HANU RESIDENCY

by Pareena Infrastructures · Sector 68, Gurugram

Not on our price list yet

Possession 31 May 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 68, Gurugram0.3 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
376–646 sq ft
In m²about 35–60 m², as declared
Registered by
PAREENA INFRASTRUCTURES PVT. LTD.the company that filed it, for Pareena Infrastructures
Timeline
  1. 3 Jan 2023Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 May 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

1,390homes, 376 to 646 sq ft of carpet area
  • Under 1,000 sq ft376–646 sq ft1,390

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside40,560 m² in all, by use
  • Roads16,559 m² · 41%
  • Land for community services, handed to the government8,094 m² · 20%
  • Parks and playgrounds5,237 m² · 13%
  • Apartment buildings4,143 m² · 10%
  • Other usesas the form names them: Renewable, Parking3,687 m² · 9%
  • Shops and offices2,422 m² · 6%
  • Electricity sub-station418 m² · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenProvided (as per drawings)
  • LiftsProvided (johnson'S or equivalent)
  • FloorsCeramic tiles (kajaria, somany or equivalent)
  • WallsWhite/colour WASH (standard make)
  • BathroomsCP fittings (hindware or equivalent)
  • WindowsMS Z section (standard make)
  • Main doorFlush doors with enamel paint
  • Water storageOverhead water tank

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 68, GurugramSector 68, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20255.7 km
  • Delhi–Gurugram–SNB RRTS5.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is HANU RESIDENCY registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/728/460/2023/72. Valid to 31 May 2027.

The source ↗
What is the possession timeline for HANU RESIDENCY?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 May 2027. Its registration runs to 31 May 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around HANU RESIDENCY?From the records · Map pin and road lines, read 6 Sep 2026

HANU RESIDENCY is in Sector 68, Gurugram; the site address declared to HARERA is Hanu Residency Badshahpur Aklimpur Road, Sector-68,. In a straight line it is about 0.3 km from Sohna Elevated Corridor (NH-248A), 5.7 km from Dwarka Expressway and 5.7 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building HANU RESIDENCY?From the records · HARERA, read 4 Nov 2026

HANU RESIDENCY is a Pareena Infrastructures project, registered by its company PAREENA INFRASTRUCTURES PVT. LTD..

The source ↗Pareena Infrastructures's projects and court record

The records

What the registers hold for HANU RESIDENCY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/728/460/2023/72: Registered. Valid to 31 May 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 3 Jan 2023, building plans 3 Jan 2023.Declared to HARERA, read 29 Oct 2026
The court record of Pareena Infrastructures’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 55 HARERA files, with the dates we read them
Registration no.
GGM/728/460/2023/72
Registration valid till
31 May 2027
Declared possession
31 May 2027

Declared by the promoter to HARERA

Land area
10.02847 (Acre) (40,583.78 sq m)
FAR
the application prints 236.99, which is not a ratio
licence
License granted by DTCP, Haryana Endst. No.LC-4504-JE.(VA)-2022/15626 Dated 06.06.2022
Estimated project cost
₹415.15 crore
Cost of land
₹111.87 crore
Layout plan, declared approved (field 5a)
3 Jan 2023
Building plans, declared approved
3 Jan 2023
Construction to start
1 Oct 2023
Completion declared for
31 May 2027
Declared inventory · 5 types

Declared inventory

  • Apartment/Shops/Other Buildings · 577 units · 60 sq m carpet · 6 towers · one flat
  • Apartment/Shops/Other Buildings · 487 units · 60 sq m carpet · 6 towers · one flat
  • Apartment/Shops/Other Buildings · 70 units · 60 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 128 units · 34.92 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 128 units · 35.54 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. BUILDING PLAN BR-III VIDE MEMO NO. ZP-1591/JD(RA)/2022/224 — declared: already been obtained (3 Jan 2023)
  • II. ASSURANCE FOR CONSTRUCTION WATER SUPPLY — declared: already been obtained (26 Jul 2022)
  • III. ASSURANCE FOR DOMESTIC WATER SUPPLY — declared: already been obtained (4 Aug 2022)
  • IV. ZONING PLAN VIDE DRG NO. DTCP 8373 — declared: already been obtained (6 Jun 2022)
On file with HARERA · 55 files

On file with HARERA (55)

