SS 100
by SS Group · Sector 49, Gurugram
Not on our price list yet
Possession 30 Sep 2024 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 49, Gurugram0.8 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Carpet area
- about 807 sq ft
In m²
about 75 m², the average flat, as declared - Registered by
- SS GROUP PRIVATE LIMITEDthe company that filed it, for SS Group
- 1 Oct 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 17 Aug 2020Registered with HARERAHARERA, read 4 Nov 2026
- 30 Sep 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings2,481 m² · 46%
- Roads1,803 m² · 33%
- Parks and playgrounds1,035 m² · 19%
- Parking79 m² · 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningCentralized chiller
- Lifts1. 7NOS passanger lift 2. 02 NOS service lift 3. 02 NOS escalators
- Floors1.concrete flooring in shops/tenant area. 2.glazed stone in lobbies/corridors 3.tiles in common toilets
- WallsCement plastered with OBD paint in shops/tenant area
- BathroomsStandard fittings & fixtures in common toilets
- WindowsALU/UPVC/plain glass
- Water storageUnderground tank with overhead tank at terrace level for common areas
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)0.8 km
- Delhi–Gurugram–SNB RRTS3.9 km
- Dwarka ExpresswayOpen, 17 Aug 20255.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 5
- Registered, no OC or CC yet: 5
- Other register states: 4
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
![]() | Elan Group | Same sector | New launch | ₹26,500/sq ft | 30 Jun 2033 |
| Godrej Properties | Same sector | Under construction | ₹20,000/sq ft | 31 Dec 2030 | |
No photo of the project on file yet | Experion Developers | 1.1 kmto its sector’s point | — | — | 31 Dec 2032 |
No photo of the project on file yet | St. Patricks Realty | 1.1 kmto its sector’s point | — | — | 30 Jun 2030 |
Commercial ProjectNo photo on file yet | Victory Infraedge | 1.1 kmto its sector’s point | — | — | — |
THE SAAVIRANo photo on file yet | M-city Infrastructure | 1.1 kmto its sector’s point | — | — | 31 Dec 2031 |
Bella Vista-Central Park ResortsNo photo on file yet | Sweta Estates | 1.1 kmto its sector’s point | — | — | 31 Aug 2024 |
No photo of the project on file yet | Elan Group | 1.2 kmto its sector’s point | Under construction | — | 31 Dec 2023 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is SS 100 registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/405/137/2020/21, registered on 17 Aug 2020. The register’s record shows an end date of 30 Sep 2024. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for SS 100?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Sep 2024. Its registration runs to 30 Sep 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around SS 100?From the records · Map pin and road lines, read 6 Sep 2026
SS 100 is in Sector 49, Gurugram; the site address declared to HARERA is Southern Peripheral Road, Vill. Badshahpur,Sector-49, Gurugram, Haryana. In a straight line it is about 0.8 km from Sohna Elevated Corridor (NH-248A), 3.9 km from Delhi–Gurugram–SNB RRTS and 5.8 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building SS 100?From the records · HARERA, read 4 Nov 2026
SS 100 is a SS Group project, registered by its company SS GROUP PRIVATE LIMITED.
The source ↗SS Group's projects and court recordThe records
What the registers hold for SS 100: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/405/137/2020/21: Registration lapsed. The register’s record shows an end date of 30 Sep 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Licence 28 OF 1997, as the developer typed it: no match in the registers searched.Declared to HARERA, read 29 Oct 2026
- Plans approved, as the developer declared: layout plan 1 Oct 2019, building plans 1 Oct 2019.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Registration lapsed
The register’s record shows an end date of 30 Sep 2024. HARERA Gurugram, read 4 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 37 HARERA files, with the dates we read them
- Registration no.
- GGM/405/137/2020/21
- Registration date
- 17 Aug 2020
- Registration valid till
- 30 Sept 2024
- Declared possession
- 30 Sept 2024
Declared by the promoter to HARERA
- Land area
- 1.334 (Acre) (5,398.51 sq m)
- FAR
- the application prints 350, which is not a ratio
- licence
- 28 OF 1997(05-05-24) 29 OF 1997(05-05-24) 30 OF 1997(05-05-24) 31 OF 1997(05-05-24) 32 OF 1997(05-05-24) 33 OF 1997(05-05-24)
- Estimated project cost
- ₹129.35 crore
- Cost of land
- ₹0.31 crore
- Layout plan, declared approved (field 5a)
- 1 Oct 2019
- Building plans, declared approved
- 1 Oct 2019
- Construction to start
- 1 Oct 2020
- Completion declared for
- 30 Sept 2024
Declared inventory · 1 type
Declared inventory
- Apartment/Shops/Other Buildings · 72 units · 5,398.497 sq m carpet · 1 tower · total for 72 flats, about 75 m² each
Statutory approvals, as declared · 4
Statutory approvals, as declared
- I. PERMISSION FOR BENEFIT OF TOD — declared: already been obtained (9 Jan 2019)
- II. ZONING PLAN APPROVAL — declared: already been obtained (9 Jan 2019)
- III. BUILDING PLAN — declared: already been obtained (1 Oct 2019)
- IV. ENVIRONMENT CLEARANCE APPROVAL BASED ON LATEST APPROVED BUILDING PLAN — declared: applied for but yet to receive (11 Sept 2019)
On file with HARERA · 37 files
On file with HARERA (37)
Plans
Site plan
2 filesLayout plan
2 filesZoning plan
2 filesDemarcation plan
1 fileBuilding plans
2 filesServices
Sewerage and drainage
1 fileWater supply
1 fileElectricity
1 fileService plans
3 filesApprovals and clearances
DTCP licence
8 filesOther NOCs and clearances
3 filesLand records
Land records
4 filesSales papers
Allotment and sale agreements
1 fileMoney
Accounts and finance
2 filesThe promoter’s papers
Declarations and affidavits
4 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 6 DTCP licences named on the application
The promoter declared 28 OF 1997. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 29 OF 1997. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 30 OF 1997. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 31 OF 1997. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 32 OF 1997. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 33 OF 1997. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Jun 2020 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
- Collector rate, commercial property
- ₹2,17,800 per sq yd
this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
2 filesBuilding plans
2 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (37 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1387 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on SS Group
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.



