Key facts

Location
Sector 112, Gurugram0.5 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
8,563–10,241 sq ft
In m²about 796–951 m², as declared
Registered
28 Aug 2017
Registered by
SECTOR -113,GATEVIDA DEVELOPERS PVT.LTD.the company that filed it, for Sector 113 Gatedva Developers
Timeline
  1. 3 Jun 2016Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 28 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Dec 2022Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

397homes, 8,563 to 10,241 sq ft of carpet area
  • 3,000 sq ft and above8,563–10,241 sq ft397

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside24,237 m² in all, by use
  • Other uses7,255 m² · 30%
  • Roads5,155 m² · 21%
  • Parks and playgrounds3,786 m² · 16%
  • Apartment buildings2,952 m² · 12%
  • Parking2,250 m² · 9%
  • Club house1,051 m² · 4%
  • Pavements760 m² · 3%
  • Land for community services, handed to the government573 m² · 2%
  • Green belts457 m² · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenModular switches , stainless steel sink and exhaust fan
  • Kitchen appliancesModular switches , stainless steel sink and exhaust fan
  • WardrobesModular switches
  • FloorsVitrified tile flooring
  • WallsPlastic emulsion paint

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 112, GurugramSector 112, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.5 km
  • Delhi–Gurugram–SNB RRTS5.0 km
  • Sohna Elevated Corridor (NH-248A)8.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is La Vida registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 148 OF 2017, registered on 28 Aug 2017. Ended 31 Dec 2022. The register shows it as: Registration expired.

The source ↗
How is the connectivity around La Vida?From the records · Map pin and road lines, read 6 Sep 2026

La Vida is in Sector 112, Gurugram; the site address declared to HARERA is Village Bajghera Sector-112/113,Gurugram. In a straight line it is about 0.5 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 8.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building La Vida?From the records · HARERA, read 4 Nov 2026

La Vida is a Sector 113 Gatedva Developers project, registered by its company SECTOR -113,GATEVIDA DEVELOPERS PVT.LTD..

The source ↗Sector 113 Gatedva Developers's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for La Vida: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 148 OF 2017: Registration expired. Ended 31 Dec 2022.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 105 OF 2011 is on the DTCP register: Licence ends soon; the register prints its validity to 10 Dec 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 3 Jun 2016, building plans 3 Jun 2016.Declared to HARERA, read 29 Oct 2026
The court record of Sector 113 Gatedva Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2022. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 105 OF 2011 ends soon

    Named in this project’s application. Valid to 10 Dec 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 106 HARERA files, with the dates we read them
Registration no.
148 OF 2017
Registration date
28 Aug 2017
Registration valid till
31 Dec 2022

Declared by the promoter to HARERA

Land area
5.989 (Acre) (24,236.62 sq m)
FAR
1.73 proposed of 1.75 permissible
licence
105 of 2011
Estimated project cost
₹306.59 crore
Cost of land
₹85.31 crore
Layout plan, declared approved (field 5a)
3 Jun 2016
Building plans, declared approved
3 Jun 2016
Declared inventory · 4 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK COMPACT (3-A) · 58 units · 951.43 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK+STUDY (2S-A) · 66 units · 904.015 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK (2-A) · 133 units · 795.535 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK (2-B) · 140 units · 810.045 sq m carpet · one flat
Statutory approvals, as declared · 15

Statutory approvals, as declared

  • I. APPROVAL FROM AOI — declared: already been obtained (13 Feb 2017)
  • II. APPROVAL OF DEMARCATION PLAN — declared: already been obtained (20 Jun 2012)
  • III. PERMISSION FOR JOINT DEVELOPMENT — declared: already been obtained (3 Jul 2012)
  • IV. HARYANA STATE POLLUTION CONTROL BOARD — declared: already been obtained (11 May 2017)
  • V. ENVIORMENT CLEARANCE - MOEF — declared: already been obtained (15 Sept 2016)
  • VI. LC IV — declared: already been obtained (8 Oct 2011)
  • VII. LC IV — declared: already been obtained (10 Jun 2012)
  • VIII. LOI-85 — declared: already been obtained (15 May 2012)
  • IX. LOI-86 — declared: already been obtained (30 Dec 2011)
  • X. LOI-105 — declared: already been obtained (5 Oct 2011)
  • XI. AAI CLEARANCE — declared: already been obtained (27 Jun 2019)
  • XII. FIRE SCHEME — declared: already been obtained (24 Oct 2013)
  • XIII. BR-III — declared: already been obtained (3 Jun 2016)
  • XIV. SERVICE PLAN ESTIMATES — declared: already been obtained (6 Mar 2017)
  • XV. LICENCE 85,86,105 — declared: already been obtained
On file with HARERA · 106 files

