Gurgaon Gateway
by Sector 113 Gatevida Developers · Sector 112, Gurugram
Not on our price list yet
About this project
Key facts
- Location
- Sector 112, Gurugram0.5 km from Dwarka Expressway, in a straight linePrices and what changed
- Registered by
- SECTOR 113 GATEVIDA DEVELOPERS PRIVATE LIMITEDthe company that filed it, for Sector 113 Gatevida Developers
- 2 Apr 2013Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 6 Mar 2016Building plans approveddeclared to HARERA, read 29 Oct 2026
- 14 Sep 2017Registered with HARERAHARERA, read 4 Nov 2026
- 30 Jun 2020Registration valid toHARERA, read 4 Nov 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,000–1,500 sq ft1,320–1,356 sq ft85
- 1,500–2,000 sq ft1,601–1,607 sq ft12
- 3,000 sq ft and above3,026 sq ft2
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit, because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Parks and playgrounds7,211 m² · 44%
- Roads4,196 m² · 26%
- Land for community services, handed to the government1,711 m² · 10%
- Apartment buildings1,109 m² · 7%
- Pavements866 m² · 5%
- Other uses638 m² · 4%
- Green belts481 m² · 3%
- Electricity sub-station68 m² · under 1%
- Parking63 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningTower F-AIR-conditionerfittedinall rooms, tower a- airconditioner fitted in living and dining only
- KitchenVitrified tile flooring, 600MM high tile DADO on walls, stainless steel sink, exhaust fan
- Kitchen appliances• geyser • exhaust fan • stainlesssteelsink
- LiftsBranded lifts
- Wardrobes• not applicable
- FloorsMarble, laminated wood, engineered wood, tiles
- WallsPlasticemulsionpaint, ceramic tile DADO in toilet
- BathroomsVitrified tile flooring, ceramic tile DADO, CP fittings and chinaware
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20250.5 km
- Delhi–Gurugram–SNB RRTS5.0 km
- Sohna Elevated Corridor (NH-248A)8.5 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Emaar India | Same sector | — | — | 31 Mar 2029 | |
No photo of the project on file yet | Experion Developers | Same sector | — | — | 30 Jun 2030 |
No photo of the project on file yet | Experion Developers | Same sector | — | — | 20 Jul 2020 |
| Pareena Builders & Promoters | Same sector | — | — | 31 Mar 2024 | |
| Emaar India | Same sector | Under construction | ₹17,500/sq ft | 30 Nov 2031 | |
La VidaNo photo on file yet | Sector 113 Gatedva Developers | Same sector | — | — | — |
Zara RossaNo photo on file yet | Deluris Buildtech India | Same sector | — | — | 1 Apr 2023 |
No photo of the project on file yet | Experion Developers | Same sector | — | — | 30 Jul 2020 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Gurgaon Gateway registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as 186 OF 2017, registered on 14 Sep 2017. Ended 30 Jun 2020. The register shows it as: Registration expired.
The source ↗How is the connectivity around Gurgaon Gateway?From the records · Map pin and road lines, read 6 Sep 2026
Gurgaon Gateway is in Sector 112, Gurugram; the site address declared to HARERA is Sector 113 Gatevida Developers Private Limited. In a straight line it is about 0.5 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 8.5 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Gurgaon Gateway?From the records · HARERA, read 4 Nov 2026
Gurgaon Gateway is a Sector 113 Gatevida Developers project, registered by its company SECTOR 113 GATEVIDA DEVELOPERS PRIVATE LIMITED.
The source ↗Sector 113 Gatevida Developers's projects and court recordWhat protections do I have as a buyer?General guidance
Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.
The records
What the registers hold for Gurgaon Gateway: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 186 OF 2017: Registration expired. Ended 30 Jun 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 85 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 28 Aug 2026.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 2 Apr 2013, building plans 6 Mar 2016.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 62 HARERA files, with the dates we read them
- Registration no.
