Orion Galaxy

by Soni Infratech · Sector 68, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 68, Gurugram0.3 km from Sohna Elevated Corridor (NH-248A), in a straight line
Home types
2, 3 and 4 BHK
Carpet area
721–2,362 sq ft
In m²about 67–219 m², as declared
Registered
28 Aug 2017
Registered by
SONI INFRATECH PRIVATE LIMITEDthe company that filed it, for Soni Infratech
Timeline
  1. 2 May 2017Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 28 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Dec 2023Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

664homes, 721 to 2,362 sq ft of carpet area
  • Under 1,000 sq ft721–999 sq ft250
  • 1,000–1,500 sq ft1,019–1,483 sq ft354
  • 1,500–2,000 sq ft1,533–1,990 sq ft48
  • 2,000–2,500 sq ft2,006–2,362 sq ft12

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenFloor tile/green marble counter/paint
  • Kitchen appliancesCERA/somany
  • LiftsUplift/KONE/thyson/johnson
  • WardrobesPaint
  • FloorsVitrified tile/granite
  • WallsPaint
  • BathroomsESS/ZIM
  • WindowsAluminium jindal

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 68, GurugramSector 68, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20255.7 km
  • Delhi–Gurugram–SNB RRTS5.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Orion Galaxy registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 100 OF 2017, registered on 28 Aug 2017. The register’s record shows an end date of 31 Dec 2023. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around Orion Galaxy?From the records · Map pin and road lines, read 6 Sep 2026

Orion Galaxy is in Sector 68, Gurugram; the site address declared to HARERA is Village Badshahpur, Sector 68. In a straight line it is about 0.3 km from Sohna Elevated Corridor (NH-248A), 5.7 km from Dwarka Expressway and 5.7 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Orion Galaxy?From the records · HARERA, read 4 Nov 2026

Orion Galaxy is a Soni Infratech project, registered by its company SONI INFRATECH PRIVATE LIMITED.

The source ↗Soni Infratech's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Orion Galaxy: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 100 OF 2017: Registration lapsed. The register’s record shows an end date of 31 Dec 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 67 OF 2010 is on the DTCP register: Licence lapsed; the register prints its validity to 30 Aug 2018.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 2 May 2017, building plans 2 May 2017.Declared to HARERA, read 29 Oct 2026
The court record of Soni Infratech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 67 OF 2010 lapsed

    Named in this project’s application. Valid to 30 Aug 2018; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2023. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 12 HARERA files, with the dates we read them
Registration no.
100 OF 2017
Registration date
28 Aug 2017
Registration valid till
31 Dec 2023

Declared by the promoter to HARERA

Land area
12.281 (Acre) (49,699.44 sq m)
FAR
the application prints 174.9, which is not a ratio
licence
67 of 2010 DATED 31.08.2010
Estimated project cost
₹496.63 crore
Cost of land
₹47.33 crore
Layout plan, declared approved (field 5a)
2 May 2017
Building plans, declared approved
2 May 2017
Declared inventory · 33 types

Declared inventory — 33 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 8 units · 102.22 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY · 24 units · 113.38 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT · 56 units · 113.56 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+SERVENT · 18 units · 115.29 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+SERVENT · 8 units · 116.49 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT · 46 units · 118.24 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT · 4 units · 119.69 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+STUDY+SERVENT · 12 units · 121.49 sq m carpet · one flat
Statutory approvals, as declared · 13

Statutory approvals, as declared

  • I. SEWAGE TREATMENT SUPPLY — declared: already been obtained (8 Aug 2018)
  • II. ENVIRNMENT CLEARANCE — declared: already been obtained (14 Sept 2011)
  • III. AIRPORT AUTHORITY — declared: already been obtained (9 Jun 2011)
  • IV. FOREST — declared: already been obtained (21 Oct 2011)
  • V. POLLUTION — declared: already been obtained (20 Jun 2018)
  • VI. APPROVED BUILDING PLAN — declared: already been obtained (2 May 2017)
  • VII. LICENCE — declared: already been obtained (30 Aug 2010)
  • VIII. MINING — declared: already been obtained (10 Aug 2011)
  • IX. FIRE — declared: already been obtained (2 Sept 2011)
  • X. ELECTRICAL LOAD — declared: already been obtained (12 Jul 2013)
  • XI. HUDA CONSTRUCTION WATER — declared: already been obtained (8 Aug 2018)
  • XII. DRINKING WATER SUPPLY — declared: already been obtained (8 Aug 2018)
  • XIII. LICENCE RENEWAL APPLIED — declared: applied for but yet to receive (30 Aug 2018)
On file with HARERA · 12 files

On file with HARERA (12)

Plans

Site plan

1 file
Approved Site Plan14 Feb 2020

Layout plan

1 file
Latest Layout Plan14 Feb 2020

Zoning plan

1 file
Zoning Plan14 Feb 2020

Demarcation plan

1 file
Demarcation Plan14 Feb 2020

Building plans

1 file
Approved Building Plans, Full Set14 Feb 2020

Services

Service plans

1 file
Service Plans on the Layout14 Feb 2020

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule14 Feb 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration14 Feb 2020

Money

Accounts and finance

3 files
Cash Flow Statement14 Feb 2020Non-Default Certificate from a CA14 Feb 2020CA Certificate on the Application’s Figures14 Feb 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit14 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

67 OF 2010 · Soni Infratech · GURGAON-MANESAR

Licence valid to 30 Aug 2018

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 14 Feb 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

67 OF 2010

DTCP’s page showed no land schedule for licence 67 OF 2010 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate, residential flat
₹6,400 per sq ft

this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan14 Feb 2020

Layout plan

1 file
Latest Layout Plan14 Feb 2020

Building plans

1 file
Approved Building Plans, Full Set14 Feb 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (12 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1215 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Soni Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.