On file with HARERA (106)

Plans

Site plan

3 files
Site Plan2 Mar 2020Site Plan31 Jan 2020Approved Site Plan30 Nov 2019

Layout plan

1 file
Latest Layout Plan30 Nov 2019

Zoning plan

1 file
Zoning Plan20 Nov 2019

Demarcation plan

2 files
Approval of Demarcation Plan31 Jan 2020Demarcation Plan30 Nov 2019

Building plans

39 files
Building Plan B1 B6 & Typical Floor First Foor B111 May 2021Building Plan B1 B6 12th and 13th11 May 2021Building Plan B2 B5 12 1311 May 2021

Floor plans

1 file
Greena Area Calculation11 May 2021

Services

Sewerage and drainage

1 file
Storm Water11 May 2021

Water supply

2 files
Master Plan Water Supply Layout11 May 2021Water Assurance30 Jan 2020

Service plans

17 files
Service Plan Approval Letter11 May 2021Service Plan11 May 2021Service Plan11 May 2021

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate13 Aug 2024

Completion certificate (CC)

1 file
Acknowledge Copy-Sbi Bank CC Account2 Mar 2020

DTCP licence

9 files
LC- IV 8.875 Acres11 May 2021LC- IV 10.175 Acres11 May 2021LOI -852 Mar 2020

Environment clearance

3 files
Enviornment Clearance Approval11 May 2021MOEF2 Mar 2020MOEF- Environment Clearance31 Jan 2020

Fire safety

3 files
Fire Scheme Approval11 May 2021Fire Scheme Approval Letter2 Mar 2020NOC for Fire Work30 Jan 2020

Other NOCs and clearances

7 files
Airport Height Clearance11 May 2021Forest NOC11 May 2021Forest NOC11 May 2021

Land records

Land records

2 files
Non-Encumbrance Certificate11 May 2021Revenue Record Entry of Licence and Collaboration21 Nov 2019

Sales papers

Allotment and sale agreements

2 files
Agreement Buyer Agreement of the Project31 Jan 2020Allotment Letter of the Project31 Jan 2020

Money

Accounts and finance

8 files
Cash Flow Statement14 Jun 2021Cash Flow Statement11 May 2021Details of Authorised Signatories to Operate Bank Account11 May 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit2 Mar 2020

Other filings

Other filings

2 files
Rep- II11 May 2021Plan of Action for Completing the Project31 Jan 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

105 OF 2011 · CSN Estates · GURGAON-MANESAR

Licence valid to 10 Dec 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 1 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

105 OF 2011: 25 parcels, 10.175 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.

The licence register prints the same licensed area, 10.18 acres.

  • 15//24/25 kanal 5 marla
  • 16//19/31 kanal 17 marla
  • 16//217 kanal 7 marla
  • 16//22/11 kanal 13 marla
Show the other 21 parcels
  • 16//22/22 kanal
  • 19//1/15 kanal 7 marla
  • 19//1/22 kanal 13 marla
  • 19//10/214 marla
  • 19//10/35 kanal 10 marla
  • 19//11/29 marla
  • 19//2/19 marla
  • 19//2/24 kanal 7 marla
  • 19//2/32 kanal 1 marla
  • 19//9/14 kanal 18 marla
  • 20//2911 marla
  • 20//4/21 kanal 19 marla
  • 20//5/22 kanal 13 marla
  • 20//67 kanal 7 marla
  • 20//74 kanal 4 marla
  • 20//285 marla
  • 20//4/14 kanal 10 marla
  • 20//5/15 kanal 7 marla
  • 15//257 kanal 7 marla
  • 16//22/3/11 kanal 10 marla
  • 16//22/3/21 kanal 5 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bajghera (hadbast 61), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 15//24/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,700 per sq ft

Sector 112, collector rates effective 1 Apr 2026, Gurugram tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan2 Mar 2020Site Plan31 Jan 2020Approved Site Plan30 Nov 2019

Layout plan

1 file
Latest Layout Plan30 Nov 2019

Building plans

39 files
Building Plan B1 B6 & Typical Floor First Foor B111 May 2021Building Plan B1 B6 12th and 13th11 May 2021Building Plan B2 B5 12 1311 May 2021Building Plan B2 B5 B3 B4 Typical11 May 2021Building Plan B3 12 1311 May 2021Building Plan B3 B4 Ground Floor11 May 2021

Floor plans

1 file
Greena Area Calculation11 May 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (106 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/898 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Sector 113 Gatedva Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.