TRUMP RESIDENCES GURGAON
by Riverday Infrastructure · Sector 69, Gurugram
Not on our price list yet
Possession 30 Apr 2033 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 69, Gurugram0.8 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Registered by
- RIVERDAY INFRASTRUCTURE PRIVATE LIMITEDthe company that filed it, for Riverday Infrastructure
- 27 Jan 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Sep 2032Registration valid toHARERA, read 4 Nov 2026
- 30 Apr 2033Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,000–1,500 sq ft1,243 sq ft8
- 1,500–2,000 sq ft1,657 sq ft92
- 2,000–2,500 sq ft2,106 sq ft92
- 2,500–3,000 sq ft2,632–2,894 sq ft102
- 3,000 sq ft and above3,877 sq ft4
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings0.63 acres · 100%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningYes, in specific areas
- KitchenStone over kitchen counter, SS sink
- LiftsHigh speed elevators (passenger & service)
- FloorsMarble / laminated wooden flooring / vitrified tiles / ceramic tile
- WallsAcylic emulsion paint / oil bound distemper, over gypsum/cement plaster.
- BathroomsCP fiting & chinaware
- WindowsUPVC / aluminium double/single glazed unit doors & window
- Main doorMAIN door - doors with hardwares.
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)0.8 km
- Delhi–Gurugram–SNB RRTS4.6 km
- Dwarka ExpresswayOpen, 17 Aug 20254.7 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 6 Feb 2019 |
No photo of the project on file yet | Ocean Seven Buildtech | Same sector | — | — | 13 Feb 2023 |
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 6 Feb 2019 |
![]() | Smartworld Developers | Same sector | Under construction | ₹20,000/sq ft | 31 May 2032 |
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 31 Aug 2019 |
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 31 Dec 2027 |
| Pareena Infrastructures | 1.1 kmto its sector’s point | — | — | 11 Mar 2024 | |
Orion GalaxyNo photo on file yet | Soni Infratech | 1.1 kmto its sector’s point | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is TRUMP RESIDENCES GURGAON registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/925/657/2025/28. Valid to 30 Sep 2032.
The source ↗What is the possession timeline for TRUMP RESIDENCES GURGAON?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Apr 2033. Its registration runs to 30 Sep 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around TRUMP RESIDENCES GURGAON?From the records · Map pin and road lines, read 6 Sep 2026
TRUMP RESIDENCES GURGAON is in Sector 69, Gurugram; the site address declared to HARERA is Sector 69. In a straight line it is about 0.8 km from Sohna Elevated Corridor (NH-248A), 4.6 km from Delhi–Gurugram–SNB RRTS and 4.7 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building TRUMP RESIDENCES GURGAON?From the records · HARERA, read 4 Nov 2026
TRUMP RESIDENCES GURGAON is a Riverday Infrastructure project, registered by its company RIVERDAY INFRASTRUCTURE PRIVATE LIMITED.
The source ↗Riverday Infrastructure's projects and court recordThe records
What the registers hold for TRUMP RESIDENCES GURGAON: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/925/657/2025/28: Registered. Valid to 30 Sep 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 90 OF 2024 is on the DTCP register, valid to 17 Jul 2029.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 27 Jan 2025, building plans 27 Jan 2025.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 66 HARERA files, with the dates we read them
- Registration no.
- GGM/925/657/2025/28
- Registration valid till
- 30 Sept 2032
- Declared possession
- 30 Apr 2033
Declared by the promoter to HARERA
- Land area
- 0.633 (Acre) (2,561.66 sq m)
- FAR
- 4.98 proposed of 5.12 permissible
- licence
- 90 of 2024 dated 18.07.2024
- Estimated project cost
- ₹1917.71 crore
- Cost of land
- ₹557.70 crore
- Layout plan, declared approved (field 5a)
- 27 Jan 2025
- Building plans, declared approved
- 27 Jan 2025
- Construction to start
- 1 Feb 2025
- Completion declared for
- 30 Apr 2033
Declared inventory · 10 types
Declared inventory — 10 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 90 units · 195.7 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 90 units · 153.96 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 48 units · 245.87 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 50 units · 244.55 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 8 units · 115.45 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 2 units · 153.96 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 4 units · 360.2 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 2 units · 245.87 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 7
Statutory approvals, as declared
- I. DTCP LICENSE NO 90 OF 2024 DATED 18.07.2024 — declared: already been obtained (18 Jul 2024)
- II. LOI — declared: already been obtained (13 Mar 2024)
- III. AAI NOC — declared: already been obtained (14 Mar 2023)
- IV. FOREST NOC — declared: already been obtained (1 May 2024)
- V. SEWERAGE ASSURANCE — declared: already been obtained (5 Jul 2024)
- VI. STORM WATER ASSURANCE — declared: already been obtained (5 Jul 2024)
- VII. WATER SUPPLY ASSURANCE — declared: already been obtained (5 Jul 2024)
On file with HARERA · 66 files
On file with HARERA (66)
Plans
Site plan
3 filesLayout plan
3 filesZoning plan
2 filesBuilding plans
10 filesFloor plans
17 filesServices
Sewerage and drainage
4 filesWater supply
3 filesElectricity
1 fileRoads
1 fileService plans
2 filesApprovals and clearances
DTCP licence
7 filesEnvironment clearance
1 fileFire safety
1 fileOther NOCs and clearances
1 fileLand records
Land records
6 filesMoney
Accounts and finance
2 filesTimeline and progress
Construction schedule
1 fileThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
90 OF 2024 · Riverday Infrastucture Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 17 Jul 2029
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 24 Jan 2025 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
90 OF 2024: 22 parcels, 11.6687 acres in all, in Fazilpur jharsa (hadbast 99) and Badshapur (hadbast 87), tehsil Badshahpur.
The licence register prints the same licensed area, 11.6688 acres.
- 51//10/1 min2 kanal 17 marlaFazilpur jharsa (99)
- 51//10/2 min1 kanal 14 marlaFazilpur jharsa (99)
- 51//11/1 min3 kanal 6 marlaFazilpur jharsa (99)
- 51//11/2 min19 marlaFazilpur jharsa (99)
Show the other 18 parcels
- 51//19/23 kanalFazilpur jharsa (99)
- 51//2/25 marlaFazilpur jharsa (99)
- 51//20 min3 kanal 18 marlaFazilpur jharsa (99)
- 51//218 kanalFazilpur jharsa (99)
- 51//223 kanal 14 marlaFazilpur jharsa (99)
- 51//9/14 kanal 4 marlaFazilpur jharsa (99)
- 42//107 kanal 18 marlaBadshapur (87)
- 42//116 kanal 13 marlaBadshapur (87)
- 42//128 kanalBadshapur (87)
- 42//198 kanalBadshapur (87)
- 42//228 kanalBadshapur (87)
- 42//98 kanalBadshapur (87)
- 43//153 kanal 7 marlaBadshapur (87)
- 43//61 kanal 1 marlaBadshapur (87)
- 65//28 kanalBadshapur (87)
- 65//3/16 marlaBadshapur (87)
- 42//261 kanal 7 marlaBadshapur (87)
- rectangle 51, kila 1/2 min18 marlaFazilpur jharsa (99)
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village you want: Fazilpur jharsa (hadbast 99) or Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 51//10/1 min.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
3 filesLayout plan
3 filesBuilding plans
10 filesFloor plans
17 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (66 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3283 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Riverday Infrastructure
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.


