercial - S -021 Feb 2019Approval of Building Plan1 Feb 2019

Floor plans

1 file
Floor Plan 20 to 23 -S051 Feb 2019

Among the uploads Bhumiq read from HARERA's page on 1 Oct 2026 (48 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/396 · read 1 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Perfect Buildwell

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.