ORCHID IVY

by S & M Developers · Sector 51, Gurugram

Not on our price list yet

Possession 31 Dec 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 51, Gurugram2.8 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
about 1,356 sq ft
In m²about 126 m², the average flat, as declared
Registered by
M/S ORCHID INFRASTRUCTURE DEVELOPERS PVT. LTD.the company that filed it, for S & M Developers
Timeline
  1. 24 Oct 2017Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 23 Feb 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 31 Dec 2026Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4,153 m² in all, by use
  • Apartment buildings4,153 m² · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningSplit inverter ACS
  • KitchenModular kitchen with SS sink and C.P fittings , ceramic tiles in DDO 2 FT. above granite counter
  • Kitchen appliancesHob and chimney
  • LiftsPassenger elevator- 08 persons
  • FloorsMarble/ vitrified tiles/MATT finish tiles/ anti skid ceramic tiles
  • WallsPOP punning finished with plastic/acrylic emulsion paint /OBD
  • BathroomsSuperior chinaware and C.P fittings
  • Windows4-6 MM thick glass

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 51, GurugramSector 51, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.8 km
  • Delhi–Gurugram–SNB RRTS3.5 km
  • Dwarka ExpresswayOpen, 17 Aug 20257.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 18 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 10
  • Other register states: 6

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is ORCHID IVY registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/597/329/2022/72. Valid to 31 Dec 2026.

The source ↗
What is the possession timeline for ORCHID IVY?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2025. Its registration runs to 31 Dec 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ORCHID IVY?From the records · Map pin and road lines, read 6 Sep 2026

ORCHID IVY is in Sector 51, Gurugram; the site address declared to HARERA is M Block, Mayfield Garden, Sector-51, Gurgaon, Haryana. In a straight line it is about 2.8 km from Sohna Elevated Corridor (NH-248A), 3.5 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ORCHID IVY?From the records · HARERA, read 3 Nov 2026

ORCHID IVY is a S & M Developers project, registered by its company M/S ORCHID INFRASTRUCTURE DEVELOPERS PVT. LTD..

The source ↗S & M Developers's projects and court record

The records

What the registers hold for ORCHID IVY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/597/329/2022/72: Registered. Valid to 31 Dec 2026.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 24 Oct 2017, building plans 23 Feb 2022.Declared to HARERA, read 29 Oct 2026
The court record of S & M Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 31 Dec 2026. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 72 HARERA files, with the dates we read them
Registration no.
GGM/597/329/2022/72
Registration valid till
31 Dec 2026
Declared possession
31 Dec 2025

Declared by the promoter to HARERA

Land area
4152.75 (Sqr/mtrs)
FAR
the application prints 264, which is not a ratio
licence
N/A
Estimated project cost
₹59.83 crore
Cost of land
₹13.77 crore
Layout plan, declared approved (field 5a)
24 Oct 2017
Building plans, declared approved
23 Feb 2022
Construction to start
2 Apr 2022
Completion declared for
31 Dec 2025
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 76 units · 9,572.518 sq m carpet · 19 towers · total for 76 flats, about 126 m² each
Statutory approvals, as declared · 19

Statutory approvals, as declared

  • I. BUILDING PLAN M-727 — declared: already been obtained (22 Feb 2022)
  • II. BUILDING PLAN M-728 — declared: already been obtained (22 Feb 2022)
  • III. BUILDING PLAN M-729 — declared: already been obtained (22 Feb 2022)
  • IV. BUILDING PLAN M-730 — declared: already been obtained (22 Feb 2022)
  • V. BUILDING PLAN M-731 — declared: already been obtained (22 Feb 2022)
  • VI. BUILDING PLAN M-732 — declared: already been obtained (22 Feb 2022)
  • VII. BUILDING PLAN M-733 — declared: already been obtained (22 Feb 2022)
  • VIII. BUILDING PLAN M-734 — declared: already been obtained (22 Feb 2022)
  • IX. BUILDING PLAN M-735 — declared: already been obtained (27 Oct 2021)
  • X. BUILDING PLAN M-736 — declared: already been obtained (6 Dec 2021)
  • XI. BUILDING PLAN M-737 — declared: already been obtained (3 Dec 2021)
  • XII. BUILDING PLAN M-738 — declared: already been obtained (3 Dec 2021)
  • XIII. BUILDING PLAN M-739 — declared: already been obtained (17 Jan 2022)
  • XIV. BUILDING PLAN M-740 — declared: already been obtained (22 Feb 2022)
  • XV. BUILDING PLAN M-741 — declared: already been obtained (22 Feb 2022)
  • XVI. BUILDING PLAN M-742 — declared: already been obtained (23 Feb 2022)
  • XVII. BUILDING PLAN M-743 — declared: already been obtained (14 Mar 2022)
  • XVIII. BUILDING PLAN M-744 — declared: already been obtained (23 Feb 2022)
  • XIX. BUILDING PLAN M-745 — declared: already been obtained (23 Feb 2022)
On file with HARERA · 72 files

On file with HARERA (72)

Plans

Site plan

20 files
727, Site Plan & Floor Plans2 Aug 2022728, Site Plan & Floor Plans2 Aug 2022729, Site Plan & Floor Plans2 Aug 2022

Layout plan

1 file
Latest Layout Plan2 Aug 2022

Zoning plan

1 file
Zoning Plan1 Aug 2022

Demarcation plan

1 file
Demarcation Plan1 Aug 2022

Building plans

40 files
732, Rear Elevation & Section2 Aug 2022727, Front Elevation & Floor Plans2 Aug 2022727, Rear Elevation & Section2 Aug 2022

Services

Service plans

1 file
Service Plans on the Layout26 Feb 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule29 Dec 2021

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration29 Dec 2021

Money

Accounts and finance

3 files
Cash Flow Statement1 Aug 2022Non-Default Certificate from a CA29 Dec 2021CA Certificate on the Application’s Figures29 Dec 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit1 Aug 2022

HARERA’s orders

HARERA’s orders

1 file
Extension No. 01 of 2026 dated 16.01.202619 Jan 2026

Other filings

Other filings

1 file
Court Decree1 Aug 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared N/A. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 28 Feb 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

20 files
727, Site Plan & Floor Plans2 Aug 2022728, Site Plan & Floor Plans2 Aug 2022729, Site Plan & Floor Plans2 Aug 2022730, Site Plan & Floor Plans2 Aug 2022731, Site Plan & Floor Plans2 Aug 2022732, Site Plan & Floor Plans2 Aug 2022

Layout plan

1 file
Latest Layout Plan2 Aug 2022

Building plans

40 files
732, Rear Elevation & Section2 Aug 2022727, Front Elevation & Floor Plans2 Aug 2022727, Rear Elevation & Section2 Aug 2022728, Front Elevation & Floor Plans2 Aug 2022728, Rear Elevation & Section2 Aug 2022729, Front Elevation & Floor Plans2 Aug 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (72 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1824 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on S & M Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.