Skip to content

Commercial Colony

by Eminence Townships India · Sector 112, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 112, Gurugram0.5 km from Dwarka Expressway, in a straight linePrices and what changed
Registered
21 Aug 2017
Registered by
EMINENCE TOWNSHIPS (INDIA) PVT LTDthe company that filed it, for Eminence Townships India
Timeline
  1. 21 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 8 Feb 2018Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2020Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • FloorsVitrified tile

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 112, GurugramSector 112, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.5 km
  • Delhi–Gurugram–SNB RRTS5.0 km
  • Sohna Elevated Corridor (NH-248A)8.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Commercial Colony registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 74 OF 2017, registered on 21 Aug 2017. Ended 31 Dec 2020. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Commercial Colony?From the records · Map pin and road lines, read 6 Sep 2026

Commercial Colony is in Sector 112, Gurugram; the site address declared to HARERA is Sector-112, Bajghera. In a straight line it is about 0.5 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 8.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Commercial Colony?From the records · HARERA, read 4 Nov 2026

Commercial Colony is a Eminence Townships India project, registered by its company EMINENCE TOWNSHIPS (INDIA) PVT LTD.

The source ↗Eminence Townships India's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Commercial Colony: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 74 OF 2017: Registration expired. Ended 31 Dec 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 35 OF 2012 is on the DTCP register, valid to 21 Apr 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 8 Feb 2018, building plans 8 Feb 2018.Declared to HARERA, read 29 Oct 2026
The court record of Eminence Townships India’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2020. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 9 HARERA files, with the dates we read them
Registration no.
74 OF 2017
Registration date
21 Aug 2017
Registration valid till
31 Dec 2020

Declared by the promoter to HARERA

Land area
11634.69 (Sqr/mtrs)
FAR
the application prints 175, which is not a ratio
licence
35 of 2012
Estimated project cost
₹140.71 crore
Cost of land
₹15.39 crore
Layout plan, declared approved (field 5a)
8 Feb 2018
Building plans, declared approved
8 Feb 2018
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 6 · 485 units
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. OCCUPATION CERTIFICATE — declared: already been obtained (11 Jul 2019)
On file with HARERA · 9 files

On file with HARERA (9)

Plans

Site plan

1 file
Approved Site Plan15 Feb 2020

Layout plan

1 file
Latest Layout Plan15 Feb 2020

Building plans

1 file
Approved Building Plans, Full Set15 Feb 2020

Services

Service plans

1 file
Service Plans on the Layout15 Feb 2020

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate18 Oct 2024

DTCP licence

1 file
Licence Copy with Land Schedule15 Feb 2020

Money

Accounts and finance

1 file
Non-Default Certificate from a CA15 Feb 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit15 Feb 2020

HARERA’s orders

HARERA’s orders

1 file
Extension No. HARERA/GGM/REP/RC/74/ 2O17/EXT/100/2019 DATED-12.05.201928 May 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

35 OF 2012 · Eminence Townships (India) Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 21 Apr 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 15 Feb 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

35 OF 2012: 9 parcels, 2.875 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.

The licence register prints the same licensed area, 2.88 acres.

  • 30//17/13 kanal 16 marla
  • 30//17/23 kanal 17 marla
  • 30//18/1/12 kanal 12 marla
  • 30//18/24 kanal 1 marla
Show the other 5 parcels
  • 30//19/15 marla
  • 30//22/1/211 marla
  • 30//23/13 kanal 11 marla
  • 30//24/14 kanal
  • 30//267 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bajghera (hadbast 61), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 30//17/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,24,800 per sq yd

Sector 112, collector rates effective 1 Apr 2026, Gurugram tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan15 Feb 2020

Layout plan

1 file
Latest Layout Plan15 Feb 2020

Building plans

1 file
Approved Building Plans, Full Set15 Feb 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (9 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1030 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Eminence Townships India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.