Om Apartments

by Pareena Builders & Promoters · Sector 112, Gurugram

Not on our price list yet

Possession 31 Mar 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 112, Gurugram0.5 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
about 588 sq ft
In m²about 54.6 m², the average flat, as declared
Registered
13 May 2019
Registered by
PAREENA BUILDERS & PROMOTERS PVT. LTD.the company that filed it, for Pareena Builders & Promoters
Timeline
  1. 25 Apr 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 13 May 2019Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Mar 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 30 Sep 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside20,335.42 acres in all, by use
  • Other usesas the form names them: Proposed twenty four meters sector road, Aanganbaadi6,225.32 acres · 31%
  • Roads4,115.15 acres · 20%
  • Parks and playgrounds3,133.76 acres · 15%
  • Apartment buildings2,016.78 acres · 10%
  • Parking1,733 acres · 9%
  • Pavements972.8 acres · 5%
  • Sewage and waste treatment792.21 acres · 4%
  • Shops and offices749.09 acres · 4%
  • Green belts215.22 acres · 1%
  • Club house198.32 acres · under 1%
  • Electricity sub-station183.77 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningNot providing
  • KitchenGranite stone worktop, single bowel sink & CP brass sink COCK.
  • Kitchen appliancesNot providing
  • LiftsPassanger / service lift
  • WardrobesNot providing
  • FloorsRooms vitrified floor tiles. kitchen, toilets & balconies ceramic tiles. corridor and stairs KOTA stone.
  • WallsOBD over cement plaster
  • BathroomsWhite WC with plastic sistern, white WASH basin with pillar taps and bath mixer with shower.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 112, GurugramSector 112, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.5 km
  • Delhi–Gurugram–SNB RRTS5.0 km
  • Sohna Elevated Corridor (NH-248A)8.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Om Apartments registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/330/62/2019/24, registered on 13 May 2019. The register’s record shows an end date of 30 Sep 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for Om Apartments?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2024. Its registration runs to 30 Sep 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Om Apartments?From the records · Map pin and road lines, read 6 Sep 2026

Om Apartments is in Sector 112, Gurugram; the site address declared to HARERA is Sector-112, Gurugram. In a straight line it is about 0.5 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 8.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Om Apartments?From the records · HARERA, read 4 Nov 2026

Om Apartments is a Pareena Builders & Promoters project, registered by its company PAREENA BUILDERS & PROMOTERS PVT. LTD..

The source ↗Pareena Builders & Promoters's projects and court record

The records

What the registers hold for Om Apartments: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/330/62/2019/24: Registration lapsed. The register’s record shows an end date of 30 Sep 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 49 OF 2019 is on the DTCP register: Licence lapsed; the register prints its validity to 6 Mar 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 25 Apr 2019, building plans 25 Apr 2019.Declared to HARERA, read 29 Oct 2026
The court record of Pareena Builders & Promoters’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 49 OF 2019 lapsed

    Named in this project’s application. Valid to 6 Mar 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 30 Sep 2025. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 15 HARERA files, with the dates we read them
Registration no.
GGM/330/62/2019/24
Registration date
13 May 2019
Registration valid till
30 Sept 2025
Declared possession
31 Mar 2024

Declared by the promoter to HARERA

Land area
20335.42 (Acre) (as printed; not a plausible area)
FAR
the application prints 227.81, which is not a ratio
licence
LC-3786-Asstt.(AK)-2019/6663 dated 07/03/2019 License No . 49 OF 2019
Estimated project cost
₹162.09 crore
Cost of land
₹36.49 crore
Layout plan, declared approved (field 5a)
25 Apr 2019
Building plans, declared approved
25 Apr 2019
Construction to start
30 Sept 2019
Completion declared for
31 Mar 2024
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 726 units · 39,670.9 sq m carpet · 4 towers · total for 726 flats, about 54.6 m² each
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. ASSURANCE CERTIFICATE OF DHBVN FOR POWER SUPPLY — declared: already been obtained (11 Apr 2019)
  • II. CLARIFICATION LETTER REGARDING APPLICABILITY OF FOREST LAWS ON NON FOREST LAND — declared: already been obtained (11 Jan 2019)
  • III. USE THE HUDA SEWAGE TREATED WATER FOR CONSTRUCTION — declared: already been obtained (9 Apr 2019)
  • IV. HEIGHT CLEARANCE — declared: applied for but yet to receive (11 Apr 2019)
On file with HARERA · 15 files

On file with HARERA (15)

Plans

Site plan

1 file
Approved Site Plan26 Apr 2019

Layout plan

1 file
Latest Layout Plan26 Apr 2019

Zoning plan

1 file
Zoning Plan26 Apr 2019

Demarcation plan

1 file
Demarcation Plan26 Apr 2019

Building plans

2 files
Building Plan15 May 2019Approved Building Plans, Full Set26 Apr 2019

Services

Service plans

1 file
Service Plans on the Layout14 May 2019

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule17 Apr 2019

Land records

Land records

2 files
Super Impose Khasra Plan14 May 2019Revenue Record Entry of Licence and Collaboration19 Apr 2019

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures14 May 2019Non-Default Certificate from a CA17 Apr 2019Cash Flow Statement17 Apr 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit17 Apr 2019

HARERA’s orders

HARERA’s orders

1 file
Extension No. 24 of 2025 dated 02.06.202519 Jun 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

49 OF 2019 · Pareena Builders and Promoters Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 6 Mar 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 30 Apr 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

49 OF 2019: 16 parcels, 5.0257 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.

The licence register prints the same licensed area, 5.025 acres.

  • 39//12/23 kanal 7 marla
  • 39//13/1/2/27 marla
  • 39//13/1/2/36 marla
  • 39//13/1/2/46 marla
Show the other 12 parcels
  • 39//13/23 kanal 2 marla
  • 39//17/1/19 marla
  • 39//17/24 kanal 12 marla
  • 39//188 kanal
  • 39//198 kanal
  • 39//22/13 kanal 16 marla
  • 39//23/13 kanal 16 marla
  • 39//24/1/11 kanal 2 marla
  • 39//24/1/29 marla
  • 38//20/2/1/12 marla 6 sarsai
  • 39//16/1/11 kanal 3 marla 3 sarsai
  • 39//13/1/2/51 kanal 6 marla 1 sarsai

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bajghera (hadbast 61), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 39//12/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,700 per sq ft

Sector 112, collector rates effective 1 Apr 2026, Gurugram tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “OM APARTMENTS”, by M/s Pareena Builders & Promoters Pvt. Ltd., code Gurgaon-0819-001020, approved 2019.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan26 Apr 2019

Layout plan

1 file
Latest Layout Plan26 Apr 2019

Building plans

2 files
Building Plan15 May 2019Approved Building Plans, Full Set26 Apr 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (15 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/584 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pareena Builders & Promoters

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.