MiCasa

by Pareena Infrastructures · Sector 68, Gurugram

Not on our price list yet

Possession 11 Mar 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 68, Gurugram0.3 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
468–1,241 sq ft
In m²about 43–115 m², as declared
Registered
28 Aug 2017
Registered by
PAREENA INFRASTRUCTURES PVT. LTD.the company that filed it, for Pareena Infrastructures
Timeline
  1. 28 Apr 2015Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 28 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 11 Mar 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 30 Dec 2025Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

952homes, 468 to 1,241 sq ft of carpet area
  • Under 1,000 sq ft468–839 sq ft816
  • 1,000–1,500 sq ft1,056–1,241 sq ft136

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 168 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningNot providing
  • KitchenGranite counter, ceramic tiles upto 2 FT above counter and REST OBD
  • Kitchen appliancesSEMI modular kitchen below counter only
  • LiftsPassenger & service lifts in each tower
  • WardrobesNot providing
  • FloorsVitrified tiles
  • WallsOil bound distemper
  • BathroomsCP fitting & china WARE

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 68, GurugramSector 68, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20255.7 km
  • Delhi–Gurugram–SNB RRTS5.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is MiCasa registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 99 OF 2017, registered on 28 Aug 2017. Ended 30 Dec 2025. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for MiCasa?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 11 Mar 2024. Its registration runs to 30 Dec 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around MiCasa?From the records · Map pin and road lines, read 6 Sep 2026

MiCasa is in Sector 68, Gurugram; the site address declared to HARERA is Nurpur-Jharsa & Badshapur Sector 68. In a straight line it is about 0.3 km from Sohna Elevated Corridor (NH-248A), 5.7 km from Dwarka Expressway and 5.7 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building MiCasa?From the records · HARERA, read 4 Nov 2026

MiCasa is a Pareena Infrastructures project, registered by its company PAREENA INFRASTRUCTURES PVT. LTD..

The source ↗Pareena Infrastructures's projects and court record

The records

What the registers hold for MiCasa: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 99 OF 2017: Registration expired. Ended 30 Dec 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 92 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 12 Aug 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 28 Apr 2015, building plans 28 Apr 2015.Declared to HARERA, read 29 Oct 2026
The court record of Pareena Infrastructures’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Dec 2025. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 92 OF 2014 lapsed

    Named in this project’s application. Valid to 12 Aug 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Red flag: Licence 94 OF 2014 lapsed

    Named in this project’s application. Valid to 12 Aug 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Licence 111 OF 2013 ends soon

    Named in this project’s application. Valid to 26 Dec 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 9 HARERA files, with the dates we read them
Registration no.
99 OF 2017
Registration date
28 Aug 2017
Registration valid till
30 Dec 2025
Declared possession
11 Mar 2024

Declared by the promoter to HARERA

Land area
13.48275 (Acre) (54,562.75 sq m)
FAR
the application prints 174.9, which is not a ratio
licence
License No. 111 of 2013 dated 27.12.2013, License No. 92 of 2014 dated 13.08.2014 and License No. 94 of 2014 dated 13.08.2014
Estimated project cost
₹444.69 crore
Cost of land
₹23.76 crore
Layout plan, declared approved (field 5a)
28 Apr 2015
Building plans, declared approved
28 Apr 2015
Completion declared for
11 Mar 2024
Declared inventory · 10 types

Declared inventory — 10 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+ SERVANT · 102 units · 115.287 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 34 units · 98.137 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 80 units · 77.957 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 120 units · 77.227 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK · 52 units · 67.012 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK · 16 units · 66.552 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK · 140 units · 66.31 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK · 204 units · 44.613 sq m carpet · one flat
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. BUILDING PLANS APPROVALS — declared: already been obtained (28 Apr 2015)
  • II. ENVIRONMENT CLEARANCE — declared: already been obtained (20 May 2016)
  • III. AIRPORT HEIGHT — declared: already been obtained (30 Oct 2015)
  • IV. FIRE FIGHTING SCHEME — declared: already been obtained (24 Nov 2015)
  • V. FOREST NOC — declared: already been obtained (5 Nov 2015)
  • VI. WATER ASSURANCE — declared: already been obtained (17 Dec 2015)
  • VII. ELECT. ASSURANCE — declared: already been obtained (24 Dec 2014)
On file with HARERA · 9 files

