HANU RESIDENCY
by Pareena Infrastructures · Sector 68, Gurugram
Not on our price list yet
Possession 31 May 2027 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 68, Gurugram0.3 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Registered by
- PAREENA INFRASTRUCTURES PVT. LTD.the company that filed it, for Pareena Infrastructures
- 3 Jan 2023Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 May 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft376–646 sq ft1,390
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads16,559 m² · 41%
- Land for community services, handed to the government8,094 m² · 20%
- Parks and playgrounds5,237 m² · 13%
- Apartment buildings4,143 m² · 10%
- Other usesas the form names them: Renewable, Parking3,687 m² · 9%
- Shops and offices2,422 m² · 6%
- Electricity sub-station418 m² · 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenProvided (as per drawings)
- LiftsProvided (johnson'S or equivalent)
- FloorsCeramic tiles (kajaria, somany or equivalent)
- WallsWhite/colour WASH (standard make)
- BathroomsCP fittings (hindware or equivalent)
- WindowsMS Z section (standard make)
- Main doorFlush doors with enamel paint
- Water storageOverhead water tank
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)0.3 km
- Dwarka ExpresswayOpen, 17 Aug 20255.7 km
- Delhi–Gurugram–SNB RRTS5.7 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 3
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Pareena Infrastructures | Same sector | — | — | 11 Mar 2024 | |
Orion GalaxyNo photo on file yet | Soni Infratech | Same sector | — | — | — |
No photo of the project on file yet | Supertech | Same sector | — | — | — |
M3M FLORA68No photo on file yet | Hans Propcon | Same sector | — | — | 30 Jun 2026 |
M3M Marina/M3M Sierra 68No photo on file yet | Hans Propcon | Same sector | — | — | — |
No photo of the project on file yet | Tulip Infratech | 1.1 kmto its sector’s point | — | — | 6 Feb 2019 |
No photo of the project on file yet | Ocean Seven Buildtech | 1.1 kmto its sector’s point | — | — | 13 Feb 2023 |
TRUMP RESIDENCES GURGAONNo photo on file yet | Riverday Infrastructure | 1.1 kmto its sector’s point | — | — | 30 Apr 2033 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is HANU RESIDENCY registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/728/460/2023/72. Valid to 31 May 2027.
The source ↗What is the possession timeline for HANU RESIDENCY?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 May 2027. Its registration runs to 31 May 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around HANU RESIDENCY?From the records · Map pin and road lines, read 6 Sep 2026
HANU RESIDENCY is in Sector 68, Gurugram; the site address declared to HARERA is Hanu Residency Badshahpur Aklimpur Road, Sector-68,. In a straight line it is about 0.3 km from Sohna Elevated Corridor (NH-248A), 5.7 km from Dwarka Expressway and 5.7 km from Delhi–Gurugram–SNB RRTS.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building HANU RESIDENCY?From the records · HARERA, read 4 Nov 2026
HANU RESIDENCY is a Pareena Infrastructures project, registered by its company PAREENA INFRASTRUCTURES PVT. LTD..
The source ↗Pareena Infrastructures's projects and court recordThe records
What the registers hold for HANU RESIDENCY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/728/460/2023/72: Registered. Valid to 31 May 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: layout plan 3 Jan 2023, building plans 3 Jan 2023.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 55 HARERA files, with the dates we read them
- Registration no.
- GGM/728/460/2023/72
- Registration valid till
- 31 May 2027
- Declared possession
- 31 May 2027
Declared by the promoter to HARERA
- Land area
- 10.02847 (Acre) (40,583.78 sq m)
- FAR
- the application prints 236.99, which is not a ratio
- licence
- License granted by DTCP, Haryana Endst. No.LC-4504-JE.(VA)-2022/15626 Dated 06.06.2022
- Estimated project cost
- ₹415.15 crore
- Cost of land
- ₹111.87 crore
- Layout plan, declared approved (field 5a)
- 3 Jan 2023
- Building plans, declared approved
- 3 Jan 2023
- Construction to start
- 1 Oct 2023
- Completion declared for
- 31 May 2027
Declared inventory · 5 types
Declared inventory
- Apartment/Shops/Other Buildings · 577 units · 60 sq m carpet · 6 towers · one flat
- Apartment/Shops/Other Buildings · 487 units · 60 sq m carpet · 6 towers · one flat
- Apartment/Shops/Other Buildings · 70 units · 60 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 128 units · 34.92 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 128 units · 35.54 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 4
Statutory approvals, as declared
- I. BUILDING PLAN BR-III VIDE MEMO NO. ZP-1591/JD(RA)/2022/224 — declared: already been obtained (3 Jan 2023)
- II. ASSURANCE FOR CONSTRUCTION WATER SUPPLY — declared: already been obtained (26 Jul 2022)
- III. ASSURANCE FOR DOMESTIC WATER SUPPLY — declared: already been obtained (4 Aug 2022)
- IV. ZONING PLAN VIDE DRG NO. DTCP 8373 — declared: already been obtained (6 Jun 2022)
On file with HARERA · 55 files
On file with HARERA (55)
Plans
Site plan
3 filesLayout plan
2 filesZoning plan
1 fileBuilding plans
7 filesFloor plans
10 filesServices
Sewerage and drainage
2 filesWater supply
5 filesElectricity
1 fileRoads
1 fileService plans
2 filesApprovals and clearances
DTCP licence
2 filesFire safety
1 fileOther NOCs and clearances
1 fileLand records
Land records
8 filesSales papers
Payment plan
2 filesMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileOther filings
Other filings
3 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared License granted by DTCP, Haryana Endst. No.LC-4504-JE.(VA)-2022/15626 Dated 06.06.2022. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 26 Apr 2023 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Lenders that list this project
PNB Housing Finance’s approved-projects list carries “Hanu Residency”, by M/s Pareena Infrastructure Pvt. Ltd., code Gurgaon-0923-004211, approved 2023.
PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗
A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
3 filesLayout plan
2 filesBuilding plans
7 filesFloor plans
10 filesPayment plan
2 filessource: https://haryanarera.gov.in/view_project/project_preview_open/2255 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Pareena Infrastructures
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.