Not on our price list yet
Possession 31 Dec 2023 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 50, Gurugram1.9 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Registered by
- ELAN LIMITEDthe company that filed it, for Elan Group
- 27 Apr 2022Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 16 Jun 2027Registration valid toHARERA, read 4 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings1.958 acres · 58%
- Roads0.913 acres · 27%
- Parks and playgrounds0.48 acres · 14%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningAs per DBR in selected spaces.
- Lifts04 lifts
- FloorsStone / tiles in common areas
- WallsCement plaster
- BathroomsChinaware with CP fittings
- WindowsAluminium / MS frame with glass
- Main doorGlass door
- Water storageYes
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)1.9 km
- Delhi–Gurugram–SNB RRTS4.1 km
- Dwarka ExpresswayOpen, 17 Aug 20257.0 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 4
- Registered, no OC or CC yet: 7
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Elan Group | Same sector | — | — | 30 Sep 2025 |
ADVAITNo photo on file yet | Pioneer J. K. Senior Living | Same sector | — | — | 31 Dec 2028 |
No photo of the project on file yet | SS Group | 1.2 kmto its sector’s point | — | — | 30 Sep 2024 |
![]() | Elan Group | 1.2 kmto its sector’s point | New launch | ₹26,500/sq ft | 30 Jun 2033 |
| Godrej Properties | 1.2 kmto its sector’s point | Under construction | ₹20,000/sq ft | 31 Dec 2030 | |
No photo of the project on file yet | S & M Developers | 1.4 kmto its sector’s point | — | — | 31 Dec 2026 |
No photo of the project on file yet | S & M Developers | 1.4 kmto its sector’s point | — | — | 31 Dec 2025 |
No photo of the project on file yet | Spaze Towers | 1.6 kmto its sector’s point | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Elan Paradise registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/584/316/2022/59. Valid to 16 Jun 2027.
The source ↗What is the possession timeline for Elan Paradise?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2023. Its registration runs to 16 Jun 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Elan Paradise?From the records · Map pin and road lines, read 6 Sep 2026
Elan Paradise is in Sector 50, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Adampur, Sub Tehsil- Wazirabad, Sector-50, District Gurugram, Haryana. In a straight line it is about 1.9 km from Sohna Elevated Corridor (NH-248A), 4.1 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Elan Paradise?From the records · HARERA, read 4 Nov 2026
Elan Paradise is a Elan Group project, registered by its company ELAN LIMITED.
The source ↗Elan Group's projects and court recordThe records
What the registers hold for Elan Paradise: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/584/316/2022/59: Registered. Valid to 16 Jun 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 32 OF 2020 is on the DTCP register: Licence lapsed; the register prints its validity to 31 Oct 2020.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 27 Apr 2022, building plans 27 Apr 2022.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Licence 32 OF 2020 lapsed
Named in this project’s application. Valid to 31 Oct 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 52 HARERA files, with the dates we read them
- Registration no.
- GGM/584/316/2022/59
- Registration valid till
- 16 Jun 2027
- Declared possession
- 31 Dec 2023
Declared by the promoter to HARERA
- Land area
- 3.35 (Acre) (13,556.97 sq m)
- FAR
- 1.87 proposed of 1.87 permissible
- licence
- 32 of 2020 and 29 of 2021
- Estimated project cost
- ₹375.73 crore
- Cost of land
- ₹26.03 crore
- Layout plan, declared approved (field 5a)
- 27 Apr 2022
- Building plans, declared approved
- 27 Apr 2022
- Completion declared for
- 31 Dec 2023
Declared inventory · 5 types
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL UNIT · 235 units · 8,318.539 sq m carpet
- APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL KIOSK · 5 units · 67.931 sq m carpet
- APARTMENT/SHOPS/OTHER BUILDINGS Type RESTAURANT · 66 units · 1,807.044 sq m carpet
- APARTMENT/SHOPS/OTHER BUILDINGS Type KIOSK - RESTAURANT · 146 units · 1,336.071 sq m carpet
- APARTMENT/SHOPS/OTHER BUILDINGS Type MULTIPLEX · 5 units · 186.034 sq m carpet
Statutory approvals, as declared · 9
Statutory approvals, as declared
- I. LICENSE -1 (32 OF 2020) — declared: already been obtained (31 Oct 2020)
- II. LICENSE-2 (29 OF 2021 — declared: already been obtained (22 Jun 2021)
- III. BUILDING PLAN - MEMO. NO. ZP-1452/AD(RA)/2022/11460 — declared: already been obtained (27 Apr 2022)
- IV. SEIAA(128)/HR/2021/612 — declared: already been obtained (9 Jul 2021)
- V. FOREST NOC - YN7-FJH-NAGD — declared: already been obtained (1 Mar 2021)
- VI. WATER ASSURANCE - MEMO NO. 169 DATED 10/03/2022 — declared: already been obtained (10 Mar 2022)
- VII. SEWER ASSURANCE- VIDE MEMO NO. GMDASCW/2022/270 DATED 10/03/2022 — declared: already been obtained (10 Mar 2022)
- VIII. GMDA/ DRAINAGE /2022/677 DATED 10/03/2022 — declared: already been obtained (10 Mar 2022)
- IX. MEMO NO. CH 47/DGR/26B DATED 15/03/2022 — declared: already been obtained (15 Mar 2022)
On file with HARERA · 52 files
On file with HARERA (52)
Plans
Site plan
2 filesLayout plan
2 filesZoning plan
1 fileDemarcation plan
1 fileBuilding plans
4 filesFloor plans
8 filesServices
Sewerage and drainage
4 filesWater supply
2 filesRoads
1 fileLandscape and green areas
1 fileService plans
2 filesApprovals and clearances
DTCP licence
3 filesEnvironment clearance
1 fileFire safety
2 filesOther NOCs and clearances
4 filesLand records
Land records
6 filesMoney
Accounts and finance
6 filesThe promoter’s papers
Declarations and affidavits
1 fileHARERA’s orders
HARERA’s orders
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 2 DTCP licences named on the application
32 OF 2020 · ELAN Limited · GURGAON-MANESAR
Licence valid to 31 Oct 2020
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
29 OF 2021 · ELAN Limited · GURGAON-MANESAR
Licence valid to 17 Jun 2027
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 4 May 2022 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the 2 licences
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
32 OF 2020: 3 parcels, 2 acres in all, in Adampur (hadbast 90), tehsil Wazirabad.
The licence register prints the same licensed area, 2 acres.
- 14//12/2min2 kanal
- 14//13min6 kanal
- 14//188 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
29 OF 2021: 8 parcels, 1.35 acres in all, in Adampur (hadbast 90), tehsil Wazirabad.
The licence register prints the same licensed area, 1.35 acres.
- rectangle 12, kila 12/2min2 kanal
- rectangle 13, kila 13min2 kanal
- rectangle 9, kila 9/2/33 kanal 1 marla
- rectangle 9, kila 9/2/49 marla
Show the other 4 parcels
- rectangle 9, kila 9/2/617 marla
- rectangle 9, kila 9/2/217 marla
- rectangle 9, kila 9/2/112 marla
- rectangle 9, kila 9/2/51 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Adampur (hadbast 90), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 14//12/2min.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, commercial property
- ₹2,61,360 per sq yd
this sector, collector rates effective 1 Apr 2026, Wazirabad tehsil. 2 tehsil lists price this sector; this is the higher. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
2 filesBuilding plans
4 filesFloor plans
8 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (52 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1944 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Elan Group
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.