On file with HARERA (9)

Plans

Site plan

1 file
Approved Site Plan17 Jan 2020

Layout plan

1 file
Latest Layout Plan17 Jan 2020

Zoning plan

1 file
Zoning Plan17 Jan 2020

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded8 Aug 2023

DTCP licence

1 file
Licence Copy with Land Schedule17 Jan 2020

Money

Accounts and finance

1 file
Non-Default Certificate from a CA17 Jan 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit17 Jan 2020

HARERA’s orders

HARERA’s orders

1 file
Extension No. 12 of 2023 dated 19.06.20233 Jul 2023

Other filings

Other filings

1 file
Project Continuation- RC/REP/HARERA/GGM/99 of 2017/7(3)/47/2024/06 Dated 23.07.202412 Aug 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 3 DTCP licences named on the application

111 OF 2013 · Pareena Infrastructure Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 26 Dec 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

92 OF 2014 · Pareena Infrastructure Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 12 Aug 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

94 OF 2014 · Pareena Infrastructure Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 12 Aug 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 17 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 3 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

111 OF 2013: 27 parcels, 10.1188 acres in all, in Noorpur jharsa (hadbast 165) and Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 10.12 acres.

  • 2//132 kanal 5 marlaNoorpur jharsa (165)
  • 2//142 kanal 14 marlaNoorpur jharsa (165)
  • 2//16/2/116 marlaNoorpur jharsa (165)
  • 2//16/2/27 kanalNoorpur jharsa (165)
Show the other 23 parcels
  • 2//17/14 marlaNoorpur jharsa (165)
  • 2//18/1/111 marlaNoorpur jharsa (165)
  • 2//18/2/15 marlaNoorpur jharsa (165)
  • 2//23/1 min17 marlaNoorpur jharsa (165)
  • 2//245 kanal 13 marlaNoorpur jharsa (165)
  • 2//25/12 kanal 18 marlaNoorpur jharsa (165)
  • 2//25/2/28 marlaNoorpur jharsa (165)
  • 3//206 kanal 7 marlaNoorpur jharsa (165)
  • 3//218 kanalNoorpur jharsa (165)
  • 4//1/16 kanalNoorpur jharsa (165)
  • 4//1/2/13 marlaNoorpur jharsa (165)
  • 5//5/210 marlaNoorpur jharsa (165)
  • 5//5/3/1area printed as 0Noorpur jharsa (165)
  • 108//17 kanal 2 marlaBadshapur (87)
  • 108//104 kanal 13 marlaBadshapur (87)
  • 108//2/110 marlaBadshapur (87)
  • 108//9/23 kanal 13 marlaBadshapur (87)
  • 109//56 kanal 8 marlaBadshapur (87)
  • 109//61 kanal 18 marlaBadshapur (87)
  • 2//16/11 kanal 4 marlaNoorpur jharsa (165)
  • 2//17/27 kanal 2 marlaNoorpur jharsa (165)
  • 2//17/1/114 marlaNoorpur jharsa (165)
  • 2//18/1/2/13 kanal 4 marlaNoorpur jharsa (165)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

92 OF 2014: 4 parcels, 0.6375 acres in all, in Noorpur jharsa (hadbast 165), tehsil Badshahpur.

The licence register prints the same licensed area, 0.64 acres.

  • 4//10/2/24 kanal 16 marla
  • 4//11/1/12 marla
  • 4//11/2/12 marla
  • 4//11/3/12 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

94 OF 2014: 6 parcels, 2.7264 acres in all, in Noorpur jharsa (hadbast 165), tehsil Badshahpur.

The licence register prints the same licensed area, 2.73 acres.

  • 3//194 kanal 2 marla 2 sarsai
  • 3//228 kanal 16 marla
  • 4//1/3/28 marla
  • 4//10/2/112 marla
Show the other 2 parcels
  • 4//2/13 kanal 15 marla
  • 4//2/24 kanal 3 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Noorpur jharsa (hadbast 165) or Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 2//13.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,400 per sq ft

this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan17 Jan 2020

Layout plan

1 file
Latest Layout Plan17 Jan 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (9 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1188 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pareena Infrastructures

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.