Skip to content

ELAN PARADISE

by Elan Group · Sector 50, Gurugram

Not on our price list yet

Possession 30 Sep 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 50, Gurugram1.9 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
about 375 sq ft
In m²about 34.8 m², the average flat, as declared
Registered by
ELAN LIMITEDthe company that filed it, for Elan Group
Timeline
  1. 10 Feb 2021Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.082 acres in all, by use
  • Apartment buildings1.07 acres · 51%
  • Roads0.773 acres · 37%
  • Parks and playgrounds0.227 acres · 11%
  • Parking0.012 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 50, GurugramSector 50, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)1.9 km
  • Delhi–Gurugram–SNB RRTS4.1 km
  • Dwarka ExpresswayOpen, 17 Aug 20257.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 12 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 7
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is ELAN PARADISE registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/447/179/2021/15. The register’s record shows an end date of 30 Sep 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for ELAN PARADISE?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2025. Its registration runs to 30 Sep 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ELAN PARADISE?From the records · Map pin and road lines, read 6 Sep 2026

ELAN PARADISE is in Sector 50, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Adampur, Sub Tehsil- Wazirabad, Sector-50, District Gurugram, Haryana. In a straight line it is about 1.9 km from Sohna Elevated Corridor (NH-248A), 4.1 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ELAN PARADISE?From the records · HARERA, read 4 Nov 2026

ELAN PARADISE is a Elan Group project, registered by its company ELAN LIMITED.

The source ↗Elan Group's projects and court record

The records

What the registers hold for ELAN PARADISE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/447/179/2021/15: Registration lapsed. The register’s record shows an end date of 30 Sep 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 32 OF 2020 is on the DTCP register: Licence lapsed; the register prints its validity to 31 Oct 2020.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 10 Feb 2021, building plans 10 Feb 2021.Declared to HARERA, read 29 Oct 2026
The court record of Elan Group’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 32 OF 2020 lapsed

    Named in this project’s application. Valid to 31 Oct 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 30 Sep 2025. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 63 HARERA files, with the dates we read them
Registration no.
GGM/447/179/2021/15
Registration valid till
30 Sept 2025
Declared possession
30 Sept 2025

Declared by the promoter to HARERA

Land area
2 (Acre) (8,093.71 sq m)
FAR
1.87 proposed of 1.87 permissible
licence
32 of 2020 dated 31/10/2020 by TCP
Estimated project cost
₹199.43 crore
Cost of land
₹43.96 crore
Layout plan, declared approved (field 5a)
10 Feb 2021
Building plans, declared approved
10 Feb 2021
Construction to start
30 Sept 2021
Completion declared for
30 Sept 2025
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 247 units · 8,603.32 sq m carpet · 1 tower · total for 247 flats, about 34.8 m² each
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. FOREST NOC — declared: already been obtained (1 Mar 2021)
  • II. ZONING PLAN DRG NO. DTCP 7581 — declared: already been obtained (2 Nov 2020)
  • III. WATER NOC MEMO 68 — declared: already been obtained (28 Jan 2021)
  • IV. ELECTRICAL LOAD AVAILABLITY MEMO NO. CH. /DGR-26B DATED 4/2/2021 — declared: already been obtained (4 Feb 2021)
  • V. BUILDING PLAN MEMO NO. 2P-1452/AD(RA)/20213372 — declared: already been obtained (10 Feb 2021)
  • VI. LICENSE 32 OF 2020, — declared: already been obtained (10 Oct 2020)
  • VII. SEWAGE DISPOSAL MEMO NO. GMDASCW/2021/218 — declared: already been obtained (23 Feb 2021)
  • VIII. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (23 Feb 2021)
On file with HARERA · 63 files

On file with HARERA (63)

Plans

Site plan

8 files
Site Plan for Drainage Layout-Model30 Mar 2021Site Plan for GH & Flushing Layout-Model30 Mar 2021Site Plan for Road Layout-Model30 Mar 2021

Layout plan

1 file
Latest Layout Plan12 Feb 2021

Zoning plan

1 file
Zoning Plan8 Mar 2021

Demarcation plan

1 file
Demarcation Plan8 Mar 2021

Building plans

6 files
Approval of Building Plan8 Mar 2021BR III8 Mar 2021Elevation8 Mar 2021

Floor plans

4 files
Basement Area & Calc8 Mar 2021Basement Area-2 Plan Cal8 Mar 2021Basement Plan -18 Mar 2021Basement -2 Plan8 Mar 2021

Services

Sewerage and drainage

1 file
Assurance Sewage Connection8 Mar 2021

Service plans

3 files
Service Estimate Report30 Mar 2021Service Plan Applied Application22 Mar 2021Service Plans on the Layout12 Feb 2021

Approvals and clearances

DTCP licence

3 files
Licence Copy with Land Schedule8 Feb 2021LC IV and LC IV-D8 Feb 2021LC IV-D8 Feb 2021

Environment clearance

1 file
EC Application Acknowledgment8 Mar 2021

Fire safety

1 file
Site Plan for Fire Layout-Model30 Mar 2021

Other NOCs and clearances

2 files
Electrical Load NOC9 Feb 2021Water NOC9 Feb 2021

Land records

Land records

6 files
Revenue Record Entry of Licence and Collaboration8 Feb 2021Collaboration Agreement8 Feb 2021Sale Deed8 Feb 2021

Sales papers

Allotment and sale agreements

2 files
Allotment Letter-Sec-508 Mar 2021RERA BBA Sec-508 Mar 2021

Money

Accounts and finance

8 files
Balance Sheet 2019-20208 Mar 2021Bank Under Taking8 Mar 2021Non-Default Certificate from a CA8 Mar 2021

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit22 Mar 2021Builder Affidavit8 Mar 2021

Other filings

Other filings

13 files
F Th Plan8 Mar 2021Ff Area Plan Cal8 Mar 2021Ff Plan Cal8 Mar 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

32 OF 2020 · ELAN Limited · GURGAON-MANESAR

Licence valid to 31 Oct 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 12 Feb 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

32 OF 2020: 3 parcels, 2 acres in all, in Adampur (hadbast 90), tehsil Wazirabad.

The licence register prints the same licensed area, 2 acres.

  • 14//12/2min2 kanal
  • 14//13min6 kanal
  • 14//188 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Adampur (hadbast 90), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 14//12/2min.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

8 files
Site Plan for Drainage Layout-Model30 Mar 2021Site Plan for GH & Flushing Layout-Model30 Mar 2021Site Plan for Road Layout-Model30 Mar 2021Site Plan for Sewer Layout-Model30 Mar 2021Site Plan for Water Supply Layout-Model30 Mar 2021Superimposed Plan22 Mar 2021

Layout plan

1 file
Latest Layout Plan12 Feb 2021

Building plans

6 files
Approval of Building Plan8 Mar 2021BR III8 Mar 2021Elevation8 Mar 2021ELEVATION28 Mar 2021Sections8 Mar 2021Approved Building Plans, Full Set12 Feb 2021

Floor plans

4 files
Basement Area & Calc8 Mar 2021Basement Area-2 Plan Cal8 Mar 2021Basement Plan -18 Mar 2021Basement -2 Plan8 Mar 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (63 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1549 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Elan Group

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.