Skip to content

Commercial Project

by ROF Housing & Infrastructure · Sector 43, Gurugram

Not on our price list yet

Possession 17 Dec 2019 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 43, Gurugram3.2 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
Carpet area
about 449 sq ft
In m²about 41.8 m², the average flat, as declared
Registered
1 Jan 2018
Registered by
ROF HOUSING AND INFRASTRUCTURE PVT LTDthe company that filed it, for ROF Housing & Infrastructure
Timeline
  1. 1 Jan 2018Registered with HARERAHARERA, read 4 Nov 2026
  2. 17 Dec 2019Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 1 Jan 2021Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside0.488 acres in all, by use
  • Apartment buildings0.262 acres · 54%
  • Roads0.095 acres · 20%
  • Pavements0.087 acres · 18%
  • Parking0.043 acres · 9%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Lifts2- lift- johnston- 13 passenger
  • FloorsStone in common area, granite
  • WallsCement plaster in shops
  • BathroomsSenatory- kohler
  • WindowsToughened fixed glass
  • Electrical fittingsLED lights in common area and basement
  • Water storageOHT and UGT, SMC panel tank OHT

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 43, GurugramSector 43, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS3.2 km
  • Sohna Elevated Corridor (NH-248A)5.2 km
  • Dwarka ExpresswayOpen, 17 Aug 20259.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 4
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Commercial Project registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 03 OF 2018, registered on 1 Jan 2018. Ended 1 Jan 2021. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Commercial Project?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 17 Dec 2019. Its registration runs to 1 Jan 2021; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Commercial Project?From the records · Map pin and road lines, read 6 Sep 2026

Commercial Project is in Sector 43, Gurugram; the site address declared to HARERA is Village Kanhai Sector 43. In a straight line it is about 3.2 km from Delhi–Gurugram–SNB RRTS, 5.2 km from Sohna Elevated Corridor (NH-248A) and 9.2 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Commercial Project?From the records · HARERA, read 4 Nov 2026

Commercial Project is a ROF Housing & Infrastructure project, registered by its company ROF HOUSING AND INFRASTRUCTURE PVT LTD.

The source ↗ROF Housing & Infrastructure's projects and court record

The records

What the registers hold for Commercial Project: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 03 OF 2018: Registration expired. Ended 1 Jan 2021.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 41 OF 2017 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 5 Jul 2022.DTCP, read 3 Nov 2026
The court record of ROF Housing & Infrastructure’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 1 Jan 2021. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 41 OF 2017 validity ended

    Named in this project’s application. Valid to 5 Jul 2022. The register links a completion certificate (LC-IX), dated 6 Jul 2022, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 9 HARERA files, with the dates we read them
Registration no.
03 OF 2018
Registration date
1 Jan 2018
Registration valid till
1 Jan 2021
Declared possession
17 Dec 2019

Declared by the promoter to HARERA

Land area
0.4875 (Acre) (1,972.84 sq m)
FAR
the application prints 178, which is not a ratio
licence
41 of 2017(06.07.2017)
Estimated project cost
₹17.45 crore
Cost of land
₹3.45 crore
Construction to start
1 Jan 2018
Completion declared for
17 Dec 2019
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 70 units · 2,922.75 sq m carpet · 1 tower · total for 70 flats, about 41.8 m² each
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. LETTER OF INTENT — declared: already been obtained (23 Dec 2016)
  • II. LICENSE — declared: already been obtained (6 Jul 2017)
  • III. BUILDING PLAN — declared: already been obtained (14 Dec 2017)
  • IV. FOREST AND ARAVALI NOC — declared: already been obtained (17 Nov 2017)
On file with HARERA · 9 files

On file with HARERA (9)

Plans

Site plan

1 file
Approved Site Plan27 Jan 2020

Layout plan

1 file
Latest Layout Plan27 Jan 2020

Zoning plan

1 file
Zoning Plan27 Jan 2020

Building plans

1 file
Approved Building Plans, Full Set27 Jan 2020

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate27 Mar 2024

Completion certificate (CC)

1 file
Completion Certificate27 Mar 2024

DTCP licence

1 file
Licence Copy with Land Schedule27 Jan 2020

Money

Accounts and finance

1 file
Non-Default Certificate from a CA27 Jan 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit27 Jan 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

41 OF 2017 · Smt. Raj Kumari W/o Sh. J.L. Gugnani · GURGAON-MANESAR

Licence valid to 5 Jul 2022

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 1 Feb 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

41 OF 2017: 4 parcels, 0.4875 acres in all, in Kanehi (hadbast 73), tehsil Wazirabad.

The licence register prints the same licensed area, 0.49 acres.

  • 17//18/26 marla
  • 17//19/2/27 marla
  • 17//22/1/21 kanal 5 marla
  • 17//22/1/22 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Kanehi (hadbast 73), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 17//18/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹3,63,200 per sq yd

Sector 43, collector rates effective 1 Apr 2026, Wazirabad tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan27 Jan 2020

Layout plan

1 file
Latest Layout Plan27 Jan 2020

Building plans

1 file
Approved Building Plans, Full Set27 Jan 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (9 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1228 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on ROF Housing & Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.