- 186 OF 2017
- Registration date
- 14 Sept 2017
- Registration valid till
- 30 Jun 2020
Declared by the promoter to HARERA
- Land area
- 4.038 (Acre) (16,341.21 sq m)
- FAR
- 1.75 proposed of 1.75 permissible
- licence
- 85 OF 2012 UPTO 28th Aug, 2020
- Estimated project cost
- ₹143.40 crore
- Cost of land
- ₹33.85 crore
- Layout plan, declared approved (field 5a)
- 2 Apr 2013
- Building plans, declared approved
- 6 Mar 2016
Declared inventory · 7 types
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 41 units · 122.67 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 44 units · 125.961 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 2 units · 281.08 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 1 unit · 170.874 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 5 units · 149.3 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 7 units · 148.77 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 1 unit · 145.07 sq m carpet · one flat
Statutory approvals, as declared · 8
Statutory approvals, as declared
- I. HEIGHT APPROVAL FROM AAI — declared: already been obtained (13 Dec 2011)
- II. HEIGHT APPROVAL FROM AAI — declared: already been obtained (27 Jun 2019)
- III. BUILDING PLAN APPROVAL FROM DT & CP HARYANA — declared: already been obtained (3 Jun 2016)
- IV. FIRE NOC FROM HARYANA FIRE SERVICE — declared: already been obtained (12 Apr 2017)
- V. FOREST DEPARTMENT CLEARANCE — declared: already been obtained (8 May 2013)
- VI. LOAD SANCTION APPROVAL — declared: already been obtained (28 Jun 2017)
- VII. OCCUPANCY CERTIFICATE — declared: already been obtained (15 Feb 2019)
- VIII. NOC FOR USE OF WATER FOR CONSTRUCTION FROM HUDA — declared: already been obtained (21 Mar 2013)
On file with HARERA · 62 files
On file with HARERA (62)
Plans
Site plan
4 filesLayout plan
1 fileZoning plan
2 filesDemarcation plan
1 fileBuilding plans
5 filesFloor plans
11 filesServices
Sewerage and drainage
1 fileElectricity
2 filesRoads
1 fileService plans
9 filesApprovals and clearances
Occupation certificate (OC)
3 filesDTCP licence
1 fileEnvironment clearance
1 fileFire safety
2 filesOther NOCs and clearances
3 filesLand records
Land records
6 filesSales papers
Allotment and sale agreements
2 filesMoney
Accounts and finance
5 filesThe promoter’s papers
Declarations and affidavits
1 fileOther filings
Other filings
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
85 OF 2012 · CSN Estates (P) Ltd. · GURGAON-MANESAR
Licence valid to 28 Aug 2026
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Dec 2020 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
85 OF 2012: 27 parcels, 8.875 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.
The licence register prints the same licensed area, 8.88 acres.
- 20//11/2/21 marla
- 20//12/25 kanal 19 marla
- 20//13/17 kanal 7 marla
- 20//13/213 marla
Show the other 23 parcels
- 20//14/11 kanal 18 marla
- 20//14/26 marla
- 20//173 kanal 18 marla
- 20//18/17 kanal 3 marla
- 20//18/22 marla
- 20//197 kanal 15 marla
- 20//20/27 marla
- 20//21/1/24 kanal 7 marla
- 20//22/14 kanal 4 marla
- 20//22/23 kanal 16 marla
- 20//23/1/115 marla
- 20//23/1/25 marla
- 20//23/36 kanal 12 marla
- 20//244 kanal 4 marla
- 20//309 marla
- 20//315 marla
- 20//328 marla
- 20//8/4/21 kanal 14 marla
- 20//9/118 marla
- 20//225/2262 kanal 15 marla
- 20//247/11 kanal 9 marla
- 21//25/3/23 marla
- 31//2/13 kanal 7 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Bajghera (hadbast 61), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 20//11/2/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹7,700 per sq ft
Sector 112, collector rates effective 1 Apr 2026, Gurugram tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
4 filesLayout plan
1 fileBuilding plans
5 filesFloor plans
11 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (62 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1429 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Sector 113 Gatevida Developers
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.