Plans

Site plan

3 files
Site Plan18 Jan 2023Af-Ar-04 Site Plan Green18 Jan 2023Approved Site Plan18 Jan 2023

Layout plan

2 files
Latest Layout Plan18 Jan 2023Af-Pl-1 Site Layout Public Health18 Jan 2023

Zoning plan

1 file
Zoning Plan11 Jul 2023

Building plans

7 files
Af-Ar-20 Commercial-1 Elevations & Section18 Jan 2023Af-Ar-8 Tower-1 2 Elevation and Section18 Jan 2023Af-Ar-11 Tower-3,4,7,8 Elevation and Section18 Jan 2023

Floor plans

10 files
Af-Ar-18 Commercial-1 Floor Plan18 Jan 2023Af-Ar-15 Tower-6 Floor Plan18 Jan 2023Af-Ar-09 Tower-3,4,7,8 Floor Plan18 Jan 2023

Services

Sewerage and drainage

2 files
Storm Water Layout11 Jul 2023Sewer Layout11 Jul 2023

Water supply

5 files
Irrigation Layout11 Jul 2023Assurance for Treated Water 50KLD11 Jul 2023Assurance for Water Supply11 Jul 2023

Electricity

1 file
Load Assurance DHBVN11 Jul 2023

Roads

1 file
Road Layout11 Jul 2023

Service plans

2 files
Service Estimate11 Jul 2023Service Plans on the Layout18 Jan 2023

Approvals and clearances

DTCP licence

2 files
Licence Copy with Land Schedule11 Jul 2023LC-III (Letter of Intent)11 Jul 2023

Fire safety

1 file
Fire Layout11 Jul 2023

Other NOCs and clearances

1 file
Revised Forest NOC11 Jul 2023

Land records

Land records

8 files
Jamabandi Mutation PART111 Jul 2023Jamabandi 28.02.202211 Jul 2023Jamabandi 10.05.202311 Jul 2023

Sales papers

Payment plan

2 files
Allotment Letter (Revised Payment Plan)11 Jul 2023BBA Hanu (Revised Payment Plan)11 Jul 2023

Money

Accounts and finance

3 files
Cash Flow Statement11 Jul 2023Project Report11 Jul 2023Non-Default Certificate from a CA23 Dec 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit11 Jul 2023

Other filings

Other filings

3 files
BR-III Hanu11 Jul 2023Af-Ar-21 Commercial-218 Jan 2023Af-Ar-19 Commercial-1 Area Detail18 Jan 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared License granted by DTCP, Haryana Endst. No.LC-4504-JE.(VA)-2022/15626 Dated 06.06.2022. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 26 Apr 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Hanu Residency”, by M/s Pareena Infrastructure Pvt. Ltd., code Gurgaon-0923-004211, approved 2023.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan18 Jan 2023Af-Ar-04 Site Plan Green18 Jan 2023Approved Site Plan18 Jan 2023

Layout plan

2 files
Latest Layout Plan18 Jan 2023Af-Pl-1 Site Layout Public Health18 Jan 2023

Building plans

7 files
Af-Ar-20 Commercial-1 Elevations & Section18 Jan 2023Af-Ar-8 Tower-1 2 Elevation and Section18 Jan 2023Af-Ar-11 Tower-3,4,7,8 Elevation and Section18 Jan 2023Af-Ar-14 Tower-5 Section18 Jan 2023Af-Ar-13 Tower-5 Elevation18 Jan 2023Af-Ar-16 Tower-6 Elevation18 Jan 2023Af-Ar-17 Tower-6 Section18 Jan 2023

Floor plans

10 files
Af-Ar-18 Commercial-1 Floor Plan18 Jan 2023Af-Ar-15 Tower-6 Floor Plan18 Jan 2023Af-Ar-09 Tower-3,4,7,8 Floor Plan18 Jan 2023Af-Ar-06 Tower-1 2 Floor Plan18 Jan 2023Af-Ar-07 Tower-1 2 Floor Plan18 Jan 2023Af-Ar-02 Site Parking Plan18 Jan 2023

Payment plan

2 files
Allotment Letter (Revised Payment Plan)11 Jul 2023BBA Hanu (Revised Payment Plan)11 Jul 2023

source: https://haryanarera.gov.in/view_project/project_preview_open/2255 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pareena Infrastructures

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.