Orion Galaxy
by Soni Infratech · Sector 68, Gurugram
Not on our price list yet
About this project
Key facts
- Location
- Sector 68, Gurugram0.3 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Registered by
- SONI INFRATECH PRIVATE LIMITEDthe company that filed it, for Soni Infratech
- 2 May 2017Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 28 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
- 31 Dec 2023Registration valid toHARERA, read 4 Nov 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft721–999 sq ft250
- 1,000–1,500 sq ft1,019–1,483 sq ft354
- 1,500–2,000 sq ft1,533–1,990 sq ft48
- 2,000–2,500 sq ft2,006–2,362 sq ft12
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- KitchenFloor tile/green marble counter/paint
- Kitchen appliancesCERA/somany
- LiftsUplift/KONE/thyson/johnson
- WardrobesPaint
- FloorsVitrified tile/granite
- WallsPaint
- BathroomsESS/ZIM
- WindowsAluminium jindal
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)0.3 km
- Dwarka ExpresswayOpen, 17 Aug 20255.7 km
- Delhi–Gurugram–SNB RRTS5.7 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Pareena Infrastructures | Same sector | — | — | 11 Mar 2024 | |
| Pareena Infrastructures | Same sector | — | — | 31 May 2027 | |
No photo of the project on file yet | Supertech | Same sector | — | — | — |
M3M FLORA68No photo on file yet | Hans Propcon | Same sector | — | — | 30 Jun 2026 |
M3M Marina/M3M Sierra 68No photo on file yet | Hans Propcon | Same sector | — | — | — |
No photo of the project on file yet | Tulip Infratech | 1.1 kmto its sector’s point | — | — | 6 Feb 2019 |
No photo of the project on file yet | Ocean Seven Buildtech | 1.1 kmto its sector’s point | — | — | 13 Feb 2023 |
TRUMP RESIDENCES GURGAONNo photo on file yet | Riverday Infrastructure | 1.1 kmto its sector’s point | — | — | 30 Apr 2033 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is Orion Galaxy registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as 100 OF 2017, registered on 28 Aug 2017. The register’s record shows an end date of 31 Dec 2023. The register shows it as: Registration lapsed.
The source ↗How is the connectivity around Orion Galaxy?From the records · Map pin and road lines, read 6 Sep 2026
Orion Galaxy is in Sector 68, Gurugram; the site address declared to HARERA is Village Badshahpur, Sector 68. In a straight line it is about 0.3 km from Sohna Elevated Corridor (NH-248A), 5.7 km from Dwarka Expressway and 5.7 km from Delhi–Gurugram–SNB RRTS.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Orion Galaxy?From the records · HARERA, read 4 Nov 2026
Orion Galaxy is a Soni Infratech project, registered by its company SONI INFRATECH PRIVATE LIMITED.
The source ↗Soni Infratech's projects and court recordWhat protections do I have as a buyer?General guidance
Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.
The records
What the registers hold for Orion Galaxy: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 100 OF 2017: Registration lapsed. The register’s record shows an end date of 31 Dec 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 67 OF 2010 is on the DTCP register: Licence lapsed; the register prints its validity to 30 Aug 2018.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 2 May 2017, building plans 2 May 2017.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 12 HARERA files, with the dates we read them
- Registration no.
- 100 OF 2017
- Registration date
- 28 Aug 2017
- Registration valid till
- 31 Dec 2023
Declared by the promoter to HARERA
- Land area
- 12.281 (Acre) (49,699.44 sq m)
- FAR
- the application prints 174.9, which is not a ratio
- licence
- 67 of 2010 DATED 31.08.2010
- Estimated project cost
- ₹496.63 crore
- Cost of land
- ₹47.33 crore
- Layout plan, declared approved (field 5a)
- 2 May 2017
- Building plans, declared approved
- 2 May 2017
Declared inventory · 33 types
Declared inventory — 33 types declared, first 8 shown
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 8 units · 102.22 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY · 24 units · 113.38 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT · 56 units · 113.56 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+SERVENT · 18 units · 115.29 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+SERVENT · 8 units · 116.49 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT · 46 units · 118.24 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT · 4 units · 119.69 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT · 12 units · 121.49 sq m carpet · one flat
Statutory approvals, as declared · 13
Statutory approvals, as declared
- I. SEWAGE TREATMENT SUPPLY — declared: already been obtained (8 Aug 2018)
- II. ENVIRNMENT CLEARANCE — declared: already been obtained (14 Sept 2011)
- III. AIRPORT AUTHORITY — declared: already been obtained (9 Jun 2011)
- IV. FOREST — declared: already been obtained (21 Oct 2011)
- V. POLLUTION — declared: already been obtained (20 Jun 2018)
- VI. APPROVED BUILDING PLAN — declared: already been obtained (2 May 2017)
- VII. LICENCE — declared: already been obtained (30 Aug 2010)
- VIII. MINING — declared: already been obtained (10 Aug 2011)
- IX. FIRE — declared: already been obtained (2 Sept 2011)
- X. ELECTRICAL LOAD — declared: already been obtained (12 Jul 2013)
- XI. HUDA CONSTRUCTION WATER — declared: already been obtained (8 Aug 2018)
- XII. DRINKING WATER SUPPLY — declared: already been obtained (8 Aug 2018)
- XIII. LICENCE RENEWAL APPLIED — declared: applied for but yet to receive (30 Aug 2018)
On file with HARERA · 12 files
On file with HARERA (12)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
DTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
67 OF 2010 · Soni Infratech · GURGAON-MANESAR
Licence valid to 30 Aug 2018
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 14 Feb 2020 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
67 OF 2010
DTCP’s page showed no land schedule for licence 67 OF 2010 when Bhumiq read it on 18 Oct 2026. verify at source
- Collector rate, residential flat
- ₹6,400 per sq ft
this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (12 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1215 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Soni Infratech